文
论文分享
演练场
杂货铺
论文推荐
字
编辑器下载
登录
注册
J. Cochran
发表
Use of Ground Freezing for Connecting two Tunnel Boring Machine-Driven Tunnels 300 Feet Underground
U. Gwildis, J. Cochran, J. Clare, 2012 .
Launcher/rocket dynamics and passive control
J. Cochran, D. Christensen, 1981 .
What to do when a TBM is stopped 320 feet deep below a residential neighborhood and 10,000 feet from the nearest shaft? - Brightwater Conveyance System Final Design Project, King County, Washington
U. Gwildis, J. Cochran, J. Clare, 2012 .