Advance optimized classification and application of surrounding rock based on fuzzy analytic hierarchy process and Tunnel Seismic Prediction

Abstract An advance optimized classification method is proposed to accurate predict the surrounding rock classification based on Fuzzy Analytic Hierarchy Process (FAHP) and Tunnel Seismic Prediction (TSP). Several factors that greatly affect rock mass classification are selected as evaluation indices of FAHP based on analysis of numerous TSP data. Evaluation indices are divided into five grades according to its response characteristics of seismic wave field, and their membership functions are proposed by using frequency statistical method. Comprehensive assigning method is adopted to determine the weights of evaluation indices, and a FAHP model is established for optimized classification of surround rock. Engineering application of Shimenya Tunnel of Yi-Ba Highway is taken as a case study, and proved that the evaluation indices are easy to obtain and the evaluation results are accurate and reliable. The FAHP-TSP method can be further used for other tunnel engineering.

[1]  Adnan Aydin,et al.  Fuzzy set approaches to classification of rock masses , 2004 .

[2]  T. L. Saaty Exploring the interface between hierarchies, multiple objectives and fuzzy sets , 1978 .

[3]  Su Maoxin,et al.  PREDICTION OF SURROUNDING ROCK CLASSIFICATION IN ADVANCE BASED ON TSP203 SYSTEM AND GA-SVM , 2010 .

[4]  Li Xibing APPLICATION OF DISTANCE DISCRIMINANT ANALYSIS METHOD TO CLASSIFICATION OF ENGINEERING QUALITY OF ROCK MASSES , 2007 .

[5]  Yuan Xiao-shuai,et al.  Comprehensive geological prediction and management of underground river in karst areas , 2012 .

[6]  F. A. Lootsma,et al.  Multicriteria decision analysis with fuzzy pairwise comparisons , 1989 .

[7]  Han Xu-li Rock mass classification method in highway tunnel based on fuzzy analytic hierarchy process , 2008 .

[8]  Thomas L. Saaty,et al.  Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation , 1990 .

[9]  Mohammad Ataei,et al.  The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran , 2009, Expert Syst. Appl..

[10]  Thomas L. Saaty,et al.  On the invalidity of fuzzifying numerical judgments in the Analytic Hierarchy Process , 2007, Math. Comput. Model..

[11]  D. Chang Applications of the extent analysis method on fuzzy AHP , 1996 .

[12]  Wei-Chih Wang,et al.  Improving AHP for construction with an adaptive AHP approach (A3) , 2008 .

[13]  NaghadehiMasoud Zare,et al.  The application of fuzzy analytic hierarchy process (FAHP) approach to selection of optimum underground mining method for Jajarm Bauxite Mine, Iran , 2009 .

[14]  Khaled Nassar,et al.  A procedure for multi-criteria selection of building assemblies , 2003 .

[15]  Wei-Chih Wang,et al.  AHP- and simulation-based budget determination procedure for public building construction projects , 2008 .

[16]  Z. T. Bieniawski,et al.  Classification of Rock Masses for Engineering: The RMR System and Future Trends , 1993 .

[17]  Pei Xiangjun STUDY OF TIANSHAN SLOPE ROCK MASS RATING(TSMR) SYSTEM , 2010 .

[18]  Aviad Shapira,et al.  Systematic Evaluation of Construction Equipment Alternatives: Case Study , 2007 .

[19]  Nang-Fei Pan,et al.  FUZZY AHP APPROACH FOR SELECTING THE SUITABLE BRIDGE CONSTRUCTION METHOD , 2008 .

[20]  Shi Shaoshuai,et al.  CONSTRUCTION LICENSE MECHANISM AND ITS APPLICATION BASED ON KARST WATER INRUSH RISK EVALUATION , 2011 .

[21]  Shucai Li,et al.  Risk assessment of water inrush in karst tunnels based on attribute synthetic evaluation system , 2013 .

[22]  Sherif Yehia,et al.  Hybrid Prequalification-Based, Innovative Contracting Model Using AHP , 2007 .

[23]  Lin Yushan,et al.  FORECAST OF KARST-FRACTURED GROUNDWATER AND DEFECTIVE GEOLOGICAL CONDITIONS , 2007 .

[24]  A. I. Sofianos,et al.  Extending the Q system's prediction of support in tunnels employing fuzzy logic and extra parameters , 2006 .

[25]  Sung-Lin Hsueh,et al.  On-line multi-criterion risk assessment model for construction joint ventures in China , 2007 .

[26]  Johnny Wong,et al.  Evaluating the system intelligence of the intelligent building systems: Part 2: Construction and validation of analytical models , 2008 .

[27]  Tan Xiao-long,et al.  Application of extension theory based on entropy weight to rock quality evaluation , 2010 .

[28]  Pooyan Asadollahi,et al.  Comparison of the evaluated rock mass properties from the TSP system and the RMR classification (Semnan tunnel, Iran) , 2006 .

[29]  Chia-Wei Hsu,et al.  Risk evaluation of green components to hazardous substance using FMEA and FAHP , 2009, Expert Syst. Appl..

[30]  Sławomir Biruk,et al.  Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment , 2010 .

[31]  Ali Moradzadeh,et al.  Prediction of geological hazardous zones in front of a tunnel face using TSP-203 and artificial neural networks , 2008 .