The Discrete Time-Cost-Quality Trade-off Problem Using a Novel Hybrid Genetic Algorithm
暂无分享,去创建一个
[1] James E. Kelley,et al. Critical-path planning and scheduling , 1899, IRE-AIEE-ACM '59 (Eastern).
[2] D. R. Fulkerson. A Network Flow Computation for Project Cost Curves , 1961 .
[4] Sou-Sen Leu,et al. A GA-based fuzzy optimal model for construction time-cost trade-off , 2001 .
[5] D. R. Robinson. A Dynamic Programming Solution to Cost-Time Tradeoff for CPM , 1975 .
[6] Hamed R. Tareghian,et al. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search , 2007, Appl. Math. Comput..
[7] Nicolai Siemens. A Simple CPM Time-Cost Tradeoff Algorithm , 1971 .
[8] Amir Azaron,et al. A genetic algorithm approach for the time-cost trade-off in PERT networks , 2005, Appl. Math. Comput..
[9] Amir Azaron,et al. Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach , 2007, Eur. J. Oper. Res..
[10] Hassan Taheri,et al. An application of randomized minimum cut to the project time/cost tradeoff problem , 2006, Appl. Math. Comput..
[11] Mohan M. Kumaraswamy,et al. Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization , 2004 .
[12] Abbas Afshar,et al. MULTI-OBJECTIVE OPTIMIZATION OF TIME-COST-QUALITY USING MULTI-COLONY ANT ALGORITHM , 2007 .
[13] Lin Yan,et al. Research on the fully fuzzy time-cost trade-off based on genetic algorithms , 2005 .
[14] Prabuddha De,et al. Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks , 1997, Oper. Res..
[15] Erik Demeulemeester,et al. Optimal procedures for the discrete time/cost trade-off problem in project networks , 1996 .
[16] William Prager. A Structural Method of Computing Project Cost Polygons , 1963 .
[17] Nalina Suresh,et al. Project management with time, cost, and quality considerations , 1996 .
[18] Shiang-Tai Liu,et al. FUZZY ACTIVITY TIMES IN CRITICAL PATH AND PROJECT CRASHING PROBLEMS , 2003, Cybern. Syst..
[19] H. Iranmanesh,et al. Finding Pareto Optimal Front for the Multi- Mode Time, Cost Quality Trade-off in Project Scheduling , 2008 .
[20] Chung-Wei Feng,et al. Using genetic algorithms to solve construction time-cost trade-off problems , 1997 .
[21] Joseph J. Moder,et al. Project Management With Cpm, Pert and Precedence Diagramming , 1983 .
[22] John F. Muth,et al. A Dynamic Programming Algorithm for Decision CPM Networks , 1979, Oper. Res..
[23] Reza Abbasnia,et al. Optimization of uncertain construction time-cost trade-off problem , 2008 .
[24] J. Horowitz,et al. Critical Path Problems with Concave Cost-Time Curves , 1972 .
[25] James E. Kelley,et al. Critical-Path Planning and Scheduling: Mathematical Basis , 1961 .
[26] O. Hasançebi,et al. Evaluation of crossover techniques in genetic algorithm based optimum structural design , 2000 .
[27] Khaled A El-Rayes,et al. Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .
[28] Hamed R. Tareghian,et al. On the discrete time, cost and quality trade-off problem , 2006, Appl. Math. Comput..
[29] Prabuddha De,et al. The discrete time-cost tradeoff problem revisited , 1995 .
[30] S. K. Goyal. Note---A Note on “A Simple CPM Time-Cost Tradeoff Algorithm” , 1975 .
[31] Morteza Bagherpour,et al. Cost - Time Trade Off Models Application to Crashing Flow Shop Scheduling Problems , 2006, ICCSA.
[32] Do Ba Khang,et al. Time, cost and quality trade-off in project management: a case study , 1999 .
[33] K. Kapur. An Algorithm for Project Cost-Duration Analysis Problem with Quadratic and Convex Cost Functions , 1973 .