Evaluation of execution time in programmable controller
暂无分享,去创建一个
[1] Takashi Sekiguchi,et al. A Representation of Sequential Control Systems by T-SFC , 1994 .
[2] R. W. Lewis,et al. Programming Industrial Control Systems Using IEC 1131-3 , 1995 .
[3] B.H. Krogh,et al. Design recovery for relay ladder logic , 1993, IEEE Control Systems.
[4] Shigeru Okuma,et al. A Study on Transformation from Ladder Diagram to SFC , 1996 .
[5] Wook Hyun Kwon,et al. Predicting execution time of relay ladder logic for programmable logic controllers , 1996, Proceedings 1996 IEEE Conference on Emerging Technologies and Factory Automation. ETFA '96.
[6] Alan C. Shaw,et al. Reasoning About Time in Higher-Level Language Software , 1989, IEEE Trans. Software Eng..