Key Performance Indicators of Building Project

Management performance of a construction company can be the sum of management performance of each different project. Therefore, the measurement of management performance following construction projects is essential for securing the competitiveness of a company. However, most research has been related to the performance measurement of the construction industry and companies and little has been conducted on individual project's performance. In particular, building projects have various characteristics depending on construction orderer, type and commissioning entity but no performance indicators have been selected based on this classification. This study aims to select performance indicators for subdivided areas based on project characteristics as well as those which can be commonly used to measure management performance at construction and trial run stages of building projects. In the future, those indicators proposed in this study can be used for developing methodology to evaluate them and later applied to actual building projects to generate quantitative data. In addition, they are expected to be used as reference for selecting indicators to measure management performance of plant and civil engineering projects.

[1]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[2]  Ilhan Yu,et al.  Key Performance Indicators for Developing Construction Performance Index , 2005 .

[3]  Yu Jung-Ho,et al.  Development of Performance Analysis System for Construction Projects Using Data Warehousing Technology , 2005 .

[4]  Zedan Hatush,et al.  Evaluating contractor prequalification data: selection criteria and project success factors , 1997 .

[5]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[6]  Jung-Hoon Lee,et al.  BSC Perspective of an Exploratory study of Developing CSF/KPI Pool in Korean Construction Industry , 2006 .

[7]  Derek H.T. Walker,et al.  An investigation into construction time performance , 1995 .

[8]  A. Neely The performance measurement revolution: why now and what next? , 1999 .

[9]  Hee Sung Cha,et al.  Developing Measurement System for Key Performance Indicators on Building Construction Projects , 2008 .

[10]  C. S Lim,et al.  Criteria of project success: an exploratory re-examination , 1999 .

[11]  William W. Wuellner Project Performance Evaluation Checklist for Consulting Engineers , 1990 .

[12]  Wu Jing,et al.  Key Performance Indicators Supporting Decision-Making Affecting Malaysian Enterprise' Project Performance in China , 2010 .

[13]  S. Ward,et al.  Objectives and performance in construction projects , 1991 .

[14]  John Smullen Balanced scorecards and activity-based management : the practical application , 1997 .

[15]  Luis F. Alarcón,et al.  Project management decision making using cross-impact analysis , 1998 .

[16]  Jae-Jun Kim,et al.  The Deduction of the Success Factor in Construction Projects by Design Build Methods , 2007 .

[17]  R. Ellis Identifying and monitoring key indicators of project success , 1997 .

[18]  Kim Kyung-Rai,et al.  A Framework of the Comparable Performance Measurement in the Construction Industry , 2004 .

[19]  Sangyoon Chin,et al.  A Proposal on the Assessment Criteria and Conceptual Methodology of Performance Measurement based on Efficiency through Construction Project Life Cycle , 2005 .

[20]  Sangyoon Chin,et al.  Analysis of Quantified Characteristics of the Performance Indicators for Construction Companies , 2006 .

[21]  R. Kaplan,et al.  The balanced scorecard--measures that drive performance. , 2015, Harvard business review.

[22]  Luis F. Alarcón,et al.  Modeling project performance for decision making , 1996 .

[23]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .