Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level constraint
暂无分享,去创建一个
[1] Liang-Yuh Ouyang,et al. Mixture inventory model involving variable lead time with a service level constraint , 1997, Comput. Oper. Res..
[2] Shib Sankar Sana,et al. A mathematical model on EPQ for stochastic demand in an imperfect production system , 2013 .
[3] Herbert E. Scarf,et al. A Min-Max Solution of an Inventory Problem , 1957 .
[4] Wen-Chuan Lee,et al. Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate , 2006, Appl. Math. Comput..
[5] Biswajit Sarkar,et al. Integrated vendor-buyer supply chain model with vendor's setup cost reduction , 2013, Appl. Math. Comput..
[6] G. Gallego,et al. Distribution Free Procedures for Some Inventory Models , 1994 .
[7] M. Mahdi Tajbakhsh,et al. On the distribution free continuous-review inventory model with a service level constraint , 2010, Comput. Ind. Eng..
[8] Adiel Teixeira de Almeida,et al. Modeling a multi-attribute utility newsvendor with partial backlogging , 2012, Eur. J. Oper. Res..
[9] B. Sarkar,et al. An economic production quantity model with random defective rate, rework process and backorders for a single stage production system , 2014 .
[10] Evan L. Porteus. Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction , 1986, Oper. Res..
[11] Ilkyeong Moon,et al. The distribution free continuous review inventory system with a service level constraint , 1994 .
[12] Wei-Min Ma,et al. Distribution-Free Continuous Review Inventory Model with Controllable Lead Time and Setup Cost in the Presence of a Service Level Constraint , 2012 .
[13] Guillermo Gallego,et al. Inventory management under highly uncertain demand , 2007, Oper. Res. Lett..
[14] Kripa Shanker,et al. Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints , 2013 .
[15] B. Sarkar,et al. Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process , 2014 .
[16] Seyed Taghi Akhavan Niaki,et al. Optimizing a bi-objective multi-product EPQ model with defective items, rework and limited orders: NSGA-II and MOPSO algorithms , 2013 .
[17] Won Young Yun,et al. The distribution free job control problem , 1997 .
[18] Ag Ton de Kok,et al. On the (R,s,Q) inventory model when demand is modelled as a compound Bernoulli process , 1998 .
[19] I. Moon,et al. The Distribution Free Newsboy Problem with Balking , 1995 .
[20] Edward A. Silver,et al. Changing the givens in modelling inventory problems: the example of just-in-time systems , 1992 .
[21] Stephen G. Powell,et al. Manufacturer incentives to improve retail service levels , 1998 .
[22] Patrick S. Chen,et al. Improved inventory models with service level and lead time , 2005, Comput. Oper. Res..
[23] Ilkyeong Moon,et al. Distribution free procedures for make-to-order (MTO), make-in-advance (MIA), and composite policies , 1997 .
[24] Elizabeth M. Jewkes,et al. Optimal investment in setup reduction in manufacturing systems with WIP inventories , 2001, Eur. J. Oper. Res..
[25] G. Gallego,et al. The Distribution Free Newsboy Problem: Review and Extensions , 1993 .
[26] Liang-Yuh Ouyang,et al. Quality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production process , 2002, Comput. Oper. Res..
[27] Ilkyeong Moon,et al. Min-max distribution free continuous-review model with a service level constraint and variable lead time , 2014, Appl. Math. Comput..
[28] Kripa Shanker,et al. Two-echelon supply chain inventory model with controllable lead time and service level constraint , 2009, Comput. Ind. Eng..
[29] Yan-Chun Chen. An optimal production and inspection strategy with preventive maintenance error and rework , 2013 .
[30] Gerrit K. Janssens,et al. A linear programming formulation for an inventory management decision problem with a service constraint , 2011, Expert Syst. Appl..
[31] Liang-Yuh Ouyang,et al. A note on periodic review inventory model with controllable setup cost and lead time , 2004, Comput. Oper. Res..