A Comparison of PJM's RPM with Alternative Energy and Capacity Market Designs
暂无分享,去创建一个
Kathleen L. Spees | Johannes P. Pfeifenberger | Kathleen Spees | Adam Schumacher | J. Pfeifenberger | Adam Schumacher
[1] Тулупов,et al. CRITERIA , 1973, Wittgenstein: Meaning and Mind.
[2] A. Faruqui,et al. Fostering economic demand response in the Midwest ISO , 2010 .
[3] Australian Energy Regulator,et al. State of the energy market 2009 , 2010 .
[4] Thomas P. Zacharias,et al. 2008 Year in Review , 2009 .
[5] Sunil Tankha. Lost in Translation: Interpreting the Failure of Privatisation in the Brazilian Electric Power Industry * , 2009 .
[6] Peter Cramton. Foreword to Ross Baldick's 'Single Clearing Price in Electricity Markets' , 2009 .
[7] Xavier Vives,et al. Competition and Regulation in the Spanish Gas and Electricity Markets , 2008 .
[8] Fabien A. Roques,et al. Market design for generation adequacy: Healing causes rather than symptoms☆ , 2008 .
[9] Michel Rivier,et al. A New Security of Supply Mechanism for the Iberian Market , 2008 .
[10] Joseph E. Bowring,et al. The Evolution of PJM's Capacity Market , 2008 .
[11] Alan Moran,et al. Resource Adequacy and Efficient Infrastructure Investment , 2008 .
[12] Shmuel S. Oren,et al. Chapter 9 – Resource Adequacy: Alternate Perspectives and Divergent Paths , 2008 .
[13] F. Sioshansi. Competitive electricity markets : design, implementation, performance , 2008 .
[14] Nelson Luis Saldanha da Fonseca. Second quarter 2008 , 2008, IEEE Commun. Surv. Tutorials.
[15] Gerard Doorman,et al. Generation Investment and Capacity Adequacy in Electricity Markets , 2008 .
[16] M. Kintner-Meyer,et al. Loads Providing Ancillary Services: Review of International Experience , 2008 .
[17] Derek W. Bunn,et al. Investment incentives in the Korean electricity market , 2007 .
[18] Ignacio J. Pérez-Arriaga,et al. Enhancing power supply adequacy in Spain: Migrating from capacity payments to reliability options , 2007 .
[19] ALAN MORAN,et al. Chapter 11 Resource Adequacy and Efficient Infrastructure Investment , 2007 .
[20] Takeshi Kashiwagi,et al. Evaluating electricity sector reforms in Argentina: lessons for developing countries? , 2007 .
[21] B. Bezerra,et al. Auctions of contracts and energy call options to ensure supply adequacy in the second stage of the Brazilian power sector reform , 2006, 2006 IEEE Power Engineering Society General Meeting.
[22] Juliana de Moraes Marreco,et al. Natural gas power generation in Brazil: New window of opportunity? , 2006 .
[23] P. Joskow. Competitive Electricity Markets and Investment in New Generating Capacity , 2006 .
[24] Peter Cramton,et al. The Convergence of Market Designs for Adequate Generating Capacity , 2006 .
[25] Ulrik Stridbaek. Lessons from Liberalised Electricity Markets , 2006 .
[26] Shmuel S. Oren,et al. Generation Adequacy via Call Options Obligations: Safe Passage to the Promised Land , 2005 .
[27] P. Joskow. Markets for Power in the United States: An Interim Assessment , 2005 .
[28] James Bushnell. Electricity Resource Adequacy: Matching Policies and Goals , 2005 .
[29] H. Rudnick,et al. South American reform lessons - twenty years of restructuring and reform in Argentina, Brazil, and Chile , 2005, IEEE Power and Energy Magazine.
[30] William J. Nuttall,et al. Investment Incentives and Electricity Market Design: the British Experience , 2005 .
[31] Miles Bidwell,et al. Reliability Options: A Market-Oriented Approach to Long-Term Adequacy , 2005 .
[32] William W. Hogan,et al. ON AN "ENERGY ONLY" ELECTRICITY MARKET DESIGN FOR RESOURCE ADEQUACY , 2005 .
[33] Erik R. Larsen,et al. Lessons from deregulation in Colombia: successes, failures and the way ahead , 2004 .
[34] M. Pollitt. Electricity Reform in Chile. Lessons for Developing Countries , 2004 .
[35] Jean Tirole,et al. Reliability and Competitive Electricity Markets , 2004 .
[36] N. Rose,et al. Center for the Study of Energy Markets , 2004 .
[37] S. Hesmondhalgh,et al. Is NETA the blueprint for wholesale electricity trading arrangements of the future , 2003 .
[38] Richard D. Tabors,et al. Ex ante and ex post designs for electric market mitigation: past and present experience and lessons from California , 2003, 36th Annual Hawaii International Conference on System Sciences, 2003. Proceedings of the.
[39] J. Blatchford. California Independent System Operator , 2003 .
[40] Natalia Fabra,et al. Designing Electricity Auctions , 2004 .
[41] Hugh Rudnick,et al. Second Generation Electricity Reforms in Latin America and the California Paradigm , 2002 .
[42] R. O. Hinkel. Market based generation adequacy: how do we achieve it? an independent system operator's perspective , 2001, 2001 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.01CH37194).
[43] Richard D. Tabors,et al. Pricing in the California Power Exchange Electricity Market: Should California Switch from Uniform Pricing to Pay-as-Bid Pricing? , 2001 .
[44] S. Mitchell,et al. Comments Welcome , 1999 .
[45] Felix F. Wu,et al. Capacity payments and the pricing of reliability in competitive generation markets , 2000, Proceedings of the 33rd Annual Hawaii International Conference on System Sciences.
[46] Shmuel S. Oren,et al. Capacity Payments and Supply Adequacy in Competitive Electricity Markets , 2000 .
[47] R. Righter. Power Loss: The Origins of Deregulation and Restructuring in the American Electric Utility System , 1999 .
[48] Eric Hirst,et al. Generation Adequacy: Who Decides? , 1999 .
[49] J. Nunamaker. Proceedings of the 53rd Hawaii International Conference on System Sciences , 1999 .
[50] Bernadette A. Minton,et al. The Impact of Cash Flow Volatility on Discretionary Investment and the Costs of Debt and Equity Financing , 1999 .
[51] Ricardo J. Caballero,et al. Uncertainty, Investment, and Industry Evolution , 1992 .
[52] M. Ratner. The Year in Review , 1990, Bio/Technology.
[53] K. Birkinshaw. Rough and ready , 1986 .
[54] Joseph P. Tomain. Energy law in a nutshell , 1981 .
[55] W. Nicholson. Microeconomic theory: basic principles and extensions , 1972 .
[56] G. Hardin,et al. The Tragedy of the Commons , 1968, Green Planet Blues.