Dispatch strategy to minimise uncertainty in wind power generation in the Australian national electricity market

With increased penetration of wind power, scheduling generators to meet the forecast demand of a power system is becoming an increasingly challenging task for the system operators. Uncertainty associated with the generation expected from wind plants adds to the load demand uncertainty, making it necessary to retain additional reserves to maintain the balance between demand and supply of power. In the Australian national electricity market (NEM), sophisticated wind forecasting techniques are employed to reduce the uncertainty in wind generation. Despite being able to project the contribution of wind power to a reasonable accuracy, wind power plants are currently not considered to be dispatchable resources in the NEM. This paper discusses the possibility of assigning firm generation responsibilities to wind plants, especially in a dynamic electricity markets as the NEM, where the generation scheduling happens between five to ten minutes ahead of actual dispatch.

[1]  Nicholas Jenkins,et al.  Control of DFIG wind turbines , 2003 .

[2]  Tomonobu Senjyu,et al.  Output power leveling of wind turbine Generator for all operating regions by pitch angle control , 2006 .

[3]  T. Thiringer,et al.  Temporary Primary Frequency Control Support by Variable Speed Wind Turbines— Potential and Applications , 2008, IEEE Transactions on Power Systems.

[4]  Zbigniew Lubosny Wind Turbine Operation in Electric Power Systems: Advanced Modeling , 2003 .

[5]  Jon Clare,et al.  Doubly fed induction generator using back-to-back PWM converters and its application to variable-speed wind-energy generation , 1996 .

[6]  O. Wasynczuk,et al.  Dynamic Behavior of a Class of Wind Turbine Generators During Randon Wind Fluctuations , 1981, IEEE Transactions on Power Apparatus and Systems.

[7]  G.A.M. van Kuik,et al.  THE APPLICATION OF SCALING RULES IN UP-SCALING AND MARINISATION OF A WIND TURBINE , 2001 .

[8]  X. Guillaud,et al.  Impact of wind turbine controller strategy on deloaded operation , 2009, 2009 CIGRE/IEEE PES Joint Symposium Integration of Wide-Scale Renewable Resources Into the Power Delivery System.

[9]  Zbigniew Lubosny,et al.  Wind Turbine Operation in Electric Power Systems , 2003 .

[10]  Nicholas Jenkins,et al.  Power system frequency response from fixed speed and doubly fed induction generator-based wind turbines , 2004 .

[11]  J.A.P. Lopes,et al.  Optimum generation control in wind parks when carrying out system operator requests , 2006, IEEE Transactions on Power Systems.

[12]  Nicholas Jenkins,et al.  Frequency support from doubly fed induction generator wind turbines , 2007 .

[13]  Damian Flynn,et al.  Impact on transient and frequency stability for a power system at very high wind penetration , 2010, IEEE PES General Meeting.

[14]  Muammer Ermis,et al.  Double-output induction generator operating at subsynchronous and supersynchronous speeds: steady-state performance optimisation and wind-energy recovery , 1992 .