A new benchmark dataset for Multi-Skill Resource-Constrained Project Scheduling Problem
暂无分享,去创建一个
Pawel B. Myszkowski | Marek Skowronski | Krzysztof Sikora | Krzysztof Sikora | P. Myszkowski | Marek Skowronski
[1] Francisco Luna,et al. The software project scheduling problem: A scalability analysis of multi-objective metaheuristics , 2014, Appl. Soft Comput..
[2] Ricardo H. C. Takahashi,et al. A modified NSGA-II for the Multiobjective Multi-mode Resource-Constrained Project Scheduling Problem , 2012, 2012 IEEE Congress on Evolutionary Computation.
[3] Tarek Hegazy,et al. ALGORITHM FOR SCHEDULING WITH MULTISKILLED CONSTRAINED RESOURCES , 2000 .
[4] Anabela Pereira Tereso,et al. On the multi-mode, multi-skill resource constrained project scheduling problem : computational results , 2011 .
[5] Jan Karel Lenstra,et al. Scheduling subject to resource constraints: classification and complexity , 1983, Discret. Appl. Math..
[6] Mojahed Jaberi,et al. A Multi-objective Resource-Constrained Project-Scheduling Problem Using Mean Field Annealing Neural Networks , 2014 .
[7] Wang Yifan,et al. An instance generator for project scheduling problems with multi-skilled personnel constraints , 2012, 2012 24th Chinese Control and Decision Conference (CCDC).
[8] Rainer Kolisch,et al. Experimental investigation of heuristics for resource-constrained project scheduling: An update , 2006, Eur. J. Oper. Res..
[9] Y. Kadrou,et al. A new heuristic to solve RCPSP with multiple execution modes and Multi-Skilled Labor , 2006, The Proceedings of the Multiconference on "Computational Engineering in Systems Applications".
[10] M. A. Rahman,et al. PARETO-OPTIMAL SOLUTION OF A SCHEDULING PROBLEM ON A SINGLE MACHINE WITH PERIODIC MAINTENANCE AND NON-PRE-EMPTIVE JOBS , 2022 .
[11] Fawaz S. Al-Anzi,et al. Weighted Multi-Skill Resources Project Scheduling , 2010, J. Softw. Eng. Appl..
[12] Fernando González,et al. Multi-objective Optimization of the Resource Constrained Project Scheduling Problem ( RCPSP ) A heuristic approach based on the mathematical model , .
[13] Antti Latva-Koivisto,et al. Finding a Complexity Measure for Business Process Models , 2001 .
[14] Pawel B. Myszkowski,et al. Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem , 2014, Soft Computing.
[15] Busaba Phruksaphanrat. Multi-Objective Multi-Mode Resource-Constrained Project Scheduling Problem by Preemptive Fuzzy Goal Programming , 2014 .
[16] Rainer Kolisch,et al. Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem , 2000, Eur. J. Oper. Res..
[17] Pawel B. Myszkowski,et al. Novel heuristic solutions for Multi-Skill Resource-Constrained Project Scheduling Problem , 2013, 2013 Federated Conference on Computer Science and Information Systems.
[18] Rainer Kolisch,et al. PSPLIB - a project scheduling problem library , 1996 .
[19] Jean-Charles Billaut,et al. A project scheduling problem with labour constraints and time-dependent activities requirements , 2008 .
[20] Rainer Kolisch,et al. PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .
[21] Analía Amandi,et al. Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem , 2013, Expert Syst. Appl..
[22] Mario Vanhoucke,et al. An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances , 2014, Eur. J. Oper. Res..
[23] Haitao Li,et al. Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm , 2009, J. Sched..
[24] Pawel B. Myszkowski,et al. Tabu search approach for Multi-Skill Resource-Constrained Project Scheduling Problem , 2013, 2013 Federated Conference on Computer Science and Information Systems.