Lean project planning and control: empirical investigation of ETO projects

The purpose of this paper is to empirically investigate an effective project management practice focusing on planning and control. By doing so, it contributes to the debate on rethinking traditional project management practices and accentuates the need for adjustments based on the project context.,This paper extends the project management theory by proposing a lean project planning (LPP) and control framework, developed and tested in collaboration with ten engineer-to-order (ETO) companies. By following a design science research approach, elements from lean thinking and current project planning and control practices are combined into a maturity model (MM).,ETO project characteristics are identified, and their implications for planning and control are discussed. Nine enablers that transform current project planning and control approaches into a lean approach are defined, allowing the analysis of the underlying complexity of planning and controlling ETO projects and thus facilitating the determination of the actions required to improve project performance.,Once fully embedded in an organization, the presented MM can provide a safe framework for self-criticism and can be used to conduct self-assessments without the need for an external facilitator. Thus, this paper is of particular interest to practicing project managers who aim to implement LPP and control.,To the authors’ best knowledge, this paper is the first to empirically examine the journey toward LPP and control from a MM perspective. This research attempts to describe the enablers of LPP and control.

[1]  Lars-Erik Gadde,et al.  Systematic combining: an abductive approach to case research , 2002 .

[2]  Durward K. Sobek,et al.  The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .

[3]  Jörg Becker,et al.  Developing Maturity Models for IT Management , 2009, Bus. Inf. Syst. Eng..

[4]  Lars-Erik Gadde,et al.  Supply strategy and network effects — purchasing behaviour in the construction industry , 2000 .

[5]  Neil Alderman,et al.  Engineering design and product development and its relationship to manufacturing: A programme of case study research in British companies , 1993 .

[6]  Barbara Hayes-Roth,et al.  A Cognitive Model of Planning , 1979, Cogn. Sci..

[7]  Lauri Koskela,et al.  THE THEORY OF PROJECT MANAGEMENT: EXPLANATION TO NOVEL METHODS , 2002 .

[8]  Richard L. Tucker,et al.  Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .

[9]  Torbjørn H. Netland,et al.  Critical success factors for implementing lean production: the effect of contingencies , 2015 .

[10]  Ibrahim Kocabas,et al.  Project Management Maturity Model (PMMM) in educational organizations , 2010 .

[11]  Jean Hartley,et al.  Case study research , 2004 .

[12]  P. John Clarkson,et al.  Exploration of Correlations between Factors Influencing Communication in Complex Product Development , 2008, Concurr. Eng. Res. Appl..

[13]  Y. Kwak,et al.  Assessing Project Management Maturity , 2000 .

[14]  Christoph H. Loch,et al.  Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..

[15]  Harold Kerzner,et al.  Strategic Planning for Project Management Using a Project Management Maturity Model , 2001 .

[16]  Philip B. Crosby,et al.  Quality Is Free: The Art of Making Quality Certain , 1979 .

[17]  Alain Bernard,et al.  Towards a holistic sustainability index for measuring sustainability of manufacturing companies , 2015 .

[18]  Keith R. Molenaar,et al.  Concurrent Engineering Approach to Reducing Design Delivery Time , 2005 .

[19]  Stanisław Gasik,et al.  A Model of Project Knowledge Management , 2011 .

[20]  Adriel K. S. Sim,et al.  Critical success factors for international development projects in Maldives: Project teams’ perspective , 2016 .

[21]  Samir Chatterjee,et al.  A Design Science Research Methodology for Information Systems Research , 2008 .

[22]  Jan Ola Strandhagen,et al.  Analyzing the factors affecting coordination in engineer-to-order supply chain , 2015 .

[23]  Terry Cooke-Davies,et al.  The “real” success factors on projects , 2002 .

[24]  Bjørn Andersen,et al.  Benchmarking of Project Management Office Establishment: Extracting Best Practices , 2007 .

[25]  John C. Anderson,et al.  Maturity and its impact on new product development project performance , 2001 .

[26]  Jan Ola Strandhagen,et al.  Offshoring Strategies in Norwegian Ship Production , 2018 .

[27]  Carlos Torres Formoso,et al.  A knowledge based framework for planning house building projects , 1991 .

[28]  Marjan Sarshar,et al.  Spice: is a capability maturity model applicable in the construction industry? , 1999 .

[29]  Jan Emblemsvåg Handling Risk and Uncertainty in Project Planning , 2017 .

[30]  Christopher Earl,et al.  A Typology of UK Engineer-to-Order Companies , 2001 .

[31]  P. Garengo,et al.  Managerial processes: business process that sustain performance , 2011 .

[32]  M. Naim,et al.  Engineer-to-order supply chain management: A literature review and research agenda , 2009 .

[33]  Konrad Spang,et al.  Evaluation of project success: a structured literature review , 2017 .

[34]  Bassam A. Hussein Factors influencing project success criteria , 2013, 2013 IEEE 7th International Conference on Intelligent Data Acquisition and Advanced Computing Systems (IDAACS).

[35]  Durward K. Sobek,et al.  Toyota's Principles of Set-Based Concurrent Engineering , 1999 .

[36]  W. Deming Out of the crisis : quality, productivity and competitive position , 1986 .

[37]  James R. Evans An exploratory study of performance measurement systems and relationships with performance results , 2004 .

[38]  B. Kingsman,et al.  Competitive advantage, customisation and a new taxonomy for non make-to-stock companies , 1999 .

[39]  David Little,et al.  Integrated planning and scheduling in the engineer-to-order sector , 2000, Int. J. Comput. Integr. Manuf..

[40]  John M. Usher,et al.  Developing due dates in an engineer-to-order engineering environment , 2014 .

[41]  Erlend Alfnes,et al.  Proposing a quick best practice maturity test for supply chain operations , 2011 .

[42]  Rodney Turner,et al.  Relationships Between Leadership and Success in Different Types of Project Complexities , 2012, IEEE Transactions on Engineering Management.

[43]  Sai S. Nudurupati,et al.  Value of maturity models in performance measurement , 2015 .

[44]  Derek H.T. Walker,et al.  Rethinking project management , 2016 .

[45]  Darren Dalcher,et al.  Rethinking project practice: emerging insights from a series of books for practitioners , 2016 .

[46]  Bohdan W. Oppenheim,et al.  Lean for Systems Engineering with Lean Enablers for Systems Engineering: Oppenheim/Lean Systems , 2011 .

[47]  Young Hoon Kwak,et al.  The Berkeley project management process maturity model: measuring the value of project management , 2000, Proceedings of the 2000 IEEE Engineering Management Society. EMS - 2000 (Cat. No.00CH37139).

[48]  Jeroen P. van den Berg,et al.  Improving operational performance by influencing shopfloor behavior via performance management practices , 2011 .

[49]  Christopher A. Voss,et al.  Case research in operations management , 2002 .

[50]  Joakim Wikner,et al.  Integrating production and engineering perspectives on the customer order decoupling point , 2005 .

[51]  Glenn Ballard,et al.  The Lean Project Delivery System: An Update , 2008 .

[52]  Iris D. Tommelein,et al.  Understanding project success through analysis of project management approach , 2014 .

[53]  Kevin P. Grant,et al.  Project Management Maturity: An Industry Benchmark , 2003 .

[54]  Jacob Nielsen,et al.  Lean Maturity, Lean Sustainability , 2007, APMS.

[55]  Kevin P. Grant,et al.  Project management maturity: an assessment of project management capabilities among and between selected industries , 2006, IEEE Transactions on Engineering Management.

[56]  Jwm Will Bertrand,et al.  Production control in engineer-to-order firms , 1993 .

[57]  David Bryde,et al.  Maturity and Maturity Models in Lean Construction , 2014 .

[58]  K. Eisenhardt Building theories from case study research , 1989, STUDI ORGANIZZATIVI.

[59]  Erling S. Andersen,et al.  Project maturity in organisations , 2003 .

[60]  Roy Wendler,et al.  The maturity of maturity model research: A systematic mapping study , 2012, Inf. Softw. Technol..

[61]  Andy Neely,et al.  Performance measurement system design , 1995 .

[62]  Daryl Powell,et al.  Exploring the archetypes of engineer-to-order: an empirical analysis , 2016 .

[63]  Paul S. Adler,et al.  Interdepartmental Interdependence and Coordination: The Case of the Design/Manufacturing Interface , 1995 .

[64]  Abd. Rahman Abdul Rahim,et al.  The need for a new product development framework for engineer‐to‐order products , 2003 .

[65]  Harvey Maylor,et al.  “It worked for manufacturing…!”: Operations strategy in project-based operations , 2015 .

[66]  Young B. Moon,et al.  System dynamics modeling of engineering change management in a collaborative environment , 2011 .

[67]  Christian Hicks,et al.  Supply chain management: A strategic issue in engineer to order manufacturing , 2000 .

[68]  Gary Klein,et al.  An exploration of the relationship between software development process maturity and project performance , 2004, Inf. Manag..

[69]  Jeffrey K. Liker,et al.  Lean Product Development as a System: A Case Study of Body and Stamping Development at Ford , 2011 .

[70]  Adrialdo Azanha,et al.  Agile project management with Scrum , 2017 .

[71]  Jan Ola Strandhagen,et al.  Supply chain management in the shipbuilding industry: challenges and perspectives , 2011 .

[72]  Herman Glenn Ballard,et al.  THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .

[73]  Kudret Demirli,et al.  Development of a lean maturity model for operational level planning , 2016 .

[74]  Jonathan Gosling,et al.  Establishing a maturity model for design automation in sales-delivery processes of ETO products , 2016, Comput. Ind..

[75]  Walter Brenner,et al.  Developing a maturity model for service systems in heavy equipment manufacturing enterprises , 2014, Inf. Manag..

[76]  Josef Oehmen,et al.  CRITERIA FOR EVALUATING THE SUCCESS OF LARGE-SCALE ENGINEERING PROGRAMS , 2012 .

[77]  Andrew J. Sense,et al.  Learning Generators: Project Teams Re-Conceptualized , 2003 .

[78]  Ben Light,et al.  A stage maturity model for enterprise resource planning systems use , 2001, DATB.

[79]  Terence J. Cooke-Davies,et al.  The maturity of project management in different industries: An investigation into variations between project management models , 2003 .

[80]  J. Liker The Toyota Way , 2003 .

[81]  Jeffrey S. Russell,et al.  What successful project managers do , 2015, IEEE Engineering Management Review.

[82]  Carlos Torres Formoso,et al.  Understanding the theory behind the Last Planner System using the Language-Action Perspective: two case studies , 2017 .

[83]  Pär Åhlström,et al.  The difficult path to lean product development , 1996 .

[84]  H.-P. Wiendahl,et al.  Stumbling blocks of PPC: Towards the holistic configuration of PPC systems , 2005 .

[85]  Federico Adrodegari,et al.  Engineer-to-order (ETO) production planning and control: an empirical framework for machinery-building companies , 2015 .

[86]  Jan Emblemsvåg,et al.  Lean Project Planning in Shipbuilding , 2014 .