Project Management Strategies for Complex Projects
暂无分享,去创建一个
[1] Albert P.C. Chan,et al. Determinants of Successful Design-Build Projects , 2008 .
[2] Jim Sinnette. ACCOUNTING FOR MEGAPROJECT DOLLARS , 2004 .
[3] M. Brunette,et al. Development of Educational and Training Materials on Safety and Health: Targeting Hispanic Workers in the Construction Industry , 2005, Family & community health.
[4] David K. H. Chua,et al. Key determinants for construction schedule performance , 1999 .
[5] Keith R. Molenaar,et al. Procedures Guide for Right-of-Way Cost Estimation and Cost Management , 2009 .
[6] Joe Crossett,et al. Comparing State DOTs' Construction Project Cost and Schedule Performance: 28 Best Practices from Nine States , 2007 .
[7] Carl B Traylor. Project Management: A Systems Approach to Planning, Scheduling, and Controlling , 2014 .
[8] John B. Miller,et al. Achieving Strategic Infrastructure Goals for Quasi-Public Agencies , 2000 .
[9] Erik T. Verhoef,et al. Second-best road pricing through highway franchising☆ , 2007 .
[10] Keith R. Molenaar,et al. Analysis of Owner’s Design and Construction Quality Management Approaches in Design/Build Projects , 2004 .
[11] Keith R. Molenaar,et al. Right of Way Methods and Tools to Control Project Cost Escalation , 2008 .
[12] Michael Chiu,et al. Redevelopment of Canada’s Second Busiest Border Crossing – An Exercise in Consensus Building , 2006 .
[13] Gary Barnes,et al. Understanding and Managing Conflict in Transportation Project Public Involvement , 2004 .
[14] Douglas D. Gransberg,et al. Communicating Design Quality Requirements for Public Sector Design/Build Projects , 2008 .
[15] Richard Laver,et al. Cost Contingencies, Development Basis, and Project Application , 2009 .
[16] Keith R. Molenaar,et al. Stakeholder Input in Design-Build Highway Construction , 2000 .
[17] Rahul Kashyap,et al. An evaluation of the applicability of 4D CAD on construction projects , 2010 .
[18] Erik-Hans Klijn,et al. Facing management choices: an analysis of managerial choices in 18 complex environmental public—private partnership projects , 2008 .
[19] M. F.,et al. Bibliography , 1985, Experimental Gerontology.
[20] Keith R. Molenaar,et al. Does Design-Build Project Delivery Affect the Future of the Public Engineer? , 2008 .
[21] Peter E.D. Love,et al. Establishment of Critical Success Factors for Construction Partnering , 2000 .
[22] Ray Bert. Preparing for Design-Build Projects: A Primer for Owners, Engineers, and Contractors , 2006 .
[23] Jeffrey S. Russell,et al. Alliance team selection for infrastructure projects using monte carlo simulations , 2009 .
[24] Harry W. Lee,et al. Developing and Validating a Tool to Estimate Highway Construction Project Costs , 2004 .
[25] Sang-Hyeok Gang,et al. Report Card for America's Infrastructure , 2012 .
[26] Keith R. Molenaar,et al. Appropriate Risk Allocation in Design-Build RFPs , 2000 .
[27] Søren L. Buhl,et al. What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.
[28] S. Dorman,et al. Development of an Instrument to Assess Student Opinions of the Quality of Distance Education Courses , 2007 .
[29] Ali Touran,et al. RISK ASSESSMENT IN FIXED GUIDEWAY CONSTRUCTION , 1994 .
[30] ROAD PRICING IN AN URBAN CONTEXT , 2009 .
[31] Lucy W. Chege. PRIVATE FINANCING OF CONSTRUCTION PROJECTS AND PROCUREMENT SYSTEMS: AN INTEGRATED APPROACH , 2001 .
[32] John A. Gambatese,et al. Owner Involvement in Construction Site Safety , 2000 .
[33] Muthiah Kasi. Managing Transportation Projects with ASTM International Standards , 2007 .
[34] Douglas D. Gransberg,et al. Performance-Based Construction Contractor Prequalification , 2009 .
[35] San Cristobal,et al. Time, Cost, and Quality in a Road Building Project , 2009 .
[36] D H Pickrell,et al. URBAN RAIL TRANSIT PROJECTS: FORECAST VERSUS ACTUAL RIDERSHIP AND COSTS. FINAL REPORT , 1989 .
[37] Werner Schaad,et al. Risk Management: Illustrated Contribution of Insurers and Reinsurers , 2002 .
[38] Thomas W. Ross,et al. The Economics of Public-Private Partnerships , 2004 .
[39] Ashraf El-Assaly,et al. Sustainable Management for Highway Construction , 2000 .
[40] Robert G. Batson. Project Risk Identification Methods for Construction Planning and Execution , 2009 .
[41] Rogier Jongeling,et al. A method for planning of work-flow by combined use of location-based scheduling and 4D CAD , 2007 .
[42] Suleiman Ashur,et al. Geographic Information Systems as a Support Tool in Construction Cost Estimating in State DOTs , 1997 .
[43] Paul Chinowsky. Integrating Management Breadth in Civil Engineering Education , 2002 .
[44] Ali Touran,et al. Modeling Cost Escalation in Large Infrastructure Projects , 2006 .
[45] Michael C. Loulakis,et al. Design-Build: Planning Through Development , 2000 .
[46] Ashish Kumar,et al. LEADERSHIP AND ORGANIZATIONAL VISION IN MANAGING A MULTIETHNIC AND MULTICULTURAL PROJECT TEAM , 2000 .
[47] A. Warszawski. Parametric analysis of the financing cost in a building project , 2003 .
[48] Kitsana Manivong. Synthesis of a Model for Life-Cycle Project Management , 2000 .
[49] Eric Jessup,et al. Program Scoping / State of Practice For Washington State , 2007 .
[50] Paul Bowen,et al. Identifying and communicating project stakeholder risks , 2009 .
[51] David I. Cleland,et al. Project Management: Strategic Design and Implementation , 1990 .
[52] Mohamed-Asem Abdul-Malak,et al. Evolution of Contractor’s Construction Schedule to Meet Engineer’s Satisfaction , 2002 .
[53] Hayley H. Chouinard,et al. Gasoline Price Differences: Taxes, Pollution Regulations, Mergers, Market Power, and Market Conditions , 2002 .
[54] Ralph J. Trapani,et al. GLENWOOD CANYON I-70: ENVIRONMENTAL CONCERN , 1983 .
[55] Tracy Scriba,et al. Rule on work zone safety and mobility , 2006 .
[56] Michael Coyle,et al. Critical Success Factors for Construction Projects , 1992 .
[57] Harvey Maylor,et al. The Proceedings of 21 st IPMA World Congress on Project Management And then came Complex Project Management , 2022 .
[58] Cesar Quiroga,et al. Development of a Tool for Utility Conflict Data Management in the Project Development Process , 2008 .
[59] Jeffrey S. Russell,et al. Improving Asphalt Paving Productivity , 1997 .
[60] Gary C. Whited,et al. Owner Procured Preliminary Shop Drawings , 2007 .
[61] Clyde B. Tatum,et al. Organizing Large Projects: How Managers Decide , 1984 .
[62] Donath Mrawira,et al. Quality Management System for a Highway Megaproject , 2002 .
[63] R F Kirby. Managing congestion through innovative pricing and financing , 2007 .
[64] Richard G. Little. Expanding the Infrastructure Tent , 2006 .
[65] Keith R. Molenaar,et al. Programmatic Cost Risk Analysis for Highway Megaprojects , 2005 .
[66] Daniel Rubio,et al. Great Expectations , 2015, Logic, Rationality, and Interaction.
[67] Tamar Henkin. Debt Finance Practices for Surface Transportation , 2009 .
[68] Martin Neil,et al. Project Scheduling: Improved Approach to Incorporate Uncertainty Using Bayesian Networks , 2007 .
[69] David N Sillars,et al. Development of Decision Model for Selection of Appropriate Timely Delivery Techniques for Highway Projects , 2009 .
[70] Martin Fischer,et al. Benefits of 4D Models for Facility Owners and AEC Service Providers , 2000 .
[71] Eul-Bum Lee,et al. Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors , 2000 .
[72] James Vercammen,et al. Optimal Two-Part Pricing in a Carbon Offset Market: A Comparison of Organizational Types , 2009 .
[73] Kumares C Sinha,et al. An Evaluation of Innovative Transportation Financing Techniques for Indiana , 2002 .
[74] Willard Price,et al. Innovation in Public Finance , 2002 .
[75] Aidan R. Vining,et al. Public—Private Partnerships , 2008 .
[76] Vivian W. Y Tam,et al. A checklist for assessing sustainability performance of construction projects , 2007 .
[77] Eugene E. Dallaire. How Will the U.S. Finance Its Pressing Transportation Needs , 1977 .
[78] Michael J. Garvin,et al. Public-Private Partnerships for Highway Infrastructure: Capitalizing on International Experience , 2009 .
[79] William L. Richter. The ABC-CLIO Companion to Transportation in America , 1995 .
[80] Corinne S. Bernstein. HIGHWAY PROJECTS - CAN THEY BE DONE IN HALF THE TIME? , 1983 .
[81] Sheryl Staub-French,et al. Visualizing high-rise building construction strategies using linear scheduling and 4D CAD , 2009 .
[82] Sudhir Gupta,et al. Case Studies , 2013, Journal of Clinical Immunology.
[83] Douglas S McLeod. INTEGRATING TRANSPORTATION AND ENVIRONMENTAL PLANNING: EXTENDING APPLICABILITY OF CORRIDOR AND SUBAREA STUDIES AND DECISIONS ON DESIGN CONCEPT AND SCOPE , 1996 .
[84] Mark Vandenbosch,et al. Project Complexity and Efforts to Reduce Product Development Cycle Time , 1999 .
[85] Lisa M Olszak,et al. Do Context-Sensitive Solutions Really Work? , 2008 .
[86] Carlos H. Caldas,et al. Identification of Decision Drivers for the Strategy of Incorporating Utility Relocations into Highway Construction Contracts , 2009 .
[87] Kam Jugdev,et al. A Retrospective look at our Evolving Understanding of Project Success , 2005, IEEE Engineering Management Review.
[88] Lu Zhang,et al. The Value Premium , 2002 .
[89] Mike Heiligenstein. The Devolution of Transportation Funding:How Innovative Financing is Putting Local Communities Back in the Driver's Seat , 2006 .
[90] Kam Judgev. Project management: the managerial process , 2010 .
[91] Renato Lamberti,et al. Value Engineering for Context-Sensitive Solutions , 2009 .
[92] Gregory A. Dolson. Scheduling and Management Improvements Accelerate Roadway Design , 1999 .
[93] John H. Anderson. Transportation Infrastructure: Managing the Costs of Large-Dollar Highway Projects , 1997 .
[94] John S Miller,et al. Challenges and Solutions to Project Scoping: Insights from Virginia Professionals , 2009 .
[95] T J Luglio. PROJECT AND CONSTRUCTION MANAGEMENT GUIDELINES , 1990 .
[96] M. Asem Abdul-Malak,et al. Claim-Avoidance Administrative Procedures for Construction Projects , 2000 .
[97] Adjo Amekudzi,et al. The State of the Practice of Value for Money Analysis in Comparing Public Private Partnerships to Traditional Procurements , 2008 .
[98] Georgios Ellinas,et al. Entropy-based scheduling of resource-constrained construction projects , 2009 .
[99] Glenn Butts,et al. The Joint Confidence Level Paradox: A History of Denial , 2009 .
[100] Harvey Maylor. Special Issue on rethinking project management (EPSRC network 2004–2006) , 2006 .
[101] Christine Nadel,et al. Case Study Research Design And Methods , 2016 .
[102] Carlos H. Caldas,et al. Decision Support System for Combined Transportation and Utility Construction Strategy , 2007 .
[103] Travis McGrath,et al. Innovative Cost and Schedule Risk Assessment for Large Transportation Projects , 2008 .
[104] Douglas D. Gransberg,et al. Comparative Analysis of Owner Goals for Design/Build Projects , 2008 .
[105] Mark Winter,et al. Directions for future research in project management: The main findings of a UK government-funded research network , 2006 .
[106] Douglas D. Gransberg,et al. Relating Cost Growth from the Initial Estimate to Design Fee for Transportation Projects , 2007 .
[107] K. Litkowski,et al. Using structured interviewing techniques , 1985 .
[108] Mark G. Goode. Interrelationship between planning and funding , 1977 .
[109] Keith R. Molenaar,et al. Quality Assurance in Design-Build Projects , 2008 .
[110] Susan Handy,et al. Education of Transportation Planning Professionals , 2002 .
[111] Siegfried P. Gudergan,et al. Governance of public—private partnerships: lessons learnt from an Australian case? , 2007 .
[112] John E. Schaufelberger. Strategies for Successful Partnering Relationships , 2000 .
[113] Yong K. Cho,et al. Advanced Quality Control Methods for Road Paving Construction by Utilizing Sensory Devices , 2009 .
[114] Yoichi Gokan,et al. Alternative government financing and stochastic endogenous growth , 2002 .
[115] Anne Binsted,et al. Environmental Equity and Equality Impact Assessment in the United Kingdom , 2007 .
[116] Douglas D. Gransberg,et al. Quantifying Uncertainty of Construction Material Price Volatility Using Monte Carlo , 2008 .
[117] Edward W. Merrow,et al. Understanding the Outcomes of Mega-Projects: A Quantitative Analysis of Very Large Civilian Projects , 1995 .
[118] W D Pate. Innovative Design and Construction of Chesapeake and Delaware Canal Bridge , 2000 .
[119] Mark Konchar,et al. Comparison of U.S. Project Delivery Systems , 1998 .
[120] Greg Dierkers,et al. How States and Territories Fund Transportation: An Overview of Traditional and Nontraditional Strategies , 2009 .
[121] Eul-Bum Lee,et al. Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors , 2002 .
[122] Roger Atkinson,et al. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .
[123] S Boone,et al. COST AND SCHEDULE ESTIMATES FOR LARGE TRANSPORTATION PROJECTS: A NEW APPROACH TO SOLVING AN OLD PROBLEM , 2003 .
[124] Vinay V. Mudholkar. Six-Sigma: Delivering Quality to Mega Transportation Projects , 2008 .
[125] Barbara Brown,et al. Tennessee Department of Transportation’s Vision 2000: Reengineering the Project-Development Process , 1999 .
[126] Mikkel Godsk,et al. Transforming traditional lectures into problem‐based blended learning: challenges and experiences , 2007 .
[127] Jeffrey S. Bohn,et al. Construction Project Monitoring Using High-Resolution Automated Cameras , 2010 .
[128] Jeffrey N Buxbaum,et al. Protecting the Public Interest in Long-Term Concession Agreements for Transportation Infrastructure , 2008 .
[129] Tom Sorel,et al. THE LIFE CYCLE CONTINUUM , 2004 .
[130] Cynthia Martin,et al. Accelerating Highway Bridge Demolition: An Innovative Approach , 2005 .
[131] J. Capka,et al. MEGAPROJECTS--THEY ARE A DIFFERENT BREED , 2004 .
[132] Harvey Maylor,et al. And then came complex project management (revised) , 2009 .
[133] H. Maylor. Beyond the Gantt chart:: Project management moving on , 2001 .