文
论文分享
演练场
杂货铺
论文推荐
字
编辑器下载
登录
注册
S. Taghipoor
发表
Utilization of Morrison Mine experience in management and mitigation of micro-seismic risk at the design stage of the Victoria Project
M. Jakubowski, S. Taghipoor, J. M. Watson, 2015 .
Application of Numerical Modelling to Study the Efficiency of Roof Bolting Pattern in East 1 Main Gate of Tabas Coal Mine
S. Taghipoor, 2008 .