3D finite difference model for simulation of double shield TBM tunneling in squeezing grounds

Abstract One of the main concerns in using a shielded machine in deep rock tunnels is the possibility of the shield seizure in squeezing ground. To realistically evaluate the possibility of machine seizure in such grounds, the interaction between the rock mass and shield, lining and backfilling need to be understood. This paper will explain the background theories and the application of numerical analysis for 3D modeling of mechanized tunneling by using a double shield TBM in squeezing ground. The discussions will include the effects of advance rate during excavation cycle of a shielded TBM to observe the impact of tunneling rate on the possibility of machine jamming in the squeezing grounds. Simulation results at five reference points on the tunnel circumference along the tunnel or longitudinal displacement profile (LDP) as well as longitudinal contact force profiles (LFP) on both front and rear shields have been examined. Also, maximum thrust force required to overcome friction and drive TBM forward is calculated. This exercise allows for evaluation of the effects of various parameters on convergence and contact forces between the rock and shield, which in turn determines the required propel forces and can define the possibility of machine entrapment.

[1]  Bhawani Singh,et al.  Correlation between observed support pressure and rock mass quality , 1992 .

[2]  Georgios Anagnostou,et al.  The Effect of the Stress Path on Squeezing Behavior in Tunneling , 2009 .

[3]  Georg Anagnostou,et al.  Tunnel boring machines under squeezing conditions , 2010 .

[4]  Giovanni Battista Barla,et al.  A Completely 3D Model for the Simulation of Mechanized Tunnel Excavation , 2012, Rock Mechanics and Rock Engineering.

[5]  N. Vlachopoulos,et al.  Improved Longitudinal Displacement Profiles for Convergence Confinement Analysis of Deep Tunnels , 2009 .

[6]  Ebrahim Farrokh,et al.  Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project , 2009 .

[7]  Ö. Aydan,et al.  The squeezing potential of rocks around tunnels; Theory and prediction , 1993 .

[8]  R. Ribacchi,et al.  3D-Modelling of TBM excavation in squeezing rock masses , 2007 .

[9]  Georg Anagnostou,et al.  On the feasibility of TBM drives in squeezing ground , 2006 .

[10]  R. Goel,et al.  Tunnelling through the young Himalayas — A case history of the Maneri-Uttarkashi power tunnel , 1995 .

[11]  Georg Anagnostou,et al.  The Interaction Between Shield, Ground and Tunnel Support in TBM Tunnelling Through Squeezing Ground , 2011 .

[12]  G. Barla Tunnelling under squeezing rock conditions , 2002 .

[13]  J. Schmitt,et al.  Spannungsverformungsverhalten des Gebirges beim Vortrieb mit Tunnelbohrmaschinen mit Schild , 2009 .

[14]  José A. Cobreros,et al.  Tunnels de Guadarrama : Problèmes géotechniques rencontrés dans un double tunnel de 27 km : Espagne , 2005 .

[15]  Erik Eberhardt,et al.  Numerical modelling of three-dimension stress rotation ahead of an advancing tunnel face , 2001 .