Construction Supply Chain Modeling: Issues and Perspectives
暂无分享,去创建一个
Kerry London | Carlos Torres Formoso | William J. O'Brien | William J. O’Brien | K. London | C. Formoso | Vrijhoef Ruben | Vrijhoef Ruben | William J. O'brien
[1] Jack P. C. Kleijnen,et al. Supply chain simulation tools and techniques: a survey , 2005, Int. J. Simul. Process. Model..
[2] M. Naim,et al. An innovative supply chain strategy for customized housing , 2003 .
[3] Iris D. Tommelein,et al. Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain , 2004 .
[4] M. Naim,et al. Developing Lean and Agile Supply Chains in the Uk Housebuilding Industry , 1999 .
[5] Iris D. Tommelein,et al. Buffering and Batching Practices in the HVAC Industry , 2003 .
[6] Iris D. Tommelein,et al. REDUCING LEAD TIME FOR ELECTRICAL SWITCHGEAR , 2002 .
[7] J. Jayaram,et al. Supply Chain Management: A Strategic Perspective , 1997 .
[8] D. Lambert,et al. Supply Chain Management: Implementation Issues and Research Opportunities , 1998 .
[9] E. H. Neilsen,et al. The subordinate's predicaments. , 1979, Harvard business review.
[10] Iris D. Tommelein,et al. Application of Lean Supply Chain Concepts to a Vertically-Integrated Company: A Case Study , 2004 .
[11] Iris D. Tommelein,et al. Alternative Supply-Chain Configurations for Engineered or Catalogued Made-to-Order Components: Case Study on Pipe Supports Used in Power Plants , 2002 .
[12] Lauri Koskela,et al. The four roles of supply chain management in construction , 2000 .
[13] Martin Fischer,et al. Importance of Capacity Constraints to Construction Cost and Schedule , 2000 .
[14] John Tookey,et al. Conceptual Functions Of A Simulation Model For Construction Logistics , 2006 .
[15] Kerry London,et al. Construction supply chain modeling : a research review and interdisciplinary research agenda , 2004 .
[16] Matt Syal,et al. Supply Chain Simulation Modeling for the Manufactured Housing Industry , 2006 .
[17] Iris D. Tommelein,et al. SIMULATION AS A TOOL FOR PRODUCTION SYSTEM DESIGN IN CONSTRUCTION , 2006 .
[18] Iris D. Tommelein,et al. Contributors to lead time in construction supply chains: case of pipe supports used in power plants , 2002, Proceedings of the Winter Simulation Conference.
[19] Samuel H. Huang,et al. Designing supply chains: Towards theory development , 2006 .
[20] Iris D. Tommelein,et al. Just-in-Time Concrete Delivery: Mapping Alternatives for Vertical Supply Chain Integration , 1999 .
[21] Iris D. Tommelein,et al. Process Benefits From Use of Standard Products – Simulation Experiments Using the Pipe Spool Model , 2006 .
[22] Iris D. Tommelein,et al. More Just-in-Time: Location of Buffers in Structural Steel Supply and Construction Processes , 1999 .
[23] K. London,et al. An industrial organization economic supply chain approach for the construction industry: a review , 2001 .
[24] Carlos Torres Formoso,et al. Guidelines for the Improvement of Design, Procurement and Installation of Elevators Using Supply Chain Management Concepts , 2008 .
[25] Gul Polat,et al. Construction Supply Chains: Turkish Supply Chain Configurations for Cut and Bent Rebar , 2003 .
[26] Hokey Min,et al. Supply chain modeling: past, present and future , 2002 .
[27] Scott Fernie,et al. Making sense of supply chain management: a comparative study of aerospace and construction , 2005 .
[28] William J. O'Brien,et al. Opportunities for IT to Support the Construction Supply Chain , 2003 .
[29] David Arditi,et al. Simulation-Based Decision Support System for Economical Supply Chain Management of Rebar , 2007 .
[30] Andre Koerckel,et al. Linking Production-Level Workflow With Materials Supply , 2005 .