Advance optimized classification and application of surrounding rock based on fuzzy analytic hierarchy process and Tunnel Seismic Prediction
暂无分享,去创建一个
[1] Adnan Aydin,et al. Fuzzy set approaches to classification of rock masses , 2004 .
[2] T. L. Saaty. Exploring the interface between hierarchies, multiple objectives and fuzzy sets , 1978 .
[3] Su Maoxin,et al. PREDICTION OF SURROUNDING ROCK CLASSIFICATION IN ADVANCE BASED ON TSP203 SYSTEM AND GA-SVM , 2010 .
[4] Li Xibing. APPLICATION OF DISTANCE DISCRIMINANT ANALYSIS METHOD TO CLASSIFICATION OF ENGINEERING QUALITY OF ROCK MASSES , 2007 .
[5] Yuan Xiao-shuai,et al. Comprehensive geological prediction and management of underground river in karst areas , 2012 .
[6] F. A. Lootsma,et al. Multicriteria decision analysis with fuzzy pairwise comparisons , 1989 .
[7] Han Xu-li. Rock mass classification method in highway tunnel based on fuzzy analytic hierarchy process , 2008 .
[8] Thomas L. Saaty,et al. Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .
[9] Mohammad Ataei,et al. The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran , 2009, Expert Syst. Appl..
[10] Thomas L. Saaty,et al. On the invalidity of fuzzifying numerical judgments in the Analytic Hierarchy Process , 2007, Math. Comput. Model..
[11] D. Chang. Applications of the extent analysis method on fuzzy AHP , 1996 .
[12] Wei-Chih Wang,et al. Improving AHP for construction with an adaptive AHP approach (A3) , 2008 .
[13] NaghadehiMasoud Zare,et al. The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran , 2009 .
[14] Khaled Nassar,et al. A procedure for multi-criteria selection of building assemblies , 2003 .
[15] Wei-Chih Wang,et al. AHP- and simulation-based budget determination procedure for public building construction projects , 2008 .
[16] Z. T. Bieniawski,et al. Classification of Rock Masses for Engineering: The RMR System and Future Trends , 1993 .
[17] Pei Xiangjun. STUDY OF TIANSHAN SLOPE ROCK MASS RATING(TSMR) SYSTEM , 2010 .
[18] Aviad Shapira,et al. Systematic Evaluation of Construction Equipment Alternatives: Case Study , 2007 .
[19] Nang-Fei Pan,et al. FUZZY AHP APPROACH FOR SELECTING THE SUITABLE BRIDGE CONSTRUCTION METHOD , 2008 .
[20] Shi Shaoshuai,et al. CONSTRUCTION LICENSE MECHANISM AND ITS APPLICATION BASED ON KARST WATER INRUSH RISK EVALUATION , 2011 .
[21] Shucai Li,et al. Risk assessment of water inrush in karst tunnels based on attribute synthetic evaluation system , 2013 .
[22] Sherif Yehia,et al. Hybrid Prequalification-Based, Innovative Contracting Model Using AHP , 2007 .
[23] Lin Yushan,et al. FORECAST OF KARST-FRACTURED GROUNDWATER AND DEFECTIVE GEOLOGICAL CONDITIONS , 2007 .
[24] A. I. Sofianos,et al. Extending the Q system's prediction of support in tunnels employing fuzzy logic and extra parameters , 2006 .
[25] Sung-Lin Hsueh,et al. On-line multi-criterion risk assessment model for construction joint ventures in China , 2007 .
[26] Johnny Wong,et al. Evaluating the system intelligence of the intelligent building systems: Part 2: Construction and validation of analytical models , 2008 .
[27] Tan Xiao-long,et al. Application of extension theory based on entropy weight to rock quality evaluation , 2010 .
[28] Pooyan Asadollahi,et al. Comparison of the evaluated rock mass properties from the TSP system and the RMR classification (Semnan tunnel, Iran) , 2006 .
[29] Chia-Wei Hsu,et al. Risk evaluation of green components to hazardous substance using FMEA and FAHP , 2009, Expert Syst. Appl..
[30] Sławomir Biruk,et al. Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .
[31] Ali Moradzadeh,et al. Prediction of geological hazardous zones in front of a tunnel face using TSP-203 and artificial neural networks , 2008 .