Experimental investigation of the cyclic response of reinforced precast concrete framed structures
暂无分享,去创建一个
Davide Bellotti | Roberto Nascimbene | E. Brunesi | D. Bolognini | E. Brunesi | R. Nascimbene | D. Bolognini | D. Bellotti
[1] Paolo Negro,et al. Pseudodynamic tests on a full-scale 3-storey precast concrete building: behavior of the mechanical connections and floor diaphragms , 2013 .
[2] Andrea Belleri,et al. Seismic performance and retrofit of precast concrete grouted sleeve connections , 2012 .
[3] E. Vintzēleou,et al. BEHAVIOR OF DOWELS UNDER CYCLIC DEFORMATIONS. , 1987 .
[4] Neil M. Hawkins,et al. Performance of precast/prestressed concrete building structures during Nirthridge earthquake , 1994 .
[5] Andrew S. Whittaker,et al. Seismic Performance of Industrial Facilities Affected by the 1999 Turkey Earthquake , 2006 .
[6] Mario E. Rodriguez,et al. Tests on a Half-Scale Two-Story Seismic-Resisting Precast Concrete Building , 2005 .
[7] Rui Pinho,et al. Seismic fragility of Italian RC precast industrial structures , 2015 .
[8] Roberto Nascimbene,et al. Evaluation of the shear capacity of precast-prestressed hollow core slabs: numerical and experimental comparisons , 2015 .
[9] Minehiro Nishiyama,et al. Lessons learned from the Kobe earthquake: a Japanese perspective , 1995 .
[10] Andrea Belleri,et al. Seismic Performance of Precast Industrial Facilities Following Major Earthquakes in the Italian Territory , 2015 .
[11] Gaetano Manfredi,et al. Seismic assessment of existing precast industrial buildings using static and dynamic nonlinear analyses , 2008 .
[12] Korhan Adalier,et al. Structural engineering aspects of the June 27, 1998 Adana–Ceyhan (Turkey) earthquake , 2001 .
[13] Robert E. Englekirk. Overview of ATC Seminar on Design of Prefabricated Concrete Buildings for Earthquake Loads , 1982 .
[14] Ioannis N. Psycharis,et al. Assessment of the seismic design of precast frames with pinned connections from shaking table tests , 2012, Bulletin of Earthquake Engineering.
[15] Robert E. Englekirk. Seismic Design Considerations for Precast Concrete Multistory Buildings , 1990 .
[16] Tatjana Isaković,et al. Cyclic response of slender RC columns typical of precast industrial buildings , 2008 .
[17] Negro Paolo,et al. Design Guidelines for Connections of Precast Structures under Seismic Actions , 2012 .
[18] T. P. Tassios,et al. Shear Resistance of Connections Between Reinforced Concrete Linear Precast Elements , 1989 .
[19] Luigi Sorrentino,et al. Failure of industrial structures induced by the Emilia (Italy) 2012 earthquakes , 2013 .
[20] Paolo Negro,et al. Performance of industrial buildings during the Emilia earthquakes in Northern Italy and recommendations for their strengthening , 2014, Bulletin of Earthquake Engineering.
[21] Ned M. Cleland,et al. Observations from the February 27, 2010, Earthquake in Chile , 2012 .
[22] Robert E. Englekirk,et al. Seismic Design of Reinforced and Precast Concrete Buildings , 2003 .
[23] Alberto Michelini,et al. ShakeMaps during the Emilia sequence , 2012 .
[24] Harris P. Mouzakis,et al. Shear resistance of pinned connections of precast members to monotonic and cyclic loading , 2012 .