Lot streaming of a single product in two-machine no-wait flowshops
暂无分享,去创建一个
[1] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[2] Chris N. Potts,et al. Flow shop scheduling with lot streaming , 1989 .
[3] A. Z. Szendrovits. Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model , 1975 .
[4] William G. Truscott,et al. Scheduling production activities in multi-stage batch manufacturing systems , 1985 .
[5] S. Goyal. Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model” , 1976 .
[6] R. Vickson. Optimal lot streaming for multiple products in a two-machine flow shop , 1995 .
[7] C. Sriskandarajah,et al. Two-machine group scheduling problem with blocking and anticipatory setups , 1993 .
[8] G. Steiner,et al. BATCH SCHEDULING TO MINIMIZE CYCLE TIME, FLOW TIME, AND PROCESSING COST , 1993 .
[9] Chris N. Potts,et al. Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity , 1992 .
[10] Hans Röck,et al. The Three-Machine No-Wait Flow Shop is NP-Complete , 1984, JACM.