Factors affecting the accuracy of cost estimate: case of Jordan
暂无分享,去创建一个
Muhammad T. Hatamleh | Mohammed A. Salem Hiyassat | Ghaleb J. Sweis | Rateb J. Sweis | Mohammed Hiyassat | R. Sweis
[1] Ibrahim Saidu,et al. Assessment of the Factors Affecting Accuracy of Pre-tender Cost Estimate in Kaduna State, Nigeria , 2014 .
[2] Muhammad Imran Yousuf,et al. Using Experts` Opinions Through Delphi Technique , 2007 .
[3] Larry R. Dysert. Sharpen your cost estimating skills , 2003 .
[4] Malena Ingemansson,et al. Industrial renewal within the construction network , 2013 .
[5] Albert P.C. Chan,et al. Factors affecting the quality of building projects in Hong Kong , 2000 .
[6] Sherif Ali Mohtady Mohamed,et al. Factors Affecting the Accuracy of Pre-Tender Cost Estimates in the Gaza Strip , 2013 .
[7] Azman Mohd Azrai. The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia / Mohd Azrai Azman , 2012 .
[8] Ali A. Shash,et al. Survey of Procedures Adopted by A/E Firms in Accounting for Design Variables in Early Cost Estimates , 2005 .
[9] Akintola Akintoye,et al. Analysis of factors influencing project cost estimating practice , 2000 .
[10] I. Mahamid. Factors affecting cost estimate accuracy: Evidence from Palestinian construction projects , 2015 .
[11] James E. Bartlett,et al. Organizational research: Determining appropriate sample size in survey research , 2001 .
[12] Ajibade A. Aibinu,et al. Project Factors Influencing the Accuracy of Early Stage Estimates , 2008 .
[13] Li Liu,et al. Improving Cost Estimates of Construction Projects Using Phased Cost Factors , 2007 .
[14] A. H. Boussabaine,et al. Critical determinants of construction tendering costs: Quantity surveyors’ standpoint , 2005 .
[15] Koleola T. Odusami,et al. Factors Affecting the Accuracy of a Pre-Tender Cost Estimate in Nigeria , 2008 .
[16] Andy Neely,et al. The success and failure of performance measurement initiatives: Perceptions of participating managers , 2002 .
[17] Stephen O. Ogunlana,et al. Problems causing delays in major construction projects in Thailand , 2008 .
[18] U. Sekaran,et al. Research Methods for Business : A Skill Building Approach (5th Edition) , 1992 .
[19] Keith R. Molenaar,et al. Construction Project Cost Escalation Factors , 2009 .
[20] Moonseo Park,et al. Project cost estimation using principal component regression , 2005 .
[21] Zulkiflee Abdul-Samad,et al. The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia , 2013 .
[22] Samuel DiGangi,et al. Assessing unidimensionality: A comparison of Rasch modeling, Parallel analysis, and TETRAD , 2007 .
[23] Garold D. Oberlender,et al. Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .
[24] Sai On Cheung,et al. PPMS: a Web-based construction Project Performance Monitoring System , 2004 .
[25] Florence Yean Yng Ling. Key determinants of performance of design-bid-build projects in Singapore , 2004 .
[26] Jacobus J.P. Verster,et al. Problems, preferences and processes related to dispute resolution in construction in South Africa , 2013 .
[27] P. Roberts,et al. Reliability and validity in research. , 2006, Nursing standard (Royal College of Nursing (Great Britain) : 1987).
[29] Garold D. Oberlender,et al. Predicting accuracy of early cost estimates based on estimate quality , 2001 .