Development of Hybrid Model for Estimating Construction Waste for Multifamily Residential Buildings Using Artificial Neural Networks and Ant Colony Optimization

Due to the increasing costs of construction waste disposal, an accurate estimation of the amount of construction waste is a key factor in a project’s success. Korea has been burdened by increasing construction waste as a consequence of the growing number of construction projects and a lack of construction waste management (CWM) strategies. One of the problems associated with predicting the amount of waste is that there are no suitable estimation strategies currently available. Therefore, we developed a hybrid estimation model to predict the quantity and cost of waste in the early stage of construction. The proposed approach can be used to address cost overruns and improve CWM in the subsequent stages of construction. The proposed hybrid model uses artificial neural networks (ANNs) and ant colony optimization (ACO). It is expected to provide an accurate waste estimate by applying historical data from multifamily residential buildings.

[1]  Azin Khosravi,et al.  The Iranian Vital Horoscope; Appropriate Tool to Collect Health Statistics in Rural Areas , 2009 .

[2]  Peng Li,et al.  Applying self-adaptive ant colony optimization for construction time-cost optimization , 2009, 2009 International Conference on Management Science and Engineering.

[3]  Lekan Murtala Amusan NEURAL NETWORK-BASED COST PREDICTIVE MODEL FOR BUILDING WORKS , 2011 .

[4]  Jean-Marc Desharnais,et al.  A comparison of software effort estimation techniques: Using function points with neural networks, case-based reasoning and regression models , 1997, J. Syst. Softw..

[5]  Jürgen Bode,et al.  Neural networks for cost estimation: Simulations and pilot application , 2000 .

[6]  Yousong Wang,et al.  Cost Analysis of Construction and Demolition Waste Management : Case Study of the Pearl River Delta of China , 2013 .

[7]  Hjh Jos Brouwers,et al.  Construction Waste: Quantification and Source Evaluation , 1996 .

[8]  武彦 福島 持続可能性(Sustainability)の要件 , 2006 .

[9]  Sreeram Ramakrishnan,et al.  A hybrid approach for feature subset selection using neural networks and ant colony optimization , 2007, Expert Syst. Appl..

[10]  Michael R. Lyu,et al.  A hybrid particle swarm optimization-back-propagation algorithm for feedforward neural network training , 2007, Appl. Math. Comput..

[11]  Yun-Kung Chung,et al.  A Novel Back-propagation Neural Network Training Algorithm Designed by an Ant Colony Optimization , 2005, 2005 IEEE/PES Transmission & Distribution Conference & Exposition: Asia and Pacific.

[12]  Li Wang,et al.  Research on BP Neural Network Optimal Method Based on Improved Ant Colony Algorithm , 2010, 2010 Second International Conference on Computer Engineering and Applications.

[13]  Jaime Solís-Guzmán,et al.  A Spanish model for quantification and management of construction waste. , 2009, Waste management.

[14]  Zsolt János Viharos,et al.  Artificial neural network approach for injection mould cost estimation , 2011 .

[15]  Feng Kong,et al.  Application of RS-SVM in Construction Project Cost Forecasting , 2008, 2008 4th International Conference on Wireless Communications, Networking and Mobile Computing.

[16]  Wenxian Guo,et al.  ACO Optimizing Neural Network for Macroscopic Water Distribution System Modeling , 2010, 2010 International Conference on Intelligent Computing and Cognitive Informatics.

[17]  Tarek Hegazy,et al.  Developing Practical Neural Network Applications Using Back‐Propagation , 1994 .

[18]  Garold D. Oberlender,et al.  Predicting Accuracy of Early Cost Estimates using Factor Analysis and Multivariate Regression , 2003 .

[19]  Hojjat Adeli,et al.  Regularization neural network for construction cost estimation , 1998 .

[20]  Martin Skitmore Construction Prices : the Market Effect , 1987 .

[21]  Konstantinos Moustakas,et al.  Generation and management of construction and demolition waste in Greece—an existing challenge , 2003 .

[22]  Marco Dorigo,et al.  Distributed Optimization by Ant Colonies , 1992 .

[23]  James L. McClelland,et al.  On learning the past-tenses of English verbs: implicit rules or parallel distributed processing , 1986 .

[24]  Maintenance and Limitations Issues of Case-Based Reasoning Technology in a Manufacturing Application , .

[25]  Seongwon Seo,et al.  An Estimation of Construction and Demolition Debris in Seoul, Korea: Waste Amount, Type, and Estimating Model. , 1999, Journal of the Air & Waste Management Association.

[26]  Guiwen Liu,et al.  Forecasting Construction and Demolition Waste Using Gene Expression Programming , 2015, J. Comput. Civ. Eng..

[27]  Nouri Rouh Elah,et al.  PREDICTION OF MUNICIPAL SOLID WASTE GENERATION BY USE OF ARTIFICIAL NEURAL NETWORK: A CASE STUDY OF MASHHAD , 2008 .

[28]  Yusof Mohd Faizul Study on construction & demolition waste management in construction site , 2006 .

[29]  Paulin Coulibaly,et al.  Nonstationary hydrological time series forecasting using nonlinear dynamic methods , 2005 .

[30]  Hun Hee Cho,et al.  Application of support vector machines in assessing conceptual cost estimates , 2007 .

[31]  Rahman Ashena,et al.  Bottom hole pressure estimation using evolved neural networks by real coded ant colony optimization and genetic algorithm , 2011 .

[32]  KimSangyong,et al.  Combining case-based reasoning with genetic algorithm optimization for preliminary cost estimation in construction industry , 2014 .

[33]  Chi Sun Poon,et al.  Reducing building waste at construction sites in Hong Kong , 2004 .

[34]  E. R. Skoyles,et al.  Materials wastage – a misuse of resources , 1976 .

[35]  Amir Hatampour,et al.  Improving performance of a neural network model by artificial ant colony optimization for predicting permeability of petroleum reservoir rocks , 2013 .

[36]  Srinath Perera,et al.  Collaborative case-based estimating and design , 1998 .

[37]  Yue Gao,et al.  The application of ant colony algorithm and artificial neural network in tax assessment , 2010, 2010 International Conference on Audio, Language and Image Processing.

[38]  Theo Haupt,et al.  Variation orders on construction projects: value-adding or waste? , 2009 .

[39]  J. M. Garza,et al.  Neural networks versus parameter-based applications in cost estimating , 1995 .

[40]  Rawshan Ara Begum,et al.  A benefit–cost analysis on the economic feasibility of construction waste minimisation: The case of Malaysia , 2006 .

[41]  Gwang-Hee Kim,et al.  Comparison of School Building Construction Costs Estimation Methods Using Regression Analysis, Neural Network, and Support Vector Machine , 2013 .