THE PERFORMANCE OF A SIMPLE INCREMENTAL LOT‐SIZING RULE IN A MULTILEVEL INVENTORY ENVIRONMENT

A simple incremental cost approach to lot sizing was tested in a multilevel inventory environment. The incremental approach has not previously been tested in a large-scale study involving multiple product-structure levels. Using the Wagner-Whitin (WW) algorithm as a benchmark, the simple incremental rule (IPPA) was compared to three heuristic procedures (LFL, EOQ, and POQ) frequently used in material requirements planning (MRP) lot-sizing research. The incremental rule consistently generated lower total order/setup and carrying costs than the three heuristics across the 3,200 multilevel test situations examined. In many of the test situations, the incremental rule also outperformed the WW benchmark.

[1]  John J. DeMatteis An Economic Lot-Sizing Technique I: The Part-Period Algorithm , 1968, IBM Syst. J..

[2]  Joseph R. Biggs HEURISTIC LOT-SIZING AND SEQUENCING RULES IN A MULTISTAGE PRODUCTION-INVENTORY SYSTEM , 1979 .

[3]  R. C. Carlson,et al.  Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .

[4]  Louis E. Yelle Materials requirements lot sizing: a multi-level approach , 1979 .

[5]  H. Albert Napier,et al.  Optimal Multi-Level Lot Sizing for Requirements Planning Systems , 1980 .

[6]  D. Collier A comparison of MRP lot sizing methods considering capacity change costs , 1980 .

[7]  David A. Collier,et al.  Research issues for multi-level lot sizing in MRP systems , 1982 .

[8]  R. Lawrence LaForge MRP and the Part‐Period Algorithm , 1982 .

[9]  Joseph D. Blackburn,et al.  Improved heuristics for multistage requirements planning systems , 1982 .

[10]  Basheer M. Khumawala,et al.  Multi-level lot sizing in material requirements planning: an empirical investigation , 1982, Comput. Oper. Res..

[11]  Joseph D. Blackburn,et al.  The impact of a rolling schedule in a multi-level MRP system , 1982 .

[12]  Dean H. Kropp,et al.  HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS , 1983 .

[13]  Ronald G. Askin,et al.  The effect of lot-sizing on workload variability , 1983 .

[14]  Urban Wemmerlöv,et al.  The part-period balancing algorithm and its look ahead-look back feature: A theoretical and experimental analysis of a single stage lot-sizing procedure , 1983 .

[15]  David P. Kopcso,et al.  Learning curves and lot sizing for independent and dependent demand , 1983 .