Potentials of possible machine systems for directly loading logs in cut-to-length harvesting
暂无分享,去创建一个
[1] Lars Eliasson,et al. Effects of three harvesting work methods on Harwarder productivity in final felling , 2004 .
[2] Radomir Klvac,et al. Characteristic fuel consumption and exhaust emissions in fully mechanized logging operations , 2009, Journal of Forest Research.
[3] Antti Asikainen,et al. Simulation of stump crushing and truck transport of chips , 2010 .
[4] Dan Bergström,et al. Path tracking in forest terrain by an autonomous forwarder , 2011 .
[5] Ian A. Andrews,et al. Broadaxe to Flying Shear: The Mechanization of Forest Harvesting East of the Rockies , 1999 .
[6] Raffaele Spinelli,et al. Analyzing and Estimating Delays in Harvester Operations , 2008 .
[7] Lars Eliasson,et al. Productivity in Final Felling and Thinning for a Combined Harvester-Forwarder (Harwarder) , 2003 .
[8] Anton S. Shiriaev,et al. Analysis of human-operated motions and trajectory replanning for kinematically redundant manipulators , 2009, 2009 IEEE/RSJ International Conference on Intelligent Robots and Systems.
[9] Jori Uusitalo,et al. Applying the activity-based costing to cut-to-length timber harvesting and trucking. , 2009 .
[10] U. Hallonborg,et al. Reckoning on harwarders for final felling. , 2000 .
[11] Antti Asikainen. Chipping terminal logistics , 1998 .
[12] Dominik Röser,et al. Cost competitiveness of harwarders in CTL-logging conditions in Finland - a discrete-event simulation study at the contractor level , 2006 .
[13] Dan Bergström,et al. Analyses of a single-machine system for harvesting pulpwood and/or energy-wood in early thinnings , 2013 .
[14] Antti Asikainen. Integration of Work Tasks and Supply Chains in Wood Harvesting - Cost Savings or Complex Solutions? , 2004 .
[15] Thomas Hellström,et al. Real-time path planning using a simulator-in-the-loop , 2009 .
[16] Bruce Talbot,et al. Analysis of Two Simulated In-field Chipping and Extraction Systems in Spruce Thinnings , 2005 .
[17] Bruce Talbot,et al. Fuel Consumption In Forwarders , 2003 .
[18] Jori Uusitalo,et al. Time consumption analysis of the mechanized cut-to-length harvesting system , 2006 .
[19] Rolf Björheden,et al. Basic Time Concepts For International Comparisons of Time Study Reports , 1991 .
[20] Bruce Talbot,et al. Assessing the Utility of Two Integrated Harvester-Forwarder Machine Concepts Through Stand-Level Simulation , 2003 .
[21] Thomas Hellström,et al. Autonomous Forest Vehicles: Historic, envisioned, and state-of-the-art , 2009 .
[22] Ola Lindroos. Evaluation of Technical and Organizational Approaches for Directly Loading Logs in Mechanized Cut-to-Length Harvesting , 2012 .