Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
暂无分享,去创建一个
[1] W. L. Meyer,et al. Extensions of the critical path method through the application of integer programming , 1963 .
[2] Aminah Robinson Fayek,et al. Fuzzy Numbers in Cost Range Estimating , 2007 .
[3] Liang-Hsuan Chen,et al. An approximate approach for ranking fuzzy numbers based on left and right dominance , 2001 .
[4] Chung-Wei Feng,et al. Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method , 1995 .
[5] Anastasia Pagnoni,et al. Project Engineering: Computer-Oriented Planning and Operational Decision Making , 1990 .
[6] Nicolai Siemens. A Simple CPM Time-Cost Tradeoff Algorithm , 1971 .
[7] D. E. Goldberg,et al. Genetic Algorithms in Search , 1989 .
[8] Baoding Liu,et al. Project scheduling problem with mixed uncertainty of randomness and fuzziness , 2007, Eur. J. Oper. Res..
[9] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[10] Aminah Robinson Fayek,et al. Use of fuzzy logic for predicting design cost overruns on building projects , 2002 .
[11] Kalyanmoy Deb,et al. A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..
[12] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[13] Sou-Sen Leu,et al. A GA-based fuzzy optimal model for construction time-cost trade-off , 2001 .
[14] Chung-Wei Feng,et al. Stochastic construction time-cost trade-off analysis , 2000 .
[15] Peter E.D. Love,et al. Using improved genetic algorithms to facilitate time-cost optimization , 1997 .
[16] Osama Moselhi,et al. Schedule compression using the direct stiffness method , 1993 .
[17] Qi Liu,et al. Ranking fuzzy numbers with an area method using radius of gyration , 2006, Comput. Math. Appl..
[18] Prabuddha De,et al. The discrete time-cost tradeoff problem revisited , 1995 .
[19] David E. Goldberg,et al. Genetic Algorithms in Search Optimization and Machine Learning , 1988 .
[20] John H. Holland,et al. Adaptation in Natural and Artificial Systems: An Introductory Analysis with Applications to Biology, Control, and Artificial Intelligence , 1992 .
[21] Reza Abbasnia,et al. Time–cost optimization: using GA and fuzzy sets theory for uncertainties in cost , 2008 .
[22] S. Thomas Ng,et al. Stochastic Time–Cost Optimization Model Incorporating Fuzzy Sets Theory and Nonreplaceable Front , 2005 .
[23] Heng Li,et al. Using machine learning and GA to solve time-cost trade-off problems , 1999 .
[24] Tarek Hegazy. Optimization of construction time-cost trade-off analysis using genetic algorithms , 1999 .
[25] Lotfi A. Zadeh,et al. Fuzzy Sets , 1996, Inf. Control..
[26] I-Tung Yang,et al. Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability , 2005 .