Simulation Modelling In a Availability Thermal Power Plant

The present paper deals with the opportunities for the availability simulation modelling and maintenance decision making in thermal power plant. These opportunities will be identified by evaluation of a simulation model to be built for the steam and water analysis system (SWAS) of a thermal power plant. This feasibility study covers two areas: development of an availability simulation model and decision making with the help of developed model. The present system of thermal plant under study consists of six subsystems with two possible states: working and failed. A probabilistic simulated model using Markov approach has been developed considering some assumptions. Availability decision matrix for each subsystem is also developed, which provide various availability levels. On the basis of this study, performance or availability of each subsystem of SWAS is analyzed and then maintenance priorities are decided for present system.

[1]  P. O'Connor,et al.  Practical Reliability Engineering , 1981 .

[2]  Marvin Rausand,et al.  System Reliability Theory , 2020, Wiley Series in Probability and Statistics.

[3]  James A. Ritcey,et al.  Computationally-efficient phased-mission reliability analysis for systems with variable configurations , 1992 .

[4]  Miroslaw Malek,et al.  Survey of software tools for evaluating reliability, availability, and serviceability , 1988, CSUR.

[5]  A. K. Sharma,et al.  Development of simulation model for performance evaluation of feed water system in a typical thermal power plant , 2011 .

[6]  R. W. Butler The SURE reliability analysis program , 1986 .

[7]  Arun K. Somani,et al.  Reliability computation of systems with latent-failures and monitoring , 1994, Proceedings of Annual Reliability and Maintainability Symposium (RAMS).

[8]  Kishor S. Trivedi,et al.  Power-hierarchy of dependability-model types , 1994 .

[9]  Sanjeev Kumar,et al.  Performance modelling and simulated availability of shell gasification and carbon recovery unit of urea plant , 2007 .

[10]  Richard G Lamb Availability Engineering and Management for Manufacturing Plant Performance , 1995 .

[11]  Kishor S. Trivedi,et al.  Reliability Modeling Using SHARPE , 1987, IEEE Transactions on Reliability.

[12]  Igor Ushakov,et al.  Reliability: Past, Present, Future , 2000 .

[13]  Kishor S. Trivedi,et al.  SPNP: stochastic Petri net package , 1989, Proceedings of the Third International Workshop on Petri Nets and Performance Models, PNPM89.

[14]  B. Dhillion,et al.  Reliability engineering in systems design and operation , 1983 .

[15]  A. K. Sharma,et al.  A PERFORMANCE MODELING AND DECISION SUPPORT SYSTEM FOR A FEED WATER UNIT OF A THERMAL POWER PLANT , 2012 .

[16]  Uday Kumar,et al.  Reliability analysis of mining equipment: A case study of a crushing plant at Jajarm Bauxite Mine in Iran , 2008, Reliab. Eng. Syst. Saf..

[17]  Jean Arlat,et al.  SURF-2: A program for dependability evaluation of complex hardware and software systems , 1993, FTCS-23 The Twenty-Third International Symposium on Fault-Tolerant Computing.

[18]  Ricky W. Butler,et al.  An Abstract Language for Specifying Markov Reliability Models , 1986, IEEE Transactions on Reliability.

[19]  Charles E Ebeling,et al.  An Introduction to Reliability and Maintainability Engineering , 1996 .

[20]  William H. Sanders,et al.  Dependability evaluation using UltraSAN , 1993, FTCS-23 The Twenty-Third International Symposium on Fault-Tolerant Computing.

[21]  M. R. Rotab Khan,et al.  Availability simulation of an ammonia plant , 1995 .

[22]  M. Grassi,et al.  AIAA Guidance, Navigation, and Control Conference , 2008 .

[23]  Jorge L. Romeu,et al.  Practical Reliability Engineering , 2003, Technometrics.

[24]  A. Sorabh Gupta,et al.  Simulation Model for Coal Crushing System of a Typical Thermal Power Plant , 2009 .

[25]  L. Wolstenholme Reliability Modelling: A Statistical Approach , 1999 .

[26]  Zoltan Papp,et al.  Probabilistic reliability engineering , 1995 .

[27]  A. K. Sharma,et al.  Reliability and availability analysis of the ash handling unit of steam thermal power plant , 2009 .

[28]  Tae-Jin Lim,et al.  Analysis of system reliability with dependent repair modes , 2000, IEEE Trans. Reliab..

[29]  P. C. Tewari,et al.  An availability simulation model and performance analysis of a coal handling unit of a typical thermal plant , 2009 .

[30]  P. C. Tewari,et al.  Simulation Model for Stochastic Analysis and Performance Evaluation of Condensate System of a Thermal Power Plant , 2010 .

[31]  D. N. Prabhakar Murthy,et al.  Case studies in reliability and maintenance , 2002 .

[32]  Navneet Arora,et al.  Availability analysis of steam and power generation systems in the thermal power plant , 1997 .

[33]  Peng Huang,et al.  Stochastic Models in Reliability , 1999, Technometrics.