A fast hybrid tabu search algorithm for the no-wait job shop problem

This paper describes a hybrid tabu search algorithm dedicated to a job shop problem with a no-wait constraint with a makespan criterion. The proposed here algorithm complexity is that the superior algorithm based on the tabu search technique selects parameters controlling the work of a certain constructional algorithm. This approach limits the checked solutions only to a group of solutions being able to be generated by the structural algorithm in question. It bears serious consequences both positive, for example it limits the research scope for a small fraction of relatively extremely well quality of acceptable solutions, and negative that is the lack of possibility of finding the optimal solution. In this paper numerical researches of the proposed algorithm are conducted as well as a comparative analysis with reference to the literature algorithms of the algorithm in question is made.

[1]  Fred W. Glover,et al.  Tabu Search - Part I , 1989, INFORMS J. Comput..

[2]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[3]  J. K. Lenstra,et al.  Computational complexity of discrete optimization problems , 1977 .

[4]  Fred Glover,et al.  Tabu Search - Part II , 1989, INFORMS J. Comput..

[5]  Chelliah Sriskandarajah,et al.  A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..

[6]  Jose M. Framiñan,et al.  An enhanced timetabling procedure for the no-wait job shop problem: a complete local search approach , 2006, Comput. Oper. Res..

[7]  Dario Pacciarelli,et al.  Job-shop scheduling with blocking and no-wait constraints , 2002, Eur. J. Oper. Res..

[8]  Jose M. Framiñan,et al.  Approximative procedures for no-wait job shop scheduling , 2003, Oper. Res. Lett..

[9]  R. Macchiaroli,et al.  Modelling and optimization of industrial manufacturing processes subject to no-wait constraints , 1999 .

[10]  D. A. Wismer,et al.  Solution of the Flowshop-Scheduling Problem with No Intermediate Queues , 1972, Oper. Res..

[11]  Inyong Ham,et al.  A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .

[12]  Christoph J. Schuster No-wait Job Shop Scheduling: Tabu Search and Complexity of Subproblems , 2006, Math. Methods Oper. Res..

[13]  Han Hoogeveen,et al.  Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing , 2000, Eur. J. Oper. Res..