Adaptive resource allocation in multimodal activity networks
暂无分享,去创建一个
[1] Erik Demeulemeester,et al. Optimal procedures for the discrete time/cost trade-off problem in project networks , 1996 .
[2] J. D. Wiest,et al. A Heuristic Model for Scheduling Large Projects with Limited Resources , 1967 .
[3] F. Brian Talbot,et al. Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case , 1982 .
[4] Robert C. Leachman. Multiple resource leveling in construction systems through variation of activity intensities , 1983 .
[5] Rainer Kolisch. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation , 1994 .
[6] D. Malcolm,et al. Application of a Technique for Research and Development Program Evaluation , 1959 .
[7] Erik Demeulemeester,et al. New Benchmark Results for the Resource-Constrained Project Scheduling Problem , 1997 .
[8] Edward W. Davis,et al. Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures , 1973 .
[9] Erik Demeulemeester,et al. New computational results on the discrete time/cost trade-off problem in project networks , 1998, J. Oper. Res. Soc..
[10] Bajis M. Dodin,et al. Approximating the Criticality Indices of the Activities in PERT Networks , 1985 .
[11] Robert J Willis. Critical path analysis and resource constrained project scheduling -- Theory and practice , 1985 .
[12] Salah E. Elmaghraby,et al. Basic approximations to an adaptive resource allocation technique to stochastic multimodal projects , 2003 .
[13] Vidyadhar G. Kulkarni,et al. Markov and Markov-Regenerative pert Networks , 1986, Oper. Res..
[14] Rainer Kolisch. Resource Allocation Capabilities of Commercial Project Management Software Packages , 1999, Interfaces.
[15] Shu-Cherng Fang,et al. An Electromagnetism-like Mechanism for Global Optimization , 2003, J. Glob. Optim..
[16] Sooyoung Kim,et al. Resource-Constrained Scheduling of Projects with Variable-Intensity Activities , 1990 .
[17] J. Kamburowski,et al. OPTIMAL REDUCTION OF TWO-TERMINAL DIRECTED ACYCLIC GRAPHS * , 1992 .
[18] Reza H. Ahmadi,et al. Managing Development Risk in Product Design Processes , 1999, Oper. Res..
[19] Edward W. Davis,et al. A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling , 1975 .
[20] James J. Solberg,et al. The use of cutsets in Monte Carlo analysis of stochastic networks , 1979 .
[21] Stein W. Wallace,et al. Improving project cost estimation by taking into account managerial flexibility , 2000, Eur. J. Oper. Res..