Scheme design and real-time performance analysis of information communication network used in substation area backup protection

In smart substation, with regard to the realization of substation area backup protection (SABP) which can execute the backup protection function for whole substation, the information communication network transmitting and sharing digital signals will undoubtedly play an important role. In this paper, the realtime performance of a smart substation's process level network, which receives voltage/current sampled values (SV) message and sends generic object oriented substation event (GOOSE) message for SABP, was studied. Firstly, the structure and function of SABP were introduced, and its demands for the communication network's working performance were proposed. Besides, taking a practical 220kV smart substation for example, the process level network's structure scheme was designed for SABP, and then the time-delay characteristics of the messages including both SV and GOOSE were estimated. According to the research results, under the condition that the actuating signals of SABP come from the process level network, the time-delay characteristics of this information communication network can satisfy the requirement for the rapidity of action of backup protection. In the end, some measures which may help to reduce transmission delay further were presented in brief.

[1]  Liu Li-li Design of a Publish/Subscribe Communication Model Based on GMRP for Substation Communication , 2008 .

[2]  Xu Kelai The Simulation of Substation Communication Network Based on IEC 61850-9-2 , 2010 .

[3]  Lei Chen,et al.  Study on the Substation Area Backup Protection in Smart Substation , 2012, 2012 Asia-Pacific Power and Energy Engineering Conference.

[4]  R.E. Mackiewicz,et al.  Overview of IEC 61850 and Benefits , 2006, 2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition.

[5]  Zheng Jianyong A Method to Deal With Packet Transfer Delay of Sampled Value in Smart Substation , 2011 .

[6]  Li Gang Study of centralized protection based on digital substation , 2009 .

[7]  Wang Yi The study of a new method for digital substation centralized protection to cope with boundary information deficiency , 2011 .

[8]  Zhang Dongxia,et al.  A Study on Microgrid Standard System in China , 2010 .

[9]  Gao Dong-xue Configuration project of protect unit according to levels for smart substation , 2012 .

[10]  Jinghong Guo Study on the structure of electric power communication network of strong and Smart Grid in China , 2010, 2010 International Conference on Power System Technology.

[11]  Zhou Liangcai Centralized substation backup protection , 2009 .

[12]  Lei Chen,et al.  Impacts of digital and networked technologies used in smart substation on relay protection , 2011, 2011 International Conference on Electrical and Control Engineering.

[13]  Yang Gui,et al.  Development of the Switch Used in Process Level of Smart Substation , 2011 .