Rehabilitation vs Demolition Methodology to Compare the Waste Generated in Alternative Scenarios of Building Elements in BIM During the Design Stage

[1]  Lukumon O. Oyedele,et al.  The application of web of data technologies in building materials information modelling for construction waste analytics , 2017 .

[2]  Frits Tolman,et al.  Modelling multiple views on buildings , 1992 .

[3]  Jack Chin Pang Cheng,et al.  Construction and Demolition Waste Management Using BIM Technology , 2015 .

[4]  Zhili Gao,et al.  Evaluating Sustainability of Architectural Designs Using Building Information Modeling , 2010 .

[5]  Ghang Lee,et al.  Quantification of construction waste prevented by BIM-based design validation: Case studies in South Korea. , 2016, Waste management.

[6]  Antonio Grilo,et al.  Bibliometric analysis and review of Building Information Modelling literature published between 2005 and 2015 , 2017 .

[7]  Jack Chin Pang Cheng,et al.  Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization , 2017 .

[8]  Heng Li,et al.  Impacts of building information modeling (BIM) implementation on design and construction performance: a resource dependence theory perspective , 2017 .

[9]  Lukumon O. Oyedele,et al.  BIM-based deconstruction tool: Towards essential functionalities , 2017 .

[10]  Junaid Qadir,et al.  Analysis of critical features and evaluation of BIM software: Towards a plug-in for construction waste minimization using big data , 2015 .

[11]  Luis F. Alarcón,et al.  Identifying waste in virtual design and construction practice from a Lean Thinking perspective: A meta-analysis of the literature , 2016 .

[12]  C Llatas,et al.  A model for quantifying construction waste in projects according to the European waste list. , 2011, Waste management.

[13]  Andrew N. Baldwin,et al.  A BIM-aided construction waste minimisation framework , 2015 .

[14]  Charles M. Eastman,et al.  BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors , 2008 .

[15]  Xiaoling Zhang,et al.  Computational Building Information Modelling for construction waste management: Moving from rhetoric to reality , 2017 .

[16]  Mohamed Osmani,et al.  Circular economy in construction: current awareness, challenges and enablers , 2017 .

[17]  Mehmet Yalcinkaya,et al.  Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis , 2015 .

[18]  Glenn Ballard,et al.  Explorando la relación entre los métodos de diseño lean y la reducción de residuos de construcción y demolición: tres estudios de caso de proyectos hospitalarios en California , 2016 .

[19]  Lukumon O. Oyedele,et al.  Optimising material procurement for construction waste minimization: An exploration of success factors , 2017 .

[20]  José Manuel Vicente Gómez Soberón,et al.  A Comparative Study of Indoor Pavements Waste Generation During Construction through Simulation Tool , 2016 .

[21]  Christy Pathrose Gomez,et al.  IMPLEMENTING BIM FOR WASTE MINIMISATION IN THE CONSTRUCTION INDUSTRY: A LITERATURE REVIEW , 2012 .

[22]  Jack C. P. Cheng,et al.  A BIM-based system for demolition and renovation waste estimation and planning. , 2013, Waste management.

[23]  Vladimir Bazjanac,et al.  IFC HVAC interface to EnergyPlus - A case of expanded interoperability for energy simulation , 2004 .

[24]  Svetlana Todorova,et al.  The need for better measurement and employee engagement to advance a circular economy: Lessons from Biogen’s “zero waste” journey , 2017 .

[25]  C Llatas,et al.  Development and validation of a building design waste reduction model. , 2016, Waste management.

[26]  O. Oduyemi,et al.  The application and barriers of BIM in sustainable building design , 2017 .

[27]  Kasun Hewage,et al.  Building Information Modeling–Based Analysis to Minimize Waste Rate of Structural Reinforcement , 2012 .