Simulation modeling techniques for underground infrastructure construction processes

Simulation is an efficient and cost-effective tool for decision-making and analyzing real-world systems and repetitive construction processes. Tunneling and trenchless construction processes are excellent candidates for the utilization of computer simulation due to their repetitive nature. This paper presents six simulation tools that have been developed over the last five years and implemented to plan and manage a range of several applications in underground infrastructure construction. The purpose of the tools, modeling framework, modeling logic, inputs, and outputs for tunneling, soil type prediction, sewer condition forecasting, pipeline routing, horizontal directional drilling, and trenchless pipe replacement are presented. The successful development and implementation of the tools presented in this paper further illustrate the usefulness of employing simulation for pre-planning and decision-making to reduce uncertainty inherent in construction projects involving underground infrastructure systems.

[1]  A. Alan B. Pritsker,et al.  Simulation with Visual SLAM and AweSim , 1997 .

[2]  Simaan M. AbouRizk,et al.  Analytical methods to reduce uncertainty in tunnel construction projects , 2004 .

[3]  Samuel T. Ariaratnam,et al.  Financial Outlay Modeling for a Local Sewer Rehabilitation Strategy , 2002 .

[4]  Simaan M. AbouRizk,et al.  Design, development and application of soil transition algorithms for tunneling using special purpose simulation , 2001, Proceeding of the 2001 Winter Simulation Conference (Cat. No.01CH37304).

[5]  Dale Dean Meredith Design and Planning of Engineering Systems , 1985 .

[6]  Janaka Y. Ruwanpura,et al.  Simulation Tool to Select the Most Optimum Route for Pipeline Projects , 2004 .

[7]  James J. Solberg,et al.  Operations Research: Principles and Practice. , 1977 .

[8]  Simaan M. AbouRizk,et al.  Special purpose simulation templates for tunnel construction operations , 2001 .

[9]  G. Arthur Mihram,et al.  HUMAN KNOWLEDGE The Role of Models, Metaphors, and Analogy , 1974 .

[10]  Simaan M. AbouRizk,et al.  A framework for applying simulation in construction , 1998 .

[11]  Samuel T. Ariaratnam,et al.  Prediction models for sewer infrastructure utilizing rule-based simulation , 2004 .

[12]  Michael Q. Anderson Quantitative management decision making, with models and applications , 1982 .

[13]  G. Powers,et al.  Simulation based project selection decision analysis tool , 2002, Proceedings of the Winter Simulation Conference.

[14]  M A Rahgozar,et al.  Accounting for overstrength in seismic design of steel structures , 1998 .

[15]  Yasser Abdel-Rady I. Mohamed,et al.  A Review of Simulation Applications for Varying Demands in Tunneling , 2003 .

[16]  Simaan M. AbouRizk,et al.  Application Framework for Development of Simulation Tools , 2000 .