Project Management Strategies for Complex Projects

Infrastructure needs within the United States have changed from building new facilities to replacing, expanding, or renewing existing facilities. The project management issues involved with infrastructure renewal are different from the issues for new construction. Correspondingly, new project management approaches must be integrated into mainstream practice for all sizes and types of projects to accelerate project delivery, reduce project costs, and minimize project disputes.The difficulties of renewal project complexity have been exacerbated by years of underfunded maintenance and replacement programs. As a result many renewal projects have become even more challenging because of the need to avert major traffic disruptions and in some cases infrastructure failures. Project complexity is introduced by many factors: project types, engineering complexity, size, modality, jurisdictional control, financing approach, contract type, and delivery method. Each project calls for a distinct project management style and approach. This research report documents the research and results performed within the Strategic Highway Research Program 2 (SHRP 2) project R10, Project Management Strategies for Complex Projects. The research scope involved the development of surveys, case study reports, training, technical tools, and a guide to address the current-day challenges of infrastructure project management that are considerably more complex than traditional projects. The R10 project reports facilitate the use of effective strategies in managing complex projects of any size and type. The five-dimensional approach for project management of complex projects is not a new subject. However, it is extensively developed, outlined, and clearly mapped for acceptance and integration within the R10 project. The five dimensions are cost, schedule, technical, context, and finance. Successful use of the approach involves five methods which are unique for each project: define project success factors by each dimension, as required; assemble project team; select project arrangements; prepare early cost model and finance plan; and develop project action plans. Acceptance and use of this guidance should improve the state of the practice by focusing on practical tools and techniques that are designed to be immediately beneficial to transportation professionals.

[1]  Albert P.C. Chan,et al.  Determinants of Successful Design-Build Projects , 2008 .

[2]  Jim Sinnette ACCOUNTING FOR MEGAPROJECT DOLLARS , 2004 .

[3]  M. Brunette,et al.  Development of Educational and Training Materials on Safety and Health: Targeting Hispanic Workers in the Construction Industry , 2005, Family & community health.

[4]  David K. H. Chua,et al.  Key determinants for construction schedule performance , 1999 .

[5]  Keith R. Molenaar,et al.  Procedures Guide for Right-of-Way Cost Estimation and Cost Management , 2009 .

[6]  Joe Crossett,et al.  Comparing State DOTs' Construction Project Cost and Schedule Performance: 28 Best Practices from Nine States , 2007 .

[7]  Carl B Traylor Project Management: A Systems Approach to Planning, Scheduling, and Controlling , 2014 .

[8]  John B. Miller,et al.  Achieving Strategic Infrastructure Goals for Quasi-Public Agencies , 2000 .

[9]  Erik T. Verhoef,et al.  Second-best road pricing through highway franchising☆ , 2007 .

[10]  Keith R. Molenaar,et al.  Analysis of Owner’s Design and Construction Quality Management Approaches in Design/Build Projects , 2004 .

[11]  Keith R. Molenaar,et al.  Right of Way Methods and Tools to Control Project Cost Escalation , 2008 .

[12]  Michael Chiu,et al.  Redevelopment of Canada’s Second Busiest Border Crossing – An Exercise in Consensus Building , 2006 .

[13]  Gary Barnes,et al.  Understanding and Managing Conflict in Transportation Project Public Involvement , 2004 .

[14]  Douglas D. Gransberg,et al.  Communicating Design Quality Requirements for Public Sector Design/Build Projects , 2008 .

[15]  Richard Laver,et al.  Cost Contingencies, Development Basis, and Project Application , 2009 .

[16]  Keith R. Molenaar,et al.  Stakeholder Input in Design-Build Highway Construction , 2000 .

[17]  Rahul Kashyap,et al.  An evaluation of the applicability of 4D CAD on construction projects , 2010 .

[18]  Erik-Hans Klijn,et al.  Facing management choices: an analysis of managerial choices in 18 complex environmental public—private partnership projects , 2008 .

[19]  M. F.,et al.  Bibliography , 1985, Experimental Gerontology.

[20]  Keith R. Molenaar,et al.  Does Design-Build Project Delivery Affect the Future of the Public Engineer? , 2008 .

[21]  Peter E.D. Love,et al.  Establishment of Critical Success Factors for Construction Partnering , 2000 .

[22]  Ray Bert Preparing for Design-Build Projects: A Primer for Owners, Engineers, and Contractors , 2006 .

[23]  Jeffrey S. Russell,et al.  Alliance team selection for infrastructure projects using monte carlo simulations , 2009 .

[24]  Harry W. Lee,et al.  Developing and Validating a Tool to Estimate Highway Construction Project Costs , 2004 .

[25]  Sang-Hyeok Gang,et al.  Report Card for America's Infrastructure , 2012 .

[26]  Keith R. Molenaar,et al.  Appropriate Risk Allocation in Design-Build RFPs , 2000 .

[27]  Søren L. Buhl,et al.  What Causes Cost Overrun in Transport Infrastructure Projects? , 2004, 1304.4476.

[28]  S. Dorman,et al.  Development of an Instrument to Assess Student Opinions of the Quality of Distance Education Courses , 2007 .

[29]  Ali Touran,et al.  RISK ASSESSMENT IN FIXED GUIDEWAY CONSTRUCTION , 1994 .

[30]  ROAD PRICING IN AN URBAN CONTEXT , 2009 .

[31]  Lucy W. Chege PRIVATE FINANCING OF CONSTRUCTION PROJECTS AND PROCUREMENT SYSTEMS: AN INTEGRATED APPROACH , 2001 .

[32]  John A. Gambatese,et al.  Owner Involvement in Construction Site Safety , 2000 .

[33]  Muthiah Kasi Managing Transportation Projects with ASTM International Standards , 2007 .

[34]  Douglas D. Gransberg,et al.  Performance-Based Construction Contractor Prequalification , 2009 .

[35]  San Cristobal,et al.  Time, Cost, and Quality in a Road Building Project , 2009 .

[36]  D H Pickrell,et al.  URBAN RAIL TRANSIT PROJECTS: FORECAST VERSUS ACTUAL RIDERSHIP AND COSTS. FINAL REPORT , 1989 .

[37]  Werner Schaad,et al.  Risk Management: Illustrated Contribution of Insurers and Reinsurers , 2002 .

[38]  Thomas W. Ross,et al.  The Economics of Public-Private Partnerships , 2004 .

[39]  Ashraf El-Assaly,et al.  Sustainable Management for Highway Construction , 2000 .

[40]  Robert G. Batson Project Risk Identification Methods for Construction Planning and Execution , 2009 .

[41]  Rogier Jongeling,et al.  A method for planning of work-flow by combined use of location-based scheduling and 4D CAD , 2007 .

[42]  Suleiman Ashur,et al.  Geographic Information Systems as a Support Tool in Construction Cost Estimating in State DOTs , 1997 .

[43]  Paul Chinowsky Integrating Management Breadth in Civil Engineering Education , 2002 .

[44]  Ali Touran,et al.  Modeling Cost Escalation in Large Infrastructure Projects , 2006 .

[45]  Michael C. Loulakis,et al.  Design-Build: Planning Through Development , 2000 .

[46]  Ashish Kumar,et al.  LEADERSHIP AND ORGANIZATIONAL VISION IN MANAGING A MULTIETHNIC AND MULTICULTURAL PROJECT TEAM , 2000 .

[47]  A. Warszawski Parametric analysis of the financing cost in a building project , 2003 .

[48]  Kitsana Manivong Synthesis of a Model for Life-Cycle Project Management , 2000 .

[49]  Eric Jessup,et al.  Program Scoping / State of Practice For Washington State , 2007 .

[50]  Paul Bowen,et al.  Identifying and communicating project stakeholder risks , 2009 .

[51]  David I. Cleland,et al.  Project Management: Strategic Design and Implementation , 1990 .

[52]  Mohamed-Asem Abdul-Malak,et al.  Evolution of Contractor’s Construction Schedule to Meet Engineer’s Satisfaction , 2002 .

[53]  Hayley H. Chouinard,et al.  Gasoline Price Differences: Taxes, Pollution Regulations, Mergers, Market Power, and Market Conditions , 2002 .

[54]  Ralph J. Trapani,et al.  GLENWOOD CANYON I-70: ENVIRONMENTAL CONCERN , 1983 .

[55]  Tracy Scriba,et al.  Rule on work zone safety and mobility , 2006 .

[56]  Michael Coyle,et al.  Critical Success Factors for Construction Projects , 1992 .

[57]  Harvey Maylor,et al.  The Proceedings of 21 st IPMA World Congress on Project Management And then came Complex Project Management , 2022 .

[58]  Cesar Quiroga,et al.  Development of a Tool for Utility Conflict Data Management in the Project Development Process , 2008 .

[59]  Jeffrey S. Russell,et al.  Improving Asphalt Paving Productivity , 1997 .

[60]  Gary C. Whited,et al.  Owner Procured Preliminary Shop Drawings , 2007 .

[61]  Clyde B. Tatum,et al.  Organizing Large Projects: How Managers Decide , 1984 .

[62]  Donath Mrawira,et al.  Quality Management System for a Highway Megaproject , 2002 .

[63]  R F Kirby Managing congestion through innovative pricing and financing , 2007 .

[64]  Richard G. Little Expanding the Infrastructure Tent , 2006 .

[65]  Keith R. Molenaar,et al.  Programmatic Cost Risk Analysis for Highway Megaprojects , 2005 .

[66]  Daniel Rubio,et al.  Great Expectations , 2015, Logic, Rationality, and Interaction.

[67]  Tamar Henkin Debt Finance Practices for Surface Transportation , 2009 .

[68]  Martin Neil,et al.  Project Scheduling: Improved Approach to Incorporate Uncertainty Using Bayesian Networks , 2007 .

[69]  David N Sillars,et al.  Development of Decision Model for Selection of Appropriate Timely Delivery Techniques for Highway Projects , 2009 .

[70]  Martin Fischer,et al.  Benefits of 4D Models for Facility Owners and AEC Service Providers , 2000 .

[71]  Eul-Bum Lee,et al.  Construction Productivity and Constraints for Concrete Pavement Rehabilitation in Urban Corridors , 2000 .

[72]  James Vercammen,et al.  Optimal Two-Part Pricing in a Carbon Offset Market: A Comparison of Organizational Types , 2009 .

[73]  Kumares C Sinha,et al.  An Evaluation of Innovative Transportation Financing Techniques for Indiana , 2002 .

[74]  Willard Price,et al.  Innovation in Public Finance , 2002 .

[75]  Aidan R. Vining,et al.  Public—Private Partnerships , 2008 .

[76]  Vivian W. Y Tam,et al.  A checklist for assessing sustainability performance of construction projects , 2007 .

[77]  Eugene E. Dallaire How Will the U.S. Finance Its Pressing Transportation Needs , 1977 .

[78]  Michael J. Garvin,et al.  Public-Private Partnerships for Highway Infrastructure: Capitalizing on International Experience , 2009 .

[79]  William L. Richter The ABC-CLIO Companion to Transportation in America , 1995 .

[80]  Corinne S. Bernstein HIGHWAY PROJECTS - CAN THEY BE DONE IN HALF THE TIME? , 1983 .

[81]  Sheryl Staub-French,et al.  Visualizing high-rise building construction strategies using linear scheduling and 4D CAD , 2009 .

[82]  Sudhir Gupta,et al.  Case Studies , 2013, Journal of Clinical Immunology.

[83]  Douglas S McLeod INTEGRATING TRANSPORTATION AND ENVIRONMENTAL PLANNING: EXTENDING APPLICABILITY OF CORRIDOR AND SUBAREA STUDIES AND DECISIONS ON DESIGN CONCEPT AND SCOPE , 1996 .

[84]  Mark Vandenbosch,et al.  Project Complexity and Efforts to Reduce Product Development Cycle Time , 1999 .

[85]  Lisa M Olszak,et al.  Do Context-Sensitive Solutions Really Work? , 2008 .

[86]  Carlos H. Caldas,et al.  Identification of Decision Drivers for the Strategy of Incorporating Utility Relocations into Highway Construction Contracts , 2009 .

[87]  Kam Jugdev,et al.  A Retrospective look at our Evolving Understanding of Project Success , 2005, IEEE Engineering Management Review.

[88]  Lu Zhang,et al.  The Value Premium , 2002 .

[89]  Mike Heiligenstein The Devolution of Transportation Funding:How Innovative Financing is Putting Local Communities Back in the Driver's Seat , 2006 .

[90]  Kam Judgev Project management: the managerial process , 2010 .

[91]  Renato Lamberti,et al.  Value Engineering for Context-Sensitive Solutions , 2009 .

[92]  Gregory A. Dolson Scheduling and Management Improvements Accelerate Roadway Design , 1999 .

[93]  John H. Anderson Transportation Infrastructure: Managing the Costs of Large-Dollar Highway Projects , 1997 .

[94]  John S Miller,et al.  Challenges and Solutions to Project Scoping: Insights from Virginia Professionals , 2009 .

[95]  T J Luglio PROJECT AND CONSTRUCTION MANAGEMENT GUIDELINES , 1990 .

[96]  M. Asem Abdul-Malak,et al.  Claim-Avoidance Administrative Procedures for Construction Projects , 2000 .

[97]  Adjo Amekudzi,et al.  The State of the Practice of Value for Money Analysis in Comparing Public Private Partnerships to Traditional Procurements , 2008 .

[98]  Georgios Ellinas,et al.  Entropy-based scheduling of resource-constrained construction projects , 2009 .

[99]  Glenn Butts,et al.  The Joint Confidence Level Paradox: A History of Denial , 2009 .

[100]  Harvey Maylor Special Issue on rethinking project management (EPSRC network 2004–2006) , 2006 .

[101]  Christine Nadel,et al.  Case Study Research Design And Methods , 2016 .

[102]  Carlos H. Caldas,et al.  Decision Support System for Combined Transportation and Utility Construction Strategy , 2007 .

[103]  Travis McGrath,et al.  Innovative Cost and Schedule Risk Assessment for Large Transportation Projects , 2008 .

[104]  Douglas D. Gransberg,et al.  Comparative Analysis of Owner Goals for Design/Build Projects , 2008 .

[105]  Mark Winter,et al.  Directions for future research in project management: The main findings of a UK government-funded research network , 2006 .

[106]  Douglas D. Gransberg,et al.  Relating Cost Growth from the Initial Estimate to Design Fee for Transportation Projects , 2007 .

[107]  K. Litkowski,et al.  Using structured interviewing techniques , 1985 .

[108]  Mark G. Goode Interrelationship between planning and funding , 1977 .

[109]  Keith R. Molenaar,et al.  Quality Assurance in Design-Build Projects , 2008 .

[110]  Susan Handy,et al.  Education of Transportation Planning Professionals , 2002 .

[111]  Siegfried P. Gudergan,et al.  Governance of public—private partnerships: lessons learnt from an Australian case? , 2007 .

[112]  John E. Schaufelberger Strategies for Successful Partnering Relationships , 2000 .

[113]  Yong K. Cho,et al.  Advanced Quality Control Methods for Road Paving Construction by Utilizing Sensory Devices , 2009 .

[114]  Yoichi Gokan,et al.  Alternative government financing and stochastic endogenous growth , 2002 .

[115]  Anne Binsted,et al.  Environmental Equity and Equality Impact Assessment in the United Kingdom , 2007 .

[116]  Douglas D. Gransberg,et al.  Quantifying Uncertainty of Construction Material Price Volatility Using Monte Carlo , 2008 .

[117]  Edward W. Merrow,et al.  Understanding the Outcomes of Mega-Projects: A Quantitative Analysis of Very Large Civilian Projects , 1995 .

[118]  W D Pate Innovative Design and Construction of Chesapeake and Delaware Canal Bridge , 2000 .

[119]  Mark Konchar,et al.  Comparison of U.S. Project Delivery Systems , 1998 .

[120]  Greg Dierkers,et al.  How States and Territories Fund Transportation: An Overview of Traditional and Nontraditional Strategies , 2009 .

[121]  Eul-Bum Lee,et al.  Construction Productivity Analysis for Asphalt Concrete Pavement Rehabilitation in Urban Corridors , 2002 .

[122]  Roger Atkinson,et al.  Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria , 1999 .

[123]  S Boone,et al.  COST AND SCHEDULE ESTIMATES FOR LARGE TRANSPORTATION PROJECTS: A NEW APPROACH TO SOLVING AN OLD PROBLEM , 2003 .

[124]  Vinay V. Mudholkar Six-Sigma: Delivering Quality to Mega Transportation Projects , 2008 .

[125]  Barbara Brown,et al.  Tennessee Department of Transportation’s Vision 2000: Reengineering the Project-Development Process , 1999 .

[126]  Mikkel Godsk,et al.  Transforming traditional lectures into problem‐based blended learning: challenges and experiences , 2007 .

[127]  Jeffrey S. Bohn,et al.  Construction Project Monitoring Using High-Resolution Automated Cameras , 2010 .

[128]  Jeffrey N Buxbaum,et al.  Protecting the Public Interest in Long-Term Concession Agreements for Transportation Infrastructure , 2008 .

[129]  Tom Sorel,et al.  THE LIFE CYCLE CONTINUUM , 2004 .

[130]  Cynthia Martin,et al.  Accelerating Highway Bridge Demolition: An Innovative Approach , 2005 .

[131]  J. Capka,et al.  MEGAPROJECTS--THEY ARE A DIFFERENT BREED , 2004 .

[132]  Harvey Maylor,et al.  And then came complex project management (revised) , 2009 .

[133]  H. Maylor Beyond the Gantt chart:: Project management moving on , 2001 .