Lean project planning and control: empirical investigation of ETO projects
暂无分享,去创建一个
Kristina Kjersem | Gabriele Hofinger Jünge | Erlend Alfnes | Bjørn Andersen | B. Andersen | Kristina Kjersem | Erlend Alfnes
[1] Lars-Erik Gadde,et al. Systematic combining: an abductive approach to case research , 2002 .
[2] Durward K. Sobek,et al. The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster , 1995 .
[3] Jörg Becker,et al. Developing Maturity Models for IT Management , 2009, Bus. Inf. Syst. Eng..
[4] Lars-Erik Gadde,et al. Supply strategy and network effects — purchasing behaviour in the construction industry , 2000 .
[5] Neil Alderman,et al. Engineering design and product development and its relationship to manufacturing: A programme of case study research in British companies , 1993 .
[6] Barbara Hayes-Roth,et al. A Cognitive Model of Planning , 1979, Cogn. Sci..
[7] Lauri Koskela,et al. THE THEORY OF PROJECT MANAGEMENT: EXPLANATION TO NOVEL METHODS , 2002 .
[8] Richard L. Tucker,et al. Is construction project planning really doing its job? A critical examination of focus, role and process , 1987 .
[9] Torbjørn H. Netland,et al. Critical success factors for implementing lean production: the effect of contingencies , 2015 .
[10] Ibrahim Kocabas,et al. Project Management Maturity Model (PMMM) in educational organizations , 2010 .
[11] Jean Hartley,et al. Case study research , 2004 .
[12] P. John Clarkson,et al. Exploration of Correlations between Factors Influencing Communication in Complex Product Development , 2008, Concurr. Eng. Res. Appl..
[13] Y. Kwak,et al. Assessing Project Management Maturity , 2000 .
[14] Christoph H. Loch,et al. Exchanging Preliminary Information in Concurrent Engineering: Alternative Coordination Strategies , 2002, Organ. Sci..
[15] Harold Kerzner,et al. Strategic Planning for Project Management Using a Project Management Maturity Model , 2001 .
[16] Philip B. Crosby,et al. Quality Is Free: The Art of Making Quality Certain , 1979 .
[17] Alain Bernard,et al. Towards a holistic sustainability index for measuring sustainability of manufacturing companies , 2015 .
[18] Keith R. Molenaar,et al. Concurrent Engineering Approach to Reducing Design Delivery Time , 2005 .
[19] Stanisław Gasik,et al. A Model of Project Knowledge Management , 2011 .
[20] Adriel K. S. Sim,et al. Critical success factors for international development projects in Maldives: Project teams’ perspective , 2016 .
[21] Samir Chatterjee,et al. A Design Science Research Methodology for Information Systems Research , 2008 .
[22] Jan Ola Strandhagen,et al. Analyzing the factors affecting coordination in engineer-to-order supply chain , 2015 .
[23] Terry Cooke-Davies,et al. The “real” success factors on projects , 2002 .
[24] Bjørn Andersen,et al. Benchmarking of Project Management Office Establishment: Extracting Best Practices , 2007 .
[25] John C. Anderson,et al. Maturity and its impact on new product development project performance , 2001 .
[26] Jan Ola Strandhagen,et al. Offshoring Strategies in Norwegian Ship Production , 2018 .
[27] Carlos Torres Formoso,et al. A knowledge based framework for planning house building projects , 1991 .
[28] Marjan Sarshar,et al. Spice: is a capability maturity model applicable in the construction industry? , 1999 .
[29] Jan Emblemsvåg. Handling Risk and Uncertainty in Project Planning , 2017 .
[30] Christopher Earl,et al. A Typology of UK Engineer-to-Order Companies , 2001 .
[31] P. Garengo,et al. Managerial processes: business process that sustain performance , 2011 .
[32] M. Naim,et al. Engineer-to-order supply chain management: A literature review and research agenda , 2009 .
[33] Konrad Spang,et al. Evaluation of project success: a structured literature review , 2017 .
[34] Bassam A. Hussein. Factors influencing project success criteria , 2013, 2013 IEEE 7th International Conference on Intelligent Data Acquisition and Advanced Computing Systems (IDAACS).
[35] Durward K. Sobek,et al. Toyota's Principles of Set-Based Concurrent Engineering , 1999 .
[36] W. Deming. Out of the crisis : quality, productivity and competitive position , 1986 .
[37] James R. Evans. An exploratory study of performance measurement systems and relationships with performance results , 2004 .
[38] B. Kingsman,et al. Competitive advantage, customisation and a new taxonomy for non make-to-stock companies , 1999 .
[39] David Little,et al. Integrated planning and scheduling in the engineer-to-order sector , 2000, Int. J. Comput. Integr. Manuf..
[40] John M. Usher,et al. Developing due dates in an engineer-to-order engineering environment , 2014 .
[41] Erlend Alfnes,et al. Proposing a quick best practice maturity test for supply chain operations , 2011 .
[42] Rodney Turner,et al. Relationships Between Leadership and Success in Different Types of Project Complexities , 2012, IEEE Transactions on Engineering Management.
[43] Sai S. Nudurupati,et al. Value of maturity models in performance measurement , 2015 .
[44] Derek H.T. Walker,et al. Rethinking project management , 2016 .
[45] Darren Dalcher,et al. Rethinking project practice: emerging insights from a series of books for practitioners , 2016 .
[46] Bohdan W. Oppenheim,et al. Lean for Systems Engineering with Lean Enablers for Systems Engineering: Oppenheim/Lean Systems , 2011 .
[47] Young Hoon Kwak,et al. The Berkeley project management process maturity model: measuring the value of project management , 2000, Proceedings of the 2000 IEEE Engineering Management Society. EMS - 2000 (Cat. No.00CH37139).
[48] Jeroen P. van den Berg,et al. Improving operational performance by influencing shopfloor behavior via performance management practices , 2011 .
[49] Christopher A. Voss,et al. Case research in operations management , 2002 .
[50] Joakim Wikner,et al. Integrating production and engineering perspectives on the customer order decoupling point , 2005 .
[51] Glenn Ballard,et al. The Lean Project Delivery System: An Update , 2008 .
[52] Iris D. Tommelein,et al. Understanding project success through analysis of project management approach , 2014 .
[53] Kevin P. Grant,et al. Project Management Maturity: An Industry Benchmark , 2003 .
[54] Jacob Nielsen,et al. Lean Maturity, Lean Sustainability , 2007, APMS.
[55] Kevin P. Grant,et al. Project management maturity: an assessment of project management capabilities among and between selected industries , 2006, IEEE Transactions on Engineering Management.
[56] Jwm Will Bertrand,et al. Production control in engineer-to-order firms , 1993 .
[57] David Bryde,et al. Maturity and Maturity Models in Lean Construction , 2014 .
[58] K. Eisenhardt. Building theories from case study research , 1989, STUDI ORGANIZZATIVI.
[59] Erling S. Andersen,et al. Project maturity in organisations , 2003 .
[60] Roy Wendler,et al. The maturity of maturity model research: A systematic mapping study , 2012, Inf. Softw. Technol..
[61] Andy Neely,et al. Performance measurement system design , 1995 .
[62] Daryl Powell,et al. Exploring the archetypes of engineer-to-order: an empirical analysis , 2016 .
[63] Paul S. Adler,et al. Interdepartmental Interdependence and Coordination: The Case of the Design/Manufacturing Interface , 1995 .
[64] Abd. Rahman Abdul Rahim,et al. The need for a new product development framework for engineer‐to‐order products , 2003 .
[65] Harvey Maylor,et al. “It worked for manufacturing…!”: Operations strategy in project-based operations , 2015 .
[66] Young B. Moon,et al. System dynamics modeling of engineering change management in a collaborative environment , 2011 .
[67] Christian Hicks,et al. Supply chain management: A strategic issue in engineer to order manufacturing , 2000 .
[68] Gary Klein,et al. An exploration of the relationship between software development process maturity and project performance , 2004, Inf. Manag..
[69] Jeffrey K. Liker,et al. Lean Product Development as a System: A Case Study of Body and Stamping Development at Ford , 2011 .
[70] Adrialdo Azanha,et al. Agile project management with Scrum , 2017 .
[71] Jan Ola Strandhagen,et al. Supply chain management in the shipbuilding industry: challenges and perspectives , 2011 .
[72] Herman Glenn Ballard,et al. THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL , 2000 .
[73] Kudret Demirli,et al. Development of a lean maturity model for operational level planning , 2016 .
[74] Jonathan Gosling,et al. Establishing a maturity model for design automation in sales-delivery processes of ETO products , 2016, Comput. Ind..
[75] Walter Brenner,et al. Developing a maturity model for service systems in heavy equipment manufacturing enterprises , 2014, Inf. Manag..
[76] Josef Oehmen,et al. CRITERIA FOR EVALUATING THE SUCCESS OF LARGE-SCALE ENGINEERING PROGRAMS , 2012 .
[77] Andrew J. Sense,et al. Learning Generators: Project Teams Re-Conceptualized , 2003 .
[78] Ben Light,et al. A stage maturity model for enterprise resource planning systems use , 2001, DATB.
[79] Terence J. Cooke-Davies,et al. The maturity of project management in different industries: An investigation into variations between project management models , 2003 .
[80] J. Liker. The Toyota Way , 2003 .
[81] Jeffrey S. Russell,et al. What successful project managers do , 2015, IEEE Engineering Management Review.
[82] Carlos Torres Formoso,et al. Understanding the theory behind the Last Planner System using the Language-Action Perspective: two case studies , 2017 .
[83] Pär Åhlström,et al. The difficult path to lean product development , 1996 .
[84] H.-P. Wiendahl,et al. Stumbling blocks of PPC: Towards the holistic configuration of PPC systems , 2005 .
[85] Federico Adrodegari,et al. Engineer-to-order (ETO) production planning and control: an empirical framework for machinery-building companies , 2015 .
[86] Jan Emblemsvåg,et al. Lean Project Planning in Shipbuilding , 2014 .