Optimal models for a multi-stage supply chain system controlled by kanban under just-in-time philosophy
暂无分享,去创建一个
[1] Amit Garg. An application of designing products and processes for supply chain management , 1999 .
[2] Uday S. Karmarkar,et al. Batching Policy in Kanban Systems , 1989 .
[3] Hsu-Pin Wang,et al. Optimum number of kanbans between two adjacent workstations in a JIT system , 1991 .
[4] Tayfur Altiok,et al. Multi-stage, pull-type production/inventory systems , 1995 .
[5] Moosa Sharafali,et al. Overplanning Factor in Toyota's Formula for Computing the Number of Kanban , 1997 .
[6] Ignacio E. Grossmann,et al. An outer-approximation algorithm for a class of mixed-integer nonlinear programs , 1986, Math. Program..
[7] Ronald G. Askin,et al. Determining the number of kanbans in multi-item just-in-time systems , 1993 .
[8] Bhaba R. Sarker,et al. Optimum number of Kanbans between two adjacent stations , 1998 .
[9] Gyana R. Parija,et al. Operations planning in a supply chain system with fixed-interval deliveries of finished goods to multiple customers , 1999 .
[10] Bhaba R. Sarker,et al. Operations planning for kanbans between two adjacent workstations , 1996 .
[11] C. Pegels. The Toyota Production System , 1984 .
[12] Loren Paul Rees,et al. Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of Leadtime , 1987 .
[13] Proceedings of the 19th international conference on Computers and industrial engineering , 1995 .
[14] B. R. Sarker,et al. OPERATIONS PLANNING FOR A SINGLE-STAGE KANBAN SYSTEM OPERATING UNDER LINEAR DEMAND , 1998 .
[15] Domenico Camarda,et al. Smart Technologies for Environmental Safety and Knowledge Enhancement in Intermodal Transport , 2006 .
[16] Surendra M. Gupta,et al. An algorithm to dynamically adjust the number of Kanbans in stochastic processing times and variable demand environment , 1997 .
[17] Yves Dallery,et al. An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems , 1996, Oper. Res..
[18] Roger M. Hill,et al. The optimal production and shipment policy for the single-vendor singlebuyer integrated production-inventory problem , 1999 .
[19] O. Fujiwara,et al. Evaluation of performance measures for multi-part, single-product kanban controlled assembly systems with stochastic acquisition and production lead times , 1998 .
[20] Peter O'Grady,et al. INTEGRATING KANBAN TYPE PULL SYSTEMS AND MRP TYPE PUSH SYSTEMS: INSIGHTS FROM A MARKOVIAN MODEL , 1992 .
[21] Bhaba R. Sarker,et al. Cyclic Scheduling for a Multi-product, Single-facility Production System Operating Under a Just-in-time Delivery Policy , 1996 .
[22] H Ohta,et al. The optimal operation planning of Kanban to minimize the total operation cost , 1988 .
[23] Bhaba R. Sarker,et al. Operations planning for a multi-stage kanban system , 1999, Eur. J. Oper. Res..