Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy

This research studies a multi-stage supply chain system that operates under a JIT (just-in-time) delivery policy. Kanbans play an important role in the information and material flows in a supply chain system. Thus, a kanban mechanism is employed to assist in linking different production processes in a supply chain system to implement the scope of JIT philosophy. For a multi-stage supply chain system, a mixed-integer nonlinear programming (MINLP) problem is formulated from the perspective of JIT delivery policy where a kanban may reflect to a transporter such as a truck or a fork-lifter. The number of kanbans, the batch size, the number of batches and the total quantity over one period are determined optimally. It is solved optimally by branch and bound method. A greedy heuristic to avoid the large computational time in branch-and-bound algorithm is developed for solving a large MINLP. Coupled with plant-wide efforts for cost control and management commitment, a logistic system for controlling the production as well as the supply chain is built, which results in minimizing the total cost of the supply chain system. The results show that the improvements in reduction of inventory, wasted labor and customer service in a supply chain are significantly accomplished through the kanban mechanism.

[1]  Amit Garg An application of designing products and processes for supply chain management , 1999 .

[2]  Uday S. Karmarkar,et al.  Batching Policy in Kanban Systems , 1989 .

[3]  Hsu-Pin Wang,et al.  Optimum number of kanbans between two adjacent workstations in a JIT system , 1991 .

[4]  Tayfur Altiok,et al.  Multi-stage, pull-type production/inventory systems , 1995 .

[5]  Moosa Sharafali,et al.  Overplanning Factor in Toyota's Formula for Computing the Number of Kanban , 1997 .

[6]  Ignacio E. Grossmann,et al.  An outer-approximation algorithm for a class of mixed-integer nonlinear programs , 1986, Math. Program..

[7]  Ronald G. Askin,et al.  Determining the number of kanbans in multi-item just-in-time systems , 1993 .

[8]  Bhaba R. Sarker,et al.  Optimum number of Kanbans between two adjacent stations , 1998 .

[9]  Gyana R. Parija,et al.  Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers , 1999 .

[10]  Bhaba R. Sarker,et al.  Operations planning for kanbans between two adjacent workstations , 1996 .

[11]  C. Pegels The Toyota Production System , 1984 .

[12]  Loren Paul Rees,et al.  Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime , 1987 .

[13]  Proceedings of the 19th international conference on Computers and industrial engineering , 1995 .

[14]  B. R. Sarker,et al.  OPERATIONS PLANNING FOR A SINGLE-STAGE KANBAN SYSTEM OPERATING UNDER LINEAR DEMAND , 1998 .

[15]  Domenico Camarda,et al.  Smart Technologies for Environmental Safety and Knowledge Enhancement in Intermodal Transport , 2006 .

[16]  Surendra M. Gupta,et al.  An algorithm to dynamically adjust the number of Kanbans in stochastic processing times and variable demand environment , 1997 .

[17]  Yves Dallery,et al.  An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems , 1996, Oper. Res..

[18]  Roger M. Hill,et al.  The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .

[19]  O. Fujiwara,et al.  Evaluation of performance measures for multi-part, single-product kanban controlled assembly systems with stochastic acquisition and production lead times , 1998 .

[20]  Peter O'Grady,et al.  INTEGRATING KANBAN TYPE PULL SYSTEMS AND MRP TYPE PUSH SYSTEMS: INSIGHTS FROM A MARKOVIAN MODEL , 1992 .

[21]  Bhaba R. Sarker,et al.  Cyclic Scheduling for a Multi-product, Single-facility Production System Operating Under a Just-in-time Delivery Policy , 1996 .

[22]  H Ohta,et al.  The optimal operation planning of Kanban to minimize the total operation cost , 1988 .

[23]  Bhaba R. Sarker,et al.  Operations planning for a multi-stage kanban system , 1999, Eur. J. Oper. Res..