Construction Supply Chain Modeling: Issues and Perspectives

[1]  Jack P. C. Kleijnen,et al.  Supply chain simulation tools and techniques: a survey , 2005, Int. J. Simul. Process. Model..

[2]  M. Naim,et al.  An innovative supply chain strategy for customized housing , 2003 .

[3]  Iris D. Tommelein,et al.  Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain , 2004 .

[4]  M. Naim,et al.  Developing Lean and Agile Supply Chains in the Uk Housebuilding Industry , 1999 .

[5]  Iris D. Tommelein,et al.  Buffering and Batching Practices in the HVAC Industry , 2003 .

[6]  Iris D. Tommelein,et al.  REDUCING LEAD TIME FOR ELECTRICAL SWITCHGEAR , 2002 .

[7]  J. Jayaram,et al.  Supply Chain Management: A Strategic Perspective , 1997 .

[8]  D. Lambert,et al.  Supply Chain Management: Implementation Issues and Research Opportunities , 1998 .

[9]  E. H. Neilsen,et al.  The subordinate's predicaments. , 1979, Harvard business review.

[10]  Iris D. Tommelein,et al.  Application of Lean Supply Chain Concepts to a Vertically-Integrated Company: A Case Study , 2004 .

[11]  Iris D. Tommelein,et al.  Alternative Supply-Chain Configurations for Engineered or Catalogued Made-to-Order Components: Case Study on Pipe Supports Used in Power Plants , 2002 .

[12]  Lauri Koskela,et al.  The four roles of supply chain management in construction , 2000 .

[13]  Martin Fischer,et al.  Importance of Capacity Constraints to Construction Cost and Schedule , 2000 .

[14]  John Tookey,et al.  Conceptual Functions Of A Simulation Model For Construction Logistics , 2006 .

[15]  Kerry London,et al.  Construction supply chain modeling : a research review and interdisciplinary research agenda , 2004 .

[16]  Matt Syal,et al.  Supply Chain Simulation Modeling for the Manufactured Housing Industry , 2006 .

[17]  Iris D. Tommelein,et al.  SIMULATION AS A TOOL FOR PRODUCTION SYSTEM DESIGN IN CONSTRUCTION , 2006 .

[18]  Iris D. Tommelein,et al.  Contributors to lead time in construction supply chains: case of pipe supports used in power plants , 2002, Proceedings of the Winter Simulation Conference.

[19]  Samuel H. Huang,et al.  Designing supply chains: Towards theory development , 2006 .

[20]  Iris D. Tommelein,et al.  Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .

[21]  Iris D. Tommelein,et al.  Process Benefits From Use of Standard Products – Simulation Experiments Using the Pipe Spool Model , 2006 .

[22]  Iris D. Tommelein,et al.  More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .

[23]  K. London,et al.  An industrial organization economic supply chain approach for the construction industry: a review , 2001 .

[24]  Carlos Torres Formoso,et al.  Guidelines for the Improvement of Design, Procurement and Installation of Elevators Using Supply Chain Management Concepts , 2008 .

[25]  Gul Polat,et al.  Construction Supply Chains: Turkish Supply Chain Configurations for Cut and Bent Rebar , 2003 .

[26]  Hokey Min,et al.  Supply chain modeling: past, present and future , 2002 .

[27]  Scott Fernie,et al.  Making sense of supply chain management: a comparative study of aerospace and construction , 2005 .

[28]  William J. O'Brien,et al.  Opportunities for IT to Support the Construction Supply Chain , 2003 .

[29]  David Arditi,et al.  Simulation-Based Decision Support System for Economical Supply Chain Management of Rebar , 2007 .

[30]  Andre Koerckel,et al.  Linking Production-Level Workflow With Materials Supply , 2005 .