A computerized risk evaluation model for public-private partnership (PPP) projects and its application
暂无分享,去创建一个
[1] R. Cumming,et al. Fracture risk assessment in frail older people using clinical risk factors. , 2008, Age and ageing.
[2] P. Lam,et al. Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective , 2010 .
[3] Nigel J. Smith,et al. Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .
[4] Albert P.C. Chan,et al. Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach , 2010 .
[5] Witold Pedrycz,et al. Granular Computing - The Emerging Paradigm , 2007 .
[6] Patrick T.I. Lam,et al. Preferred risk allocation in Chinas publicprivate partnership (PPP) projects , 2010 .
[7] K. C. Iyer,et al. Hierarchical Structuring of PPP Risks Using Interpretative Structural Modeling , 2010 .
[8] Stephen O. Ogunlana,et al. Critical COMs of success in large-scale construction projects: Evidence from Thailand construction industry , 2008 .
[9] W. Pedrycz,et al. An introduction to fuzzy sets : analysis and design , 1998 .
[10] Sankaran Mahadevan,et al. Construction Project Risk Assessment Using Existing Database and Project-Specific Information , 2008 .
[11] Dariusz Skorupka,et al. Identification and Initial Risk Assessment of Construction Projects in Poland , 2008 .
[12] Rafael Sacks,et al. PRACTICAL MULTIFACTOR APPROACH TO EVALUATING RISK OF INVESTMENT IN ENGINEERING PROJECTS , 2004 .
[13] Hyun-Ho Choi,et al. A risk assessment methodology for incorporating uncertainties using fuzzy concepts , 2002, Reliab. Eng. Syst. Saf..
[14] John V. Farr,et al. Infrastructure Risk Analysis of Municipal Water Distribution System , 2000 .
[15] Joseph H. M. Tah,et al. A proposal for construction project risk assessment using fuzzy logic , 2000 .
[16] Dan Wang,et al. Modelling risk allocation decision in construction contracts , 2007 .
[17] M. J. Norušis,et al. SPSS for Windows : professional statistics, release 5 , 1992 .
[18] Ayaho Miyamoto,et al. Fuzzy concrete bridge deck condition rating method for practical bridge management system , 2009, Expert Syst. Appl..
[19] Demos C. Angelides,et al. The financial risks in build‐operate‐transfer projects , 2005 .
[20] Siuming Lo,et al. A Fire Safety Assessment System for Existing Buildings , 1999 .
[21] Simon Smith,et al. Tools for selecting appropriate risk management techniques in the built environment , 2008 .
[22] Tarek Zayed,et al. Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .
[23] Farnad Nasirzadeh,et al. Integrating system dynamics and fuzzy logic modelling for construction risk management , 2008 .
[24] Vincent C. Yen,et al. Factor space theory in fuzzy information processing—Composition of states of factors and multifactorial decision making , 2000 .