Transforming existing 220 kV double circuit line into 400 kV single circuit line in Romania

The transmission system operators TRANSELECTRICA (TEL-Romania) and EMS (Serbia) have decided to increase the interconnection capacity on the common border by building a new 400 kV transmission line.