Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM
暂无分享,去创建一个
Carlos Torres Formoso | Fernanda Saidelles Bataglin | Daniela Dietz Viana | Iamara Rossi Bulhões | C. Formoso | D. D. Viana | F. S. Bataglin
[1] Charles M. Eastman,et al. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .
[2] David Greenwood,et al. The adoption of 4D BIM in the UK construction industry: an innovation diffusion approach , 2017 .
[3] Nashwan Dawood,et al. Construction workspace management within an Industry Foundation Class-Compliant 4D tool , 2015 .
[4] George Norman,et al. The role of logistics in the materials flow control process , 1998 .
[5] Timo Hartmann,et al. 4D CAD models to support the coordination of construction activities between contractors , 2015 .
[6] J. Aken. Management Research Based on the Paradigm of the Design Sciences: The Quest for Field-Tested and Grounded Technological Rules , 2004 .
[7] M. Naim,et al. Engineer-to-order supply chain management: A literature review and research agenda , 2009 .
[8] Helena Johnsson,et al. Platform use in systems building , 2014 .
[9] Iris D. Tommelein,et al. Pull-Driven Scheduling for Pipe-Spool Installation: Simulation of Lean Construction Technique , 1998 .
[10] Hyunsoo Kim,et al. Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects , 2014 .
[11] Robert Owen,et al. Interaction of Lean and Building Information Modeling in Construction , 2010 .
[12] Qunzhou Yu,et al. A BIM-based Dynamic Model for Site Material Supply , 2016 .
[13] P. Baker,et al. The Handbook of Logistics and Distribution Management : Understanding the Supply Chain Ed. 6 , 2017 .
[14] Jwm Will Bertrand,et al. Production control in engineer-to-order firms , 1993 .
[15] Tarek Zayed,et al. Quantitative Assessment of Building Constructability Using BIM and 4D Simulation , 2016 .
[16] G. Susman,et al. An Assessment of the Scientific Merits of Action Research. , 1978 .
[17] Gregory A. Howell,et al. SHIELDING PRODUCTION: ESSENTIAL STEP IN PRODUCTION CONTROL , 1998 .
[18] Javad Majrouhi Sardroud,et al. Approaching Industrialization of Buildings and Integrated Construction Using Building Information Modeling , 2016 .
[19] Jian-Ping Zhang,et al. Application of 4D for dynamic site layout and management of construction projects , 2005 .
[20] Danijel Rebolj,et al. Supply-chain transparency within industrialized construction projects , 2014, Comput. Ind..
[21] Mani Golparvar-Fard,et al. Visualization of construction progress monitoring with 4D simulation model overlaid on time-lapsed photographs , 2009 .
[22] Burcu Akinci,et al. Formalization of the Flow of Component-Related Information in Precast Concrete Supply Chains , 2008 .
[23] Kwok-wing Chau,et al. Four-dimensional visualization of construction scheduling and site utilization , 2004 .
[24] C. Eden,et al. Action Research for Management Research , 1996 .
[25] Jian-Ping Zhang,et al. 4D Dynamic Management for Construction Planning and Resource Utilization , 2004 .
[26] Charles M. Eastman,et al. BIM-based fall hazard identification and prevention in construction safety planning , 2015 .
[27] Christopher Earl,et al. Modelling supply chain management processes in engineer-to-order companies , 1999 .
[28] David R. Riley,et al. Sustainable performance criteria for construction method selection in concrete buildings , 2010 .
[29] R. Barry Johnston,et al. Planning or organizing: The implications of theories of activity for management of operations , 1996 .
[30] Bilal Succar,et al. Building information modelling framework: A research and delivery foundation for industry stakeholders , 2009 .
[31] Sandeep Purao,et al. Action Design Research , 2011, MIS Q..
[32] Lars Hvam,et al. Efficient on‐site construction: learning points from a German platform for housing , 2011 .
[33] Gary Sullivan. Managing Construction Logistics , 2010 .
[34] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[35] Tomaso Poggio,et al. Learning to see , 1996 .
[36] Jan Holmström,et al. Bridging Practice and Theory: A Design Science Approach , 2009, Decis. Sci..
[37] Rafaela Bortolini,et al. Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modeling , 2019, Automation in Construction.
[38] Wallace J. Hopp,et al. To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..
[39] Low Sui Pheng,et al. Just-in-Time Management of Precast Concrete Components , 2001 .
[40] Erwin Rauch,et al. Synchronization of the Manufacturing Process and On-site Installation in ETO Companies , 2014 .
[41] Walid Y. Thabet,et al. A Virtual Construction Environment for preconstruction planning , 2003 .