Simulation optimization approach for hybrid flow shop scheduling problem in semiconductor back-end manufacturing
暂无分享,去创建一个
[1] Felix T. S. Chan,et al. A genetic algorithm-based scheduler for multiproduct parallel machine sheet metal job shop , 2011, Expert Syst. Appl..
[2] W.L. Pearn,et al. Scheduling Integrated Circuit Assembly Operations on Die Bonder , 2007, IEEE Transactions on Electronics Packaging Manufacturing.
[3] Qi Li,et al. Hierarchical Capacity Planning With Reconfigurable Kits in Global Semiconductor Assembly and Test Manufacturing , 2007, IEEE Transactions on Automation Science and Engineering.
[4] Ling-Huey Su,et al. Infinite capacity planning for IC packaging plants , 2010 .
[5] Taho Yang,et al. Heuristic algorithms for a practical-size dynamic parallel-machine scheduling problem: integrated-circuit wire bonding , 2012 .
[6] Chun-Hung Chen,et al. Optimal computing budget allocation for Monte Carlo simulation with application to product design , 2003, Simul. Model. Pract. Theory.
[7] John W. Fowler,et al. Framework for execution level capacity allocation decisions for Assembly - Test facilities using integrated optimization - simulation models , 2008, 2008 Winter Simulation Conference.
[8] Subhash C. Sarin,et al. A review of lot streaming , 2013 .
[9] Li Zheng,et al. Multi-factory capacity planning in semiconductor assembly and test manufacturing with multiple-chip products , 2006, 2006 IEEE International Conference on Automation Science and Engineering.
[10] Jose A. Ventura,et al. A new genetic algorithm for lot-streaming flow shop scheduling with limited capacity buffers , 2013, J. Intell. Manuf..
[11] H. S. Booker,et al. Research Methods for the Behavioral Sciences , 2020 .
[12] Loo Hay Lee,et al. Stochastic Simulation Optimization - An Optimal Computing Budget Allocation , 2010, System Engineering and Operations Research.
[13] David S. Johnson,et al. Computers and Intractability: A Guide to the Theory of NP-Completeness , 1978 .
[14] Bernd Scholz-Reiter,et al. Evolutionary generation of dispatching rule sets for complex dynamic scheduling problems , 2013 .
[15] Jürgen Branke,et al. Integrating Techniques from Statistical Ranking into Evolutionary Algorithms , 2006, EvoWorkshops.
[16] Jürgen Branke,et al. Selecting a Selection Procedure , 2007, Manag. Sci..
[17] Liang Gao,et al. Multi-objective optimization algorithms for flow shop scheduling problem: a review and prospects , 2011 .
[18] Yin Xiao-Feng,et al. A rule-based heuristic finite capacity scheduling system for semiconductor backend assembly , 2004 .
[19] Daniel Quadt,et al. Production planning in semiconductor assembly , 2003 .
[20] Jie Li,et al. Simulation-Based Discrete Optimization of Stochastic Discrete Event Systems Subject to Non Closed-Form Constraints , 2009, IEEE Transactions on Automatic Control.
[21] MengChu Zhou,et al. Virtual production lines design for back-end semiconductor manufacturing systems , 2003 .
[22] Paul R. Drake,et al. Minimizing total tardiness for the machine scheduling and worker assignment problems in identical parallel machines using genetic algorithms , 2009 .
[23] Lionel Amodeo,et al. A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times , 2006 .
[24] Jürgen Branke,et al. Evolutionary search for difficult problem instances to support the design of job shop dispatching rules , 2011, Eur. J. Oper. Res..
[25] Frank Werner,et al. A heuristic algorithm for minimizing mean flow time with unit setups , 2001, Inf. Process. Lett..
[26] Michael Pinedo,et al. Scheduling: Theory, Algorithms, and Systems , 1994 .
[27] John W. Fowler,et al. A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations , 2011, J. Sched..
[28] Andreas Klemmt,et al. An optimization approach for parallel machine problems with dedication constraints: Combining simulation and capacity planning , 2011, Proceedings of the 2011 Winter Simulation Conference (WSC).
[29] Andreas Klemmt,et al. Design and validation of heuristic algorithms for simulation-based scheduling of a semiconductor Backend facility , 2009 .
[30] Jose M. Framiñan,et al. Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective , 2010, Comput. Oper. Res..
[31] T. X. Cai,et al. An intelligent multi-constraint finite capacity-based lot release system for semiconductor backend assembly environment , 2007 .
[32] Taïcir Loukil,et al. A genetic algorithm for robust hybrid flow shop scheduling , 2011, Int. J. Comput. Integr. Manuf..
[33] Monaldo Mastrolilli,et al. On-line scheduling to minimize max flow time: an optimal preemptive algorithm , 2005, Oper. Res. Lett..
[34] Mustafa Y. Sir,et al. Multi-objective simulation optimization using data envelopment analysis and genetic algorithm: Specific application to determining optimal resource levels in surgical services , 2013 .
[35] A. I. Sivakumar,et al. Multiobjective dynamic scheduling using discrete event simulation , 2001, Int. J. Comput. Integr. Manuf..
[36] Amir Azaron,et al. A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms , 2007, Eur. J. Oper. Res..
[37] A.I. Sivakumar,et al. Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling , 2006, IEEE Transactions on Electronics Packaging Manufacturing.
[38] Loo Hay Lee,et al. Multi-objective simulation-based evolutionary algorithm for an aircraft spare parts allocation problem , 2008, Eur. J. Oper. Res..
[39] Chun-Hung Chen,et al. A Review of Optimal Computing Budget Allocation Algorithms for Simulation Optimization Problem , 2010 .
[40] Rubén Ruiz,et al. Modeling realistic hybrid flexible flowshop scheduling problems , 2008, Comput. Oper. Res..
[41] G. Rand. Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , 1982 .
[42] Danny J. Johnson,et al. A framework for reducing manufacturing throughput time , 2003 .
[43] Ihsan Sabuncuoglu,et al. Simulation optimization: A comprehensive review on theory and applications , 2004 .
[44] Richard F. Hartl,et al. A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer , 2013 .
[45] Rubén Ruiz,et al. The hybrid flow shop scheduling problem , 2010, Eur. J. Oper. Res..
[46] Jürgen Branke *,et al. Anticipation and flexibility in dynamic scheduling , 2005 .
[47] Yolanda Carson,et al. Simulation optimization: methods and applications , 1997, WSC '97.
[48] T. X. Cai,et al. Practical lot release methodology for semiconductor back-end manufacturing , 2005 .
[49] John W. Fowler,et al. Using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility , 2002, Proceedings of the Winter Simulation Conference.
[50] Chun-Hung Chen,et al. Simulation Budget Allocation for Further Enhancing the Efficiency of Ordinal Optimization , 2000, Discret. Event Dyn. Syst..
[51] W. Melville Arnott,et al. Survey of the problem , 1960 .
[52] Loo Hay Lee,et al. Advances in simulation optimization and its applications , 2013 .
[53] Moeed Haghnevis,et al. Batch Production Scheduling for Semiconductor Back-End Operations , 2011, IEEE Transactions on Semiconductor Manufacturing.
[54] Rubén Ruiz,et al. A genetic algorithm for the unrelated parallel machine scheduling problem with sequence dependent setup times , 2011, Eur. J. Oper. Res..
[55] Wenjing Yan,et al. An integrated modeling framework for capacity planning and production scheduling , 2005, 2005 International Conference on Control and Automation.