Scheduling policies for remanufacturing
暂无分享,去创建一个
[1] V. D. R. Guide. Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .
[2] William L. Maxwell,et al. An Experimental Investigation of Priority Dispatching in Aircraft Maintenance, Using a Simplified Model , 1974 .
[3] Ada S. Rousso,et al. PACKAGING TAXES AND RECYCLING INCENTIVES: THE GERMAN GREEN DOT PROGRAM , 1994, National Tax Journal.
[4] Bernard W. Taylor,et al. An evaluation of scheduling policies in a dual resource constrained assembly shop , 1985 .
[5] Rommert Dekker,et al. Production planning and inventory control for remanufacturable durable products , 1996 .
[6] Marc Salomon,et al. Strategic Issues in Product Recovery Management , 1995 .
[7] William L. Maxwell,et al. Theory of scheduling , 1967 .
[8] R. Guide,et al. Rough-cut capacity planning for remanufacturing firms , 1997 .
[9] Jack S. Goodwin,et al. Evaluating Scheduling Policies in a Multi-Level Assembly System , 1986 .
[10] William L. Berry,et al. Manufacturing Planning and Control Systems , 1984 .
[11] K. K. Tsang,et al. Priority dispatching rules in a fabrication/assembly shop , 1990 .
[12] Braden Allenby,et al. The greening of industrial ecosystems , 1994 .
[13] Prem Vrat,et al. A simulation study of unit exchange spares management of diesel locomotives in the Indian railways , 1994 .
[14] William L. Maxwell,et al. Multiple‐factor rules for sequencing with assembly constraints , 1968 .
[15] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[16] Philip Y. Huang,et al. A comparative study of priority dispatching rules in a hybrid assembly/job shop , 1984 .
[17] D. Sculli. Priority dispatching rules in an assembly shop , 1987 .
[18] A. Tamhane,et al. Multiple Comparison Procedures , 1989 .
[19] Simme Douwe P. Flapper,et al. On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies , 1994 .
[20] T. Fry,et al. Sequencing rules, progress milestones and product structure in a multistage job shop , 1989 .
[21] Jwm Will Bertrand,et al. Priority assignment procedures in multi-level assembly job shops , 1987 .
[22] J. Kleijnen. Statistical tools for simulation practitioners , 1986 .
[23] Ezey M. Dar-El,et al. Job shop scheduling—A systematic approach , 1982 .
[24] Timothy D. Fry,et al. The effects of product structure and sequencing rule on assembly shop performance , 1989 .
[25] Joseph R. Biggs. Priority rules for shop floor control in a material requirements planning system under various levels of capacity , 1985 .
[26] Michael R. Johnson,et al. Planning product disassembly for material recovery opportunities , 1995 .
[27] Bernard W. Taylor,et al. AN EVALUATION OF SEQUENCING RULES FOR AN ASSEMBLY SHOP , 1985 .
[28] James C. Goodwin,et al. OPERATING POLICIES FOR SCHEDULING ASSEMBLED PRODUCTS , 1982 .
[29] D Sculli. Priority dispatching rules in job shops with assembly operations and random delays , 1980 .
[30] Michael P. Hottenstein,et al. Expediting in Job-Order-Control Systems: A Simulation Study , 1970 .