Status and recent performance of the accelerators that serve as gold injector for RHIC
暂无分享,去创建一个
T. Roser | L. Ahrens | C. Gardner | D. Steski | N. Tsoupas | K. Zeno | C. Carlson | T. Hayes | M. Blaskiewicz | J. Brennan | K. Brown | J. Glenn | J. Alessi | W. van Asselt | S.Y. Zhang | J. Benjamin | J. Delong | K.S. Smith
[1] S. Tepikian,et al. Commissioning of the Relativistic Heavy Ion Collider , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[2] P. Thieberger,et al. Upgrade and operation of the BNL tandems for RHIC injection , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[3] W. Fischer,et al. Synthesizer controlled beam transfer from the AGS to RHIC , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[4] L. Ahrens,et al. Beam parameters of the AGS synchrotron during fast beam extraction at the location of the AGS kicker , 2001, PACS2001. Proceedings of the 2001 Particle Accelerator Conference (Cat. No.01CH37268).
[5] Y. Iwashita,et al. Magnetic alloy loaded RF cavity for barrier bucket experiment at the AGS , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).
[6] L. Ahrens,et al. Gold beam losses at the AGS Booster injection , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).
[7] T. Roser,et al. Injection of gold ions in the AGS booster with linear coupling , 1999, Proceedings of the 1999 Particle Accelerator Conference (Cat. No.99CH36366).
[8] M Tanaka,et al. FEB/SBE: Commissioning with Au Beam and Run for the FY1996 AtR Transfer Line Commissioning , 1996 .
[9] L. Ahrens,et al. AGS to RHIC transfer line: Design and commissioning , 1996 .
[10] T. Roser,et al. Observation of intensity dependent losses in Au(15+) beams , 1995, Proceedings Particle Accelerator Conference.
[11] T. Roser,et al. Charge exchange studies with Gold ions at the Brookhaven Booster and AGS , 1994 .