A dream of ideal project delivery system
暂无分享,去创建一个
[1] Ali Touran,et al. Alternative Project Delivery Systems: Applications and Legal Limits in Transportation Projects , 2008 .
[2] A. Dainty,et al. Integrated project teams’ performance in managing unexpected change events , 1999 .
[3] Glenn Ballard,et al. STRUCTURING IDEAL PROJECT DELIVERY SYSTEM , 2010 .
[4] Panagiotis Mitropoulos,et al. Management-Driven Integration , 2000 .
[5] Glenn Ballard,et al. Management Thinking in the Earned Value Method System and the Last Planner System , 2010 .
[6] Michael C. Loulakis,et al. Design-Build Contracting Handbook , 1992 .
[7] Alexander J. S. Colvin,et al. The Problem of Action and Interest Alignment: Beyond Job Requirements and Incentive Compensation , 2007 .
[8] Stefan Olander,et al. Evaluation of stakeholder influence in the implementation of construction projects , 2005 .
[9] Peter E.D. Love,et al. Concurrent engineering : a strategy for procuring construction projects , 1998 .
[10] Will Hughes,et al. ARE RELATIONAL AND FORMAL CONTRACTS IMPLEMENTED AS SUBSTITUTES IN THE UK CONSTRUCTION INDUSTRY , 2007 .
[11] Glenn Ballard,et al. Rethinking Project Definition in Terms of Target Costing , 2006 .
[12] Stuart D. Anderson,et al. Relative Effectiveness of Project Delivery and Contract Strategies , 2006 .
[13] G. Howell,et al. Integrated Project Delivery An Example Of Relational Contracting , 2005 .
[14] Mohan M. Kumaraswamy,et al. Potential for Implementing Relational Contracting and Joint Risk Management , 2004 .
[15] Michael C. Loulakis,et al. Design-Build: Planning Through Development , 2000 .
[16] Andrew D.F. Price,et al. The effect of integration on project delivery team effectiveness , 2011 .
[17] Andrew R.J. Dainty,et al. Intra-team boundaries as inhibitors of performance improvement in UK design and build projects: a call for change , 2001 .