Bounds for production lot sizing with machine breakdowns
暂无分享,去创建一个
[1] Charles S. Tapiero,et al. Maintenance of an unreliable M/G/1 queue-like job shop , 1987, Queueing Syst. Theory Appl..
[2] G. Thomas. Calculus and Analytic Geometry , 1953 .
[3] A. Seidmann,et al. Production lot sizing with machine breakdowns , 1992 .
[4] M. J. M. Posner,et al. Analysis of a production-inventory system with unreliable production facility , 1989 .
[5] Charles S. Tapiero. Continuous quality production and machine maintenance , 1986 .
[6] Morton J. M. Posner,et al. Production-Inventory Systems with Unreliable Machines , 1994, Oper. Res..
[7] George Tagaras. An Integrated Cost Model for the Joint Optimization of Process Control and Maintenance , 1988 .
[8] Christos Koulamas. Single‐Stage and Serial Production Line Systems with Unreliable Machines and General Probability Distributions , 1993 .
[9] Awi Federgruen,et al. Optimal Maintenance Policies for Single-Server Queueing Systems Subject to Breakdowns , 1990, Oper. Res..
[10] Yushin Hong Senior Member Iie,et al. The analysis of a production line with unreliable machines and random processing times , 1992 .
[11] Liliane Pintelon,et al. Production Batching with Machine Breakdowns and Safety Stocks , 1992, Oper. Res..
[12] Philippe Solot,et al. Do not forget the breakdowns and the maintenance operations in FMS design problems , 1990 .
[13] Panganamala Ramana Kumar,et al. Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems , 1988, Oper. Res..