A systematic approach to develop risk registry frameworks for complex projects

Purpose The purpose of this paper is to build upon the extensive application of risk registries in the construction literature and establish a systematic methodology to develop risk registries. Risk registries channel judgment of experts as a basis for risk analysis and should be tailored for each project to be more effective. Given their prevalence, there is a need for systematic integration of tacit and explicit knowledge to develop practical risk registries. Design/methodology/approach A combined approach is proposed using the systematic literature review (SLR) technique to integrate explicit knowledge and Delphi technique to integrate tacit knowledge in the development of risk registries. This two-step approach further increases the robustness of the registries by validating them through integrating and contrasting multiple forms of knowledge for a tailored risk registry. Findings The application of the proposed approach indicates that the use of multiple forms of knowledge can increase the robustness and practicality of risk registries. It also showcased its potential in the development of risk registries for complex projects. Examples include modification of risk factors obtained from the explicit sources of knowledge based on contextual tacit knowledge. Originality/value The proposed approach is an imperative step to standardize the development of risk registries. With its inherent validation process through integrating and contrasting tacit and explicit knowledge, practitioners can use this approach to develop practical risk registries for different categories of projects. Integrating different forms of knowledge can increase the impact of registries beyond risk assessment and in contexts such as decision making and performance assessment.

[1]  Barbara Kitchenham,et al.  Procedures for Performing Systematic Reviews , 2004 .

[2]  David Arditi,et al.  Perceptions of Process Quality in Building Projects , 1999 .

[3]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[4]  David B. Ashley,et al.  Political Risks in International Construction , 1987 .

[5]  Hui-Chi Huang,et al.  Development of a fall-risk checklist using the Delphi technique. , 2008, Journal of clinical nursing.

[6]  H Roberts,et al.  Evidence, hierarchies, and typologies: horses for courses , 2003, Journal of epidemiology and community health.

[7]  Sameh M. El-Sayegh,et al.  Risk Assessment and Allocation in Highway Construction Projects in the UAE , 2015 .

[8]  A. Akintoye,et al.  The allocation of risk in PPP/PFI construction projects in the UK , 2005 .

[9]  I Ben-David,et al.  An integrated approach for risk response development in project planning , 2001, J. Oper. Res. Soc..

[10]  D. Lang,et al.  Systematic student-driven literature reviews in sustainability science – an effective way to merge research and teaching , 2016 .

[11]  A. V. D. Ven,et al.  Group Techniques for Program Planning , 1975 .

[12]  Ming-Teh Wang,et al.  Risk Allocation and Risk Handling of Highway Projects in Taiwan , 2003 .

[13]  Keith R. Molenaar,et al.  Enterprise Risk Management Strategies for State Departments of Transportation , 2013 .

[14]  Alfredo del Caño,et al.  Integrated Methodology for Project Risk Management , 2002 .

[15]  Samuel DiGangi,et al.  Assessing unidimensionality: A comparison of Rasch modeling, Parallel analysis, and TETRAD , 2007 .

[16]  Pearl Brereton,et al.  Systematic literature reviews in software engineering - A systematic literature review , 2009, Inf. Softw. Technol..

[17]  Guilherme Horta Travassos,et al.  Evaluation Approaches for Software Architectural Documents: a Systematic Review , 2006, CIbSE.

[18]  Pearl Brereton,et al.  Lessons from applying the systematic literature review process within the software engineering domain , 2007, J. Syst. Softw..

[19]  Amr A. G. Hassanein,et al.  A risk identification procedure for construction contracts—a case study of power station projects in Egypt , 2007 .

[20]  Peter E.D. Love,et al.  Triangulation in construction management research , 2002 .

[21]  Margaret J. Foster,et al.  What Is the State of theArt of Systematic Reviewin Engineering Education? , 2015 .

[22]  B. Hwang,et al.  Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms , 2013 .

[23]  Terry M Willams,et al.  Using a risk register to integrate risk management in project definition , 1994 .

[24]  B. Hwang,et al.  Public private partnership projects in Singapore factors, critical risks and preferred risk allocation from the perspective of contractors / , 2013 .

[25]  Pearl Brereton,et al.  Does the technology acceptance model predict actual use? A systematic literature review , 2010, Inf. Softw. Technol..

[26]  Nader Naderpajouh,et al.  A Risk Registry for Renegotiation in Public-Private Partnership (PPP) Projects: ICRAM-PPP , 2016 .

[27]  Modeling Three-Party Interactional Risks in the Governance of Public–Private Partnerships , 2018, Journal of Management in Engineering.

[28]  Makarand Hastak,et al.  ICRAM-1: Model for International Construction Risk Assessment , 2000 .

[29]  Public private partnerships/private finance initiatives for financing infrastructure in public tertiary institutions in Nigeria , 2014 .

[30]  Stephen O. Ogunlana,et al.  Assessment of risks in high rise building construction in Jakarta , 2003 .

[31]  C. Nelms A risk identification framework and tool for large infrastructure public private partnership delivery , 2012 .

[32]  M. Loosemore,et al.  Perceptions of Contractual Risk Allocation in Construction Supply Chains , 2008 .

[33]  J. Luis Guasch,et al.  Concessions of infrastructure in Latin America: Government-led renegotiation , 2007 .

[34]  Chia-Chien Hsu,et al.  Minimizing Non-Response in The Delphi Process: How to Respond to Non-Response , 2007 .

[35]  Ofer Zwikael,et al.  The Effectiveness of Risk Management: An Analysis of Project Risk Planning Across Industries and Countries , 2011, Risk analysis : an official publication of the Society for Risk Analysis.

[36]  Baks Perera,et al.  Identification and assessment risks in maintenance operations , 2014 .

[37]  Magne Jørgensen,et al.  A Systematic Review of Software Development Cost Estimation Studies , 2007 .

[38]  R. Levitt,et al.  Opportunism-Focused Transaction Cost Analysis of Public-Private Partnerships , 2015 .

[39]  Yongtae Park,et al.  Large engineering project risk management using a Bayesian belief network , 2009, Expert Syst. Appl..

[40]  John A. Gambatese,et al.  Qualitative Research: Application of the Delphi Method to CEM Research , 2010 .

[41]  Mundia Muya,et al.  Risk identification on community‐based construction projects in Zambia , 2008 .

[42]  Lihong Zhou,et al.  Supporting decision making in risk management through an evidence-based information systems project risk checklist , 2008, Inf. Manag. Comput. Secur..

[43]  Scott Reeves,et al.  Twelve tips for undertaking a systematic review , 2002, Medical teacher.

[44]  Helen Sharp,et al.  Motivation in Software Engineering: A systematic literature review , 2008, Inf. Softw. Technol..

[45]  M. Lewis,et al.  Are Public-Private Partnerships a Healthy Option? A Systematic Literature Review , 2014, Social science & medicine.

[46]  V. Mitchell,et al.  The Role of Geodemographics in Segmenting and Targeting Consumer Markets , 1994 .

[47]  Irem Dikmen,et al.  Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects , 2011 .

[48]  Suzanne D. Pawlowski,et al.  The Delphi method as a research tool: an example, design considerations and applications , 2004, Inf. Manag..

[49]  Lars-Erik Gadde,et al.  The construction industry as a loosely coupled system: implications for productivity and innovation , 2002 .

[50]  Ibrahim Mahamid,et al.  Risk matrix for factors affecting time delay in road construction projects: owners' perspective , 2011 .

[51]  K. Neailey,et al.  A Risk Register Database System to aid the management of project risk , 2002 .

[52]  J. Froyd,et al.  Systematic Literature Reviews in Engineering Education and Other Developing Interdisciplinary Fields , 2014 .

[53]  Muhammad Sohail,et al.  The Delphi Method: Review and Use in Construction Management Research , 2015 .

[54]  Anna Corinna Cagliano,et al.  Choosing project risk management techniques. A theoretical framework , 2015 .

[55]  Henry Muccini,et al.  Protocol for a Systematic Mapping Study on Collaborative Model-Driven Software Engineering , 2016, ArXiv.

[56]  A. Chan,et al.  Risk Factors of Public-Private Partnership Projects in China: Comparison between the Water, Power, and Transportation Sectors , 2011 .

[57]  Helga Drummond,et al.  MIS and illusions of control: an analysis of the risks of risk management , 2011, J. Inf. Technol..

[58]  Albert P.C. Chan,et al.  Exploring the key risks and risk mitigation measures for guaranteed maximum price and target cost contracts in construction , 2010 .

[59]  David Arditi,et al.  Factors Affecting International Construction , 2005 .