Distribution-free cumulative sum control charts using bootstrap-based control limits

This paper deals with phase II, univariate, statistical process control when a set of in-control data is available, and when both the in-control and out-of-control distributions of the process are unknown. Existing process control techniques typically require substantial knowledge about the in-control and out-of-control distributions of the process, which is often difficult to obtain in practice. We propose (a) using a sequence of control limits for the cumulative sum (CUSUM) control charts, where the control limits are determined by the conditional distribution of the CUSUM statistic given the last time it was zero, and (b) estimating the control limits by bootstrap. Traditionally, the CUSUM control chart uses a single control limit, which is obtained under the assumption that the in-control and out-of-control distributions of the process are Normal. When the normality assumption is not valid, which is often true in applications, the actual in-control average run length, defined to be the expected time duration before the control chart signals a process change, is quite different from the nominal in-control average run length. This limitation is mostly eliminated in the proposed procedure, which is distribution-free and robust against different choices of the in-control and out-of-control distributions.

[1]  E. S. Page CONTINUOUS INSPECTION SCHEMES , 1954 .

[2]  S. Shapiro,et al.  An Analysis of Variance Test for Normality (Complete Samples) , 1965 .

[3]  J. Andel Sequential Analysis , 2022, The SAGE Encyclopedia of Research Design.

[4]  G. Lorden PROCEDURES FOR REACTING TO A CHANGE IN DISTRIBUTION , 1971 .

[5]  M. R. Reynolds Approximations to the Average Run Length in Cumulative Sum Control Charts , 1975 .

[6]  Marion R. Reynolds,et al.  A Nonparametric Procedure for Process Control Based on Within-Group Ranking , 1979 .

[7]  Bernard W. Silverman,et al.  Density Estimation for Statistics and Data Analysis , 1987 .

[8]  G. Moustakides Optimal stopping times for detecting changes in distributions , 1986 .

[9]  P. J. Green,et al.  Density Estimation for Statistics and Data Analysis , 1987 .

[10]  M. Falk,et al.  Weak Convergence of Smoothed and Nonsmoothed Bootstrap Quantile Estimates , 1989 .

[11]  Thomas J. DiCiccio,et al.  On Smoothing and the Bootstrap , 1989 .

[12]  L. Franklin,et al.  Bootstrap Lower Confidence Limits for Capability Indices , 1992 .

[13]  L. Meulbroek,et al.  An Empirical Analysis of Illegal Insider Trading , 1992 .

[14]  M. Chavance [Jackknife and bootstrap]. , 1992, Revue d'epidemiologie et de sante publique.

[15]  R. Plante,et al.  Statistical Process Control via the Subgroup Bootstrap , 1995 .

[16]  Jen Tang,et al.  Control Charts for Dependent and Independent Measurements Based on Bootstrap Methods , 1996 .

[17]  Zhang Wu,et al.  BOOTSTRAP CONTROL CHARTS , 1996 .

[18]  George C. Runger,et al.  Designing control charts using an empirical reference distribution , 1996 .

[19]  Nien Fan Zhang,et al.  A statistical control chart for stationary process data , 1998 .

[20]  Karen A. F. Copeland Cumulative Sum Charts and Charting for Quality Improvement , 1999 .

[21]  Marion R. Reynolds,et al.  Control Charts for Monitoring the Mean and Variance of Autocorrelated Processes , 1999 .

[22]  S. Steiner EWMA Control Charts with Time-Varying Control Limits and Fast Initial Response , 1999 .

[23]  Michael Wood,et al.  The use of resampling for estimating control chart limits , 1999, J. Oper. Res. Soc..

[24]  R J Cook,et al.  Monitoring paired binary surgical outcomes using cumulative sum charts. , 1999, Statistics in medicine.

[25]  P. Stenson,et al.  Human Gene Mutation Database—A biomedical information and research resource , 2000, Human mutation.

[26]  Peihua Qiu,et al.  A Rank-Based Multivariate CUSUM Procedure , 2001, Technometrics.

[27]  S. Chakraborti,et al.  Nonparametric Control Charts: An Overview and Some Results , 2001 .

[28]  Elisabeth J. Umble,et al.  Cumulative Sum Charts and Charting for Quality Improvement , 2001, Technometrics.

[29]  David J. Hand,et al.  Statistical fraud detection: A review , 2002 .

[30]  Stephen M. Scariano,et al.  Adapting EWMA Control Charts for Batch-Correlated Data , 2003 .

[31]  Charles W. Champ,et al.  The Run Length Distribution of the CUSUM with Estimated Parameters , 2004 .

[32]  S. Shapiro,et al.  An analysis of variance test for normality ( complete samp 1 es ) t , 2007 .

[33]  M. Kenward,et al.  An Introduction to the Bootstrap , 2007 .

[34]  Peihua Qiu,et al.  Distribution-free multivariate process control based on log-linear modeling , 2008 .

[35]  David Hinkley,et al.  Bootstrap Methods: Another Look at the Jackknife , 2008 .