A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system

This paper presents a mixed-integer linear mathematical programming model for the integrated planning problem of the part quality inspection and preventive maintenance activities in serial multi-stage manufacturing system. The model concurrently determines the right time and place for performing the above-mentioned activities while the production stages are linearly deteriorating. These two decisions are made while the model is to minimize the total cost including the production, maintenance, inspection, scrap, replacement, and the penalty of shipped defective items to customer(s). A numerical example and a real case study are investigated to validate and verify the proposed model. The results show that the determination of inspection locations along a manufacturing line in different periods of time regarding the impact of preventive maintenance activities on defective production probability results in a more efficient manufacturing system.

[1]  K.-H. Cho,et al.  Layer modelling for the inspection allocation problem in re-entrant production systems , 2005 .

[2]  Yau-Ren Shiau Inspection Allocation Planning for a Multiple Quality Characteristic Advanced Manufacturing System , 2003 .

[3]  C. Madu Competing through maintenance strategies , 2000 .

[4]  Reza Tavakkoli-Moghaddam,et al.  Mathematical modelling of a robust inspection process plan: Taguchi and Monte Carlo methods , 2015 .

[5]  Glenn F. Lindsay,et al.  Allocation of Screening Inspection Effort---A Dynamic-Programming Approach , 1964 .

[6]  Bong Jin Yum,et al.  Optimal inspection policies in a serial production system including scrap rework and repair: an MILP approach , 1987 .

[7]  Vahid Sarhangian,et al.  Contribution of simulation to the optimization of inspection plans for multi-stage manufacturing systems , 2009, Comput. Ind. Eng..

[8]  Jianjun Shi,et al.  Quality control and improvement for multistage systems: A survey , 2009 .

[9]  Nukala Viswanadham,et al.  Inspection allocation in manufacturing systems: a genetic algorithm approach , 1994, Proceedings of the 1994 IEEE International Conference on Robotics and Automation.

[10]  Leon S. White Shortest Route Models for the Allocation of Inspection Effort on a Production Line , 2015 .

[11]  Yau-Ren Shiau Quick decision-making support for inspection allocation planning with rapidly changing customer requirements , 2003 .

[12]  J. George Shanthikumar,et al.  Stochastic allocation of inspection capacity to competitive processes , 2002 .

[13]  Hamilton Emmons,et al.  Inspection allocation for multistage deteriorating production systems , 2002 .

[14]  Do Sun Bai,et al.  Optimal allocation of inspection effort in a serial multi-stage production system , 1996 .

[15]  Yarlin Kuo,et al.  Optimal adaptive control policy for joint machine maintenance and product quality control , 2006, Eur. J. Oper. Res..

[16]  Yau-Ren Shiau,et al.  Concurrent process/inspection planning for a customized manufacturing system based on genetic algorithm , 2007 .

[17]  Benny Tjahjono,et al.  Allocation of quality control stations in multistage manufacturing systems , 2011, Comput. Ind. Eng..

[18]  Giri Kumar Tayi,et al.  An integrated production-inventory model with reprocessing and inspection , 1988 .

[19]  Tzvi Raz A Survey of Models for Allocating Inspection Effort in Multistage Production Systems , 1986 .

[20]  Przemyslaw Korytkowski,et al.  A genetic algorithm with tournament selection for optimising inspection allocation in multiproduct multistage production systems , 2011, Int. J. Simul. Process. Model..

[21]  Shaohui Zheng Dynamic quality control in assembly systems , 2000 .

[22]  Tal Raviv,et al.  A polynomial time algorithm for solving a quality control station configuration problem , 2008, Discret. Appl. Math..

[23]  M'Hammed Sahnoun,et al.  Simulation-based optimization of sampling plans to reduce inspections while mastering the risk exposure in semiconductor manufacturing , 2016, J. Intell. Manuf..

[24]  Alessandro Agnetis,et al.  Specialized inspection problems in serial production systems , 1995 .

[25]  James Tannock,et al.  Manufacturing disruption costs due to quality loss , 2007 .

[26]  Stanley B. Gershwin,et al.  Analysis of long flow lines with quality and operational failures , 2008 .

[27]  Ming Dong,et al.  Manufacturing system maintenance based on dynamic programming model with prognostics information , 2019, J. Intell. Manuf..

[28]  Yu Ding,et al.  A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes , 2006 .

[29]  Christian Kirches,et al.  Mixed-integer nonlinear optimization*† , 2013, Acta Numerica.

[30]  H. P. Williams,et al.  Model Building in Mathematical Programming , 1979 .

[31]  Reza Tavakkoli-Moghaddam,et al.  A bi-objective robust inspection planning model in a multi-stage serial production system , 2018, Int. J. Prod. Res..

[32]  Rommert Dekker,et al.  Optimal maintenance of multi-component systems: a review , 2008 .

[33]  Tullio Tolio,et al.  Design and management of manufacturing systems for production quality , 2014 .

[34]  Sedat Sami Ercan,et al.  Cost Minimizing Single Sampling Plans with AIQL and AOQL Constraints , 1974 .

[35]  Reza Tavakkoli-Moghaddam,et al.  A review on optimisation of part quality inspection planning in a multi-stage manufacturing system , 2019, Int. J. Prod. Res..

[36]  Benoît Iung,et al.  Conceptual framework for e-Maintenance: Illustration by e-Maintenance technologies and platforms , 2009, Annu. Rev. Control..

[37]  Peter Kipruto Chemweno,et al.  Modelling maintenance effects on manufacturing equipment performance: results from simulation analysis , 2014 .

[38]  Richard M. Feldman,et al.  Optimization of process improvement and inspection location for serial manufacturing , 1996 .

[39]  Ali Azadeh,et al.  A particle swarm algorithm for optimising inspection policies in serial multistage production processes with uncertain inspection costs , 2015, Int. J. Comput. Integr. Manuf..

[40]  Johannes Freiesleben,et al.  Costs and benefits of inspection systems and optimal inspection allocation for uniform defect propensity , 2006 .