Application of value stream mapping using simulation to decrease production lead time: a Malaysian manufacturing case

Lean concept has been applied across many companies which offer value and eliminate wastes. Value stream map (VSM) as one of the fundamental tools in lean concept outlines the material and information flows for a product family to reduce wastes at discrete event production routine. In this paper, the improvement of the production lead time using VSM as a technique in a Malaysian supplier, with a job shop production system, is investigated. The main contribution of this paper is reducing production lead time when the Takt Time is much higher than the highest station's cycle time, and reducing unplanned released orders. This paper evaluates the present routing events using current state map and the future state is created answering the eight standard questions. Then, a detailed simulation model was developed to verify the result from future state map and answering the questions that are unable to be addressed by VSM.

[1]  Marcello Braglia,et al.  A new value stream mapping approach for complex production systems , 2006 .

[2]  Andrew Lee‐Mortimer A lean route to manufacturing survival , 2006 .

[3]  William G. Sullivan,et al.  EQUIPMENT REPLACEMENT DECISIONS AND LEAN MANUFACTURING , 2002 .

[4]  Nick Rich,et al.  Creating a lean supplier network: a distribution industry case , 1998 .

[5]  H. Van Landeghem,et al.  Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator , 2007 .

[6]  Deborah Nightingale,et al.  Lean Enterprise Value , 2002 .

[7]  David Brunt,et al.  From Current State to Future State: Mapping the Steel to Component Supply Chain , 2000 .

[8]  Vaibhav Gupta,et al.  Application of value stream mapping for lean operations and cycle time reduction: an Indian case study , 2005 .

[9]  A. F. Rentes,et al.  Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application , 2002 .

[10]  Nitin Seth,et al.  Application of value stream mapping (VSM) for minimization of wastes in the processing side of supply chain of cottonseed oil industry in Indian context , 2008 .

[11]  Kanthi M.N. Muthiah,et al.  A review of literature on manufacturing systems productivity measurement and improvement , 2006 .

[12]  B. K. Ghosh,et al.  Simulation Using Promodel , 2000 .

[13]  Jayant Rajgopal,et al.  Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study , 2007 .

[14]  Ibon Serrano Lasa,et al.  An evaluation of the value stream mapping tool , 2008, Bus. Process. Manag. J..

[15]  James P. Womack,et al.  Lean Thinking: Banish Waste and Create Wealth in Your Corporation , 1996 .

[16]  Marcello Braglia,et al.  Uncertainty in value stream mapping analysis , 2009 .

[17]  R Van Landeghem,et al.  Supply Chain characterisation through Monte Carlo Simulation , 1997 .

[18]  Randall P. Sadowski,et al.  Simulation with Arena , 1998 .

[19]  Alastair Ross,et al.  Lean is not enough , 2003 .

[20]  Kimberlee Snyder,et al.  Improving processes in a small health-care network: A value-mapping case study , 2005, Bus. Process. Manag. J..

[21]  Harri Haapasalo,et al.  Agile manufacturing enablers for Finnish steel products network , 2009 .

[22]  Rodolfo de Castro,et al.  Evaluation of value stream mapping in manufacturing system redesign , 2008 .

[23]  Xueping Li,et al.  Developing a value stream map to evaluate breakdown maintenance operations , 2009 .

[24]  Siamak Alavi The right way [lean manufacturing] , 2003 .

[25]  Bhim Singh,et al.  Value stream mapping as a versatile tool for lean implementation: an Indian case study of a manufacturing firm , 2009 .