文
论文分享
演练场
杂货铺
论文推荐
字
编辑器下载
登录
注册
I.-Hong Chung
发表
A branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning consideration
Lamjed Ben Said, Chin-Chia Wu, Shuenn-Ren Cheng, 2020, Engineering Optimization.