Part selection policy for a flexible manufacturing cell feeding several production lines

Abstract Analysis of the part selection policy in the case of a flexible manufacturing cell producing different parts for several emanating lines is presented. The discrete response control problem is formulated as an undiscounted semi-Markovian decision problem whose decision epochs occur when the cell completes a part and must decide what type of part to fabricate next. Design objective is to minimize the expected shortage penalty per unit time incurred by the production lines when they run out of inputs. Optimal production policies are characterized, and a discussion of related industrial implementation issues is given.

[1]  William S. Jewell,et al.  Markov-Renewal Programming. I: Formulation, Finite Return Models , 1963 .

[2]  P. Schweitzer Iterative solution of the functional equations of undiscounted Markov renewal programming , 1971 .

[3]  K. Mani Chandy,et al.  Open, Closed, and Mixed Networks of Queues with Different Classes of Customers , 1975, JACM.

[4]  Paul J. Schweitzer,et al.  Maximum Throughput in Finite-Capacity Open Queueing Networks with Product-Form Solutions , 1977 .

[5]  K. L. Hitz Scheduling of flexible flowshops , 1979 .

[6]  Moshe M. Barash,et al.  Operational control of item flow in versatile manufacturing systems , 1979 .

[7]  Kathryn E. Stecke,et al.  The optimal planning of computerized manufacturing systems , 1980 .

[8]  J. Buzacott "Optimal" operating rules for automated manufacturing systems , 1980 .

[9]  J. A. Buzacott,et al.  Models for Understanding Flexible Manufacturing Systems , 1980 .

[10]  Jr. Mikell P. Groover Automation, production systems, and computer-aided manufacturing , 1980 .

[11]  James J. Solberg,et al.  Capacity Planning with a Stochastic Workflow Model , 1981 .

[12]  Ellen Louise Hahne Dynamic routing in an unreliable manufacturing network with limited storage , 1981 .

[13]  R. Suri New Techniques for Modelling and Control of Flexible Automated Manufacturing Systems , 1981 .

[14]  Stanley Gershwin,et al.  An algorithm for the computer control of production in a flexible manufacturing system , 1981, 1981 20th IEEE Conference on Decision and Control including the Symposium on Adaptive Processes.

[15]  Kathryn E. Stecke,et al.  Loading and control policies for a flexible manufacturing system , 1981 .

[16]  H. J. Warnecke,et al.  Industrial Robots: Application Experience , 1982 .

[17]  Stanley B. Gershwin,et al.  An algorithm for the computer control of a flexible manufacturing system , 1983 .

[18]  Kathryn E. Stecke,et al.  Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .

[19]  Abraham Seidmann,et al.  Performance evaluation of flexible manufacturing systems , 1984, IEEE Transactions on Systems, Man, and Cybernetics.