Transmission Congestion and Competition on Power Generation Expansion

Generation expansion planning involves decisions on location and capacity of new generation, which may lead to adding or relieving congestion in transmission lines and to increasing or reducing competition in deregulated markets. Generation expansion may encounter congestion in the transmission network by constrained single-line flows as well as flowgate transfer capabilities. In this paper, a model to study the interaction between competition and transmission congestion on power generation expansion is proposed. The generation expansion problem is modeled as a Cournot competition game. Network transmission constraints are included in the optimal generation expansion problem to comply with power flow limits. Results from a five-bus power network and the IEEE 24-bus system are presented and discussed

[1]  Mohammad Shahidehpour,et al.  Impact of Security on Power Systems Operation , 2005, Proceedings of the IEEE.

[2]  Felix Wu,et al.  A Game-Theoretic Model for Generation Expansion Planning: Problem Formulation and Numerical Comparisons , 2001, IEEE Power Engineering Review.

[3]  H. Rudnick,et al.  Congestion management and transmission rights in centralized electric markets , 2004, IEEE Transactions on Power Systems.

[4]  J. Contreras,et al.  Finding multiperiod Nash equilibria in pool-based electricity markets , 2004, IEEE Transactions on Power Systems.

[5]  I. Wangensteen,et al.  Stochastic generation expansion planning by means of stochastic dynamic programming , 1991 .

[6]  B. Hobbs,et al.  Linear Complementarity Models of Nash-Cournot Competition in Bilateral and POOLCO Power Markets , 2001, IEEE Power Engineering Review.

[7]  Benjamin F. Hobbs,et al.  Optimization methods for electric utility resource planning , 1995 .

[8]  S. Stoft Power System Economics: Designing Markets for Electricity , 2002 .

[9]  T. Overbye,et al.  A two-level optimization problem for analysis of market bidding strategies , 1999, 1999 IEEE Power Engineering Society Summer Meeting. Conference Proceedings (Cat. No.99CH36364).

[10]  Roy Billinton,et al.  A minimum cost assessment method for composite generation and transmission system expansion planning , 1993 .

[11]  Yves Smeers,et al.  Forward Markets May Not Decrease Market Power When Capacities are Endogenous , 2005 .

[12]  Andres Ramos,et al.  A Nonlinear Programming Approach to Optimal Static Generation Expansion Planning , 1989, IEEE Power Engineering Review.

[13]  Probability Subcommittee,et al.  IEEE Reliability Test System , 1979, IEEE Transactions on Power Apparatus and Systems.

[14]  Frederic H. Murphy,et al.  Generation Capacity Expansion in Imperfectly Competitive Restructured Electricity Markets , 2005, Oper. Res..

[15]  P. Correia,et al.  Games with incomplete and asymmetric information in poolco markets , 2005, IEEE Transactions on Power Systems.

[16]  B. Hobbs,et al.  Chapter 3 Complementarity-Based Equilibrium Modeling for Electric Power Markets , 2003 .