[1] George Norman,et al. The role of logistics in the materials flow control process , 1998 .
[2] Vaibhav Gupta,et al. Application of value stream mapping for lean operations and cycle time reduction: an Indian case study , 2005 .
[3] Andrew J. Crowley. Construction as a manufacturing process: Lessons from the automotive industry , 1998 .
[4] Ash Genaidy,et al. Moving from lean manufacturing to lean construction: Toward a common sociotechnological framework , 2005 .
[5] Luis Felipe Romero Dessens,et al. Use of Value Mapping Tools for Manufacturing Systems Redesign , 2012 .
[6] Per Erik Eriksson,et al. Improving construction supply chain collaboration and performance: a lean construction pilot project , 2010 .
[7] H. Papoutsakis. Sharing Scientific and Social Knowledge in a Performance Oriented Industry: An Evaluation Model , 2011 .
[8] Li-Ren Yang. Key practices, manufacturing capability and attainment of manufacturing goals: The perspective of project/engineer-to-order manufacturing , 2013 .
[9] Bimal Nepal,et al. Improving manufacturing process for biomedical products: a case study , 2011 .
[10] Marco Tantardini,et al. A lean-based ORR system for non-repetitive manufacturing , 2012 .
[11] L. Koskela. Is structural change the primary solution to the problems of construction? , 2003 .
[12] A. Andijani. Trade‐off between maximizing throughput rate and minimizing system time in kanban systems , 1997 .
[13] Gulshan Chauhan,et al. Measuring parameters of lean manufacturing realization , 2012 .
[14] Omar I. Alhawari. Operator Assignment Decisions in a Highly Dynamic Cellular Environment , 2008 .
[15] Dominik T. Matt,et al. Template based production system design , 2008 .
[16] Damian George,et al. Improvement of manufacturing operations at a pharmaceutical company , 2011 .
[17] Richard Lee Storch,et al. A non-sequential just-in-time simulation model , 1996 .
[18] Prashanth B. Nagendra,et al. MRP/sfx: A kanban-oriented shop floor extension to MRP , 1999 .
[19] Nitin Seth,et al. Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context , 2008 .
[20] Alok K. Verma,et al. An Integrated Lean Implementation Model for Fleet Repair and Maintenance , 2004 .
[21] Ye Li,et al. From value stream mapping toward a lean/sigma continuous improvement process: an industrial case study , 2010 .
[22] Mustafa Özbayrak,et al. Leanness: experiences from the journey to date , 2005 .
[23] Andrea Chiarini,et al. Lean production: mistakes and limitations of accounting systems inside the SME sector , 2012 .
[24] Stuart D. Green,et al. Lean construction: arenas of enactment, models of diffusion and the meaning of ‘leanness’ , 2005 .
[25] William E. Youngdahl,et al. “Lean” service: in defense of a production‐line approach , 1998 .
[26] Yuehwern Yih,et al. Generic kanban systems for dynamic environments , 1994 .
[27] Robert Kagan,et al. Implementing Lean Manufacturing in High-mix Production Environment , 2006, APMS.
[28] Anders Bystedt,et al. Interaction in the construction process—System effects for a joinery-products supplier , 2011 .
[29] M. Naim,et al. An innovative supply chain strategy for customized housing , 2003 .
[30] Thomas Neitzert,et al. Value Stream Mapping (VSM) in a manufacture-to-order small and medium enterprise , 2008 .
[31] N. Singh,et al. Modelling and Analysis of Just‐in‐Time Manufacturing Systems: A Review , 1992 .
[32] Jack R. Meredith,et al. Characterizing and structuring a new make-to-forecast production strategy , 2007 .
[33] Stephen Emmitt,et al. Lost in transition: the transfer of lean manufacturing to construction , 2008 .
[34] D. T. Matt,et al. Adaptation of the value stream optimization approach to collaborative company networks in the construction industry , 2013 .
[35] Gerhard Girmscheid. Industrialization in building construction , 2005 .
[36] Christian Hicks,et al. Planning Complex Engineer-To-Order Products , 2003 .
[37] Gregory A. Howell,et al. Lean project management , 2003 .
[38] Marcello Braglia,et al. A new value stream mapping approach for complex production systems , 2006 .
[39] David Gann,et al. Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan , 1996 .
[40] Cathal Heavey,et al. A review and comparison of hybrid and pull-type production control strategies , 2005 .
[41] K. I. Gidado,et al. Project complexity: The focal point of construction production planning , 1996 .
[42] Jwm Will Bertrand,et al. Production control in engineer-to-order firms , 1993 .
[43] Marco Tantardini,et al. Lean Production implementation: a comparison between repetitive and non repetitive companies. , 2008 .
[44] Wallace J. Hopp,et al. To Pull or Not to Pull: What Is the Question? , 2004, Manuf. Serv. Oper. Manag..
[45] Peter T. Ward,et al. Fit, Flexibility and Performance in Manufacturing: Coping with Dynamic Environments , 2004 .
[46] Peter T. Ward,et al. Lean manufacturing: context, practice bundles, and performance , 2003 .
[47] Dana L Nelson-Peterson,et al. Creating an Environment for Caring Using Lean Principles of the Virginia Mason Production System , 2007, Journal of Nursing Administration.
[48] Lars Stehn,et al. Lean principles in industrialized housing production: the need for a cultural change , 2008 .
[49] P. Hines,et al. Learning to evolve: A review of contemporary lean thinking , 2004 .