A review of gap-acceptance capacity models
暂无分享,去创建一个
[1] R Akcelik,et al. IMPLEMENTATION OF THE AUSTRALIAN ROUNDABOUT ANALYSIS METHOD IN SIDRA. HIGHWAY CAPACITY AND LEVEL OF SERVICE. PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON HIGHWAY CAPACITY, KARLSRUHE, GERMANY, 24-27 JULY 1991 , 1991 .
[2] Rod Troutbeck. EVALUATING THE PERFORMANCE OF A ROUNDABOUT , 1989 .
[3] R Akcelik. GAP-ACCEPTANCE MODELLING BY TRAFFIC SIGNAL ANALOGY , 1994 .
[4] R. Cowan,et al. An extension of Tanner's results on uncontrolled intersections , 1987, Queueing Syst. Theory Appl..
[5] Rod Troutbeck,et al. REVIEW OF INTERNATIONAL PRACTICES USED TO EVALUATE UNSIGNALIZED INTERSECTIONS , 1997 .
[6] R Akcelik,et al. TRAFFIC SIGNALS: CAPACITY AND TIMING ANALYSIS , 1981 .
[7] Rahmi Akcelik. Speed-Flow and Bunching Models for Uninterrupted Flows , 2006 .
[8] Richard Cowan,et al. Useful headway models , 1975 .
[9] 鹿田 成則,et al. 講座 HIGHWAY CAPACITY MANUAL 2000(3)2車線道路と多車線道路 , 2002 .
[10] R Akcelik,et al. MODELC: A SIMULATION MODEL FOR ROUNDABOUT DESIGN , 1992 .
[11] T Troutbeck,et al. LIMITED PRIORITY MERGE AT UNSIGNALIZED INTERSECTIONS , 1997 .
[12] R Akcelik,et al. Differences between the Austroads roundabout guide and aaSIDRA roundabout analysis methods , 2004 .
[13] Rod Troutbeck. The Performance of Uncontrolled Merges Using a Limited Priority Process , 2002 .
[14] R Troutbeck. ROUNDABOUT CAPACITY AND THE ASSOCIATED DELAY , 1990 .
[15] Edward Chung,et al. CALIBRATION OF THE BUNCHED EXPONENTIAL DISTRIBUTION OF ARRIVAL HEADWAYS. , 1994 .
[16] R Troutbeck,et al. RELATIONSHIP BETWEEN THE PROPORTION OF FREE VEHICLES AND FLOW RATE ON ARTERIAL ROADS , 1993 .
[17] J. Tanner,et al. A theoretical analysis of delays at an uncontrolled intersection , 1962 .
[18] R J Troutbeck. CURRENT AND FUTURE AUSTRALIAN PRACTICES FOR THE DESIGN OF UNSIGNALIZED INTERSECTIONS. INTERSECTIONS WITHOUT TRAFFIC SIGNALS, PROCEEDINGS OF AN INTERNATIONAL WORKSHOP, 16-18 MARCH 1988, BOCHUM, WEST GERMANY , 1988 .
[19] J. Tanner,et al. The capacity of uncontrolled intersection. , 1967, Biometrika.
[20] R Akcelik. ROUNDABOUTS WITH UNBALANCED FLOW PATTERNS , 2004 .
[21] Rod J. Troutbeck. THE CHARACTERISTICS OF THE TIMES DRIVERS ARE STOPPED AT UNSIGNALISED INTERSECTIONS. , 1993 .
[22] Rod Troutbeck,et al. RECENT AUSTRALIAN UNSIGNALISED INTERSECTION RESEARCH AND PRACTICES , 1991 .
[23] Mike McDonald,et al. THE CAPACITY OF ROUNDABOUTS , 1978 .
[24] Edward Chung,et al. TRAFFIC PERFORMANCE MODELS FOR UNSIGNALISED INTERSECTIONS AND FIXED- TIME SIGNALS , 1994 .
[25] Rod Troutbeck. AVERAGE DELAY AT AN UNSIGNALISED INTERSECTION WITH TWO MAJOR STREAMS EACH HAVING A DICHOTOMISED HEADWAY DISTRIBUTION , 1987 .
[26] R T Luttinen. Properties of Cowan’s M3 Headway Distribution , 1999 .
[27] Rod Troutbeck,et al. Capacity of Limited-Priority Merge , 1998 .
[28] Werner Brilon,et al. THE NEW GERMAN GUIDELINE FOR CAPACITY OF UNSIGNALIZED INTERSECTIONS. HIGHWAY CAPACITY AND LEVEL OF SERVICE. PROCEEDINGS OF THE INTERNATIONAL SYMPOSIUM ON HIGHWAY CAPACITY, KARLSRUHE, GERMANY, 24-27 JULY 1991 , 1991 .
[29] Werner Brilon,et al. USEFUL ESTIMATION PROCEDURES FOR CRITIAL GAPS. , 1997 .
[30] W Brilon,et al. Recent developments in calculation methods for unsignalized intersections in west Germany , 1988 .
[31] Edward Chung,et al. COMPARISON OF ROUNDABOUT CAPACITY AND DELAY ESTIMATES FROM ANALYTICAL AND SIMULATION MODELS , 1992 .
[32] R. J. Troutbeck,et al. Average Delay at an Unsignalized Intersection with Two Major Streams Each Having a Dichotomized Headway Distribution , 1986, Transp. Sci..
[33] D P Bowyer,et al. Australian Road Research Board , 1987 .