A Scheduling System to Achieve Just-In-Time Production and Minimum Changeover Counts in a Polymerization Plant
暂无分享,去创建一个
[1] Shinji Hasebe,et al. Autonomous decentralized scheduling system for just-in-time production , 2000 .
[2] Nilay Shah,et al. Production planning for the rational use of energy in multiproduct continuous plants , 1993 .
[3] Kazuhiro Takeda,et al. The Hybrid Scheduling System for the Store Block , 2003 .
[4] Elise A. del Rosario,et al. Conveyor scheduling system for a feeds manufacturing plant: a case study , 1991 .
[5] James D. Blocher,et al. A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem , 1996 .
[6] G. Reklaitis,et al. HEURISTIC ALGORITHM FOR SCHEDULING BATCH AND SEMI-CONTINUOUS PLANTS WITH PRODUCTION DEADLINES, INTERMEDIATE STORAGE LIMITATIONS AND EQUIPMENT CHANGEOVER COSTS , 1994 .
[7] Yung Jae Lee,et al. A two-level hierarchical approach for raw material scheduling in steelworks , 1997 .
[8] Andrew N. Hrymak,et al. Nonlinear optimization of a hydrocracker fractionation plant , 1993 .
[9] Jaime Cerdá,et al. An efficient MILP continuous-time formulation for short-term scheduling of multiproduct continuous facilities , 2002 .
[10] Mikhail Y. Kovalyov,et al. Heuristic algorithms for lotsize scheduling with application in the tobacco industry , 2001 .