Effects of Regulation on Highway Pricing and Capacity Choice of a Build-Operate-Transfer Scheme

The build-operate-transfer (BOT) scheme is being used increasingly by governments in their drive to privatize major public transportation projects. In a BOT scheme, the main objective for the private investors in determining the viability of a BOT project is profit, whereas the main objective for the government is whether the construction of the BOT project will give a positive social welfare to the society. These two objectives are often seen to conflict with each other. In this paper, modeling and analysis of highway pricing and capacity choice of a BOT scheme are provided to illustrate the tradeoff between the two objectives. Regulation is normally imposed by the government to ensure that the BOT project satisfies certain requirements. Five cases of the BOT network design problem are analyzed: (1) BOT without regulation; (2) BOT with positive performance measures; (3) BOT with a maximum toll charge level; (4) BOT with a minimum roadway capacity; and (5) BOT with a maximum toll charge and a minimum roadway capacity. Numerical results using a case study of the intercity expressway in the Pearl River Delta Region in China are provided to examine the various effects of regulation on a BOT project.

[1]  C S Fisk OPTIMAL SIGNAL CONTROLS ON CONGESTED NETWORKS , 1984 .

[2]  Yosef Sheffi,et al.  Urban Transportation Networks: Equilibrium Analysis With Mathematical Programming Methods , 1985 .

[3]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[4]  J W Downer,et al.  TATE'S CAIRN TUNNEL, HONG KONG: SOUTH EAST ASIA'S LONGEST ROAD TUNNEL , 1992 .

[5]  R Swan Mexico's massive modernization , 1993 .

[6]  Robert Harrison,et al.  An overview of highway privatization , 1994 .

[7]  Gordon Mills,et al.  WELFARE AND PROFIT DIVERGENCE FOR A TOLLED LINK IN A ROAD NETWORK. , 1995 .

[8]  Peter Nijkamp,et al.  Second-best regulation of road transport externalities , 1995 .

[9]  A. J. Smith,et al.  Privatized infrastructure : the build operate transfer approach , 1995 .

[10]  Hai Yang,et al.  Models and algorithms for road network design: a review and some new developments , 1998 .

[11]  Hai Yang,et al.  HIGHWAY PRICING AND CAPACITY CHOICE IN A ROAD NETWORK UNDER A BUILD-OPERATE-TRANSFER SCHEME , 2000 .

[12]  Anthony Chen,et al.  Assessing Financial Feasibility of a Build–Operate–Transfer Project Under Uncertain Demand , 2001 .

[13]  Zhaowang Ji,et al.  Mean-Variance Model for the Build-Operate-Transfer Scheme Under Demand Uncertainty , 2003 .

[14]  Chih-Peng Chu,et al.  The analysis of regulation on private highway investment under a build-operate-transfer scheme , 2003 .

[15]  Xiaoning Zhang,et al.  Optimal Toll Design in Second-Best Link-Based Congestion Pricing , 2003 .

[16]  Anthony Chen,et al.  A simulation-based multi-objective genetic algorithm (SMOGA) procedure for BOT network design problem , 2006 .