Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM

The adoption of prefabricated building systems has grown due to the need to reduce duration and cost of construction projects, as well as to improve quality and working conditions. However, the ado...

[1]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[2]  David Greenwood,et al.  The adoption of 4D BIM in the UK construction industry: an innovation diffusion approach , 2017 .

[3]  Nashwan Dawood,et al.  Construction workspace management within an Industry Foundation Class-Compliant 4D tool , 2015 .

[4]  George Norman,et al.  The role of logistics in the materials flow control process , 1998 .

[5]  Timo Hartmann,et al.  4D CAD models to support the coordination of construction activities between contractors , 2015 .

[6]  J. Aken Management Research Based on the Paradigm of the Design Sciences: The Quest for Field-Tested and Grounded Technological Rules , 2004 .

[7]  M. Naim,et al.  Engineer-to-order supply chain management: A literature review and research agenda , 2009 .

[8]  Helena Johnsson,et al.  Platform use in systems building , 2014 .

[9]  Iris D. Tommelein,et al.  Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .

[10]  Hyunsoo Kim,et al.  Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects , 2014 .

[11]  Robert Owen,et al.  Interaction of Lean and Building Information Modeling in Construction , 2010 .

[12]  Qunzhou Yu,et al.  A BIM-based Dynamic Model for Site Material Supply , 2016 .

[13]  P. Baker,et al.  The Handbook of Logistics and Distribution Management : Understanding the Supply Chain Ed. 6 , 2017 .

[14]  Jwm Will Bertrand,et al.  Production control in engineer-to-order firms , 1993 .

[15]  Tarek Zayed,et al.  Quantitative Assessment of Building Constructability Using BIM and 4D Simulation , 2016 .

[16]  G. Susman,et al.  An Assessment of the Scientific Merits of Action Research. , 1978 .

[17]  Gregory A. Howell,et al.  SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .

[18]  Javad Majrouhi Sardroud,et al.  Approaching Industrialization of Buildings and Integrated Construction Using Building Information Modeling , 2016 .

[19]  Jian-Ping Zhang,et al.  Application of 4D for dynamic site layout and management of construction projects , 2005 .

[20]  Danijel Rebolj,et al.  Supply-chain transparency within industrialized construction projects , 2014, Comput. Ind..

[21]  Mani Golparvar-Fard,et al.  Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs , 2009 .

[22]  Burcu Akinci,et al.  Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains , 2008 .

[23]  Kwok-wing Chau,et al.  Four-dimensional visualization of construction scheduling and site utilization , 2004 .

[24]  C. Eden,et al.  Action Research for Management Research , 1996 .

[25]  Jian-Ping Zhang,et al.  4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .

[26]  Charles M. Eastman,et al.  BIM-based fall hazard identification and prevention in construction safety planning , 2015 .

[27]  Christopher Earl,et al.  Modelling supply chain management processes in engineer-to-order companies , 1999 .

[28]  David R. Riley,et al.  Sustainable performance criteria for construction method selection in concrete buildings , 2010 .

[29]  R. Barry Johnston,et al.  Planning or organizing: The implications of theories of activity for management of operations , 1996 .

[30]  Bilal Succar,et al.  Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .

[31]  Sandeep Purao,et al.  Action Design Research , 2011, MIS Q..

[32]  Lars Hvam,et al.  Efficient on‐site construction: learning points from a German platform for housing , 2011 .

[33]  Gary Sullivan Managing Construction Logistics , 2010 .

[34]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[35]  Tomaso Poggio,et al.  Learning to see , 1996 .

[36]  Jan Holmström,et al.  Bridging Practice and Theory: A Design Science Approach , 2009, Decis. Sci..

[37]  Rafaela Bortolini,et al.  Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling , 2019, Automation in Construction.

[38]  Wallace J. Hopp,et al.  To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..

[39]  Low Sui Pheng,et al.  Just-in-Time Management of Precast Concrete Components , 2001 .

[40]  Erwin Rauch,et al.  Synchronization of the Manufacturing Process and On-site Installation in ETO Companies , 2014 .

[41]  Walid Y. Thabet,et al.  A Virtual Construction Environment for preconstruction planning , 2003 .