Scheduling policies for remanufacturing

Abstract Recoverable product environments are part of strategies to increase product life and prevention of waste through repair, remanufacturing and recycling of products. A key part of this type of environment is the recoverable manufacturing system designed to extend product life through repair and remanufacturing. Remanufacturing systems are faced with a greater degree of uncertainty and complexity than traditional new manufacturing systems, leading to the need for planning and control systems designed to deal with the added uncertainty and complexity. In this study of a remanufacturing facility, two key activities in planning and controlling, disassembly release mechanisms (DRMs) and priority dispatching rules (PDRs) are examined via a simulation model. The results indicate that simple due-date-based priority dispatching procedures generally perform well for a variety of performance measures. Disassembly release mechanisms, as examined in this study, had very little impact and as a result practicing managers should favor the simplest to implement and manage mechanisms.

[1]  V. D. R. Guide Scheduling using drum-buffer-rope in a remanufacturing environment , 1996 .

[2]  William L. Maxwell,et al.  An Experimental Investigation of Priority Dispatching in Aircraft Maintenance, Using a Simplified Model , 1974 .

[3]  Ada S. Rousso,et al.  PACKAGING TAXES AND RECYCLING INCENTIVES: THE GERMAN GREEN DOT PROGRAM , 1994, National Tax Journal.

[4]  Bernard W. Taylor,et al.  An evaluation of scheduling policies in a dual resource constrained assembly shop , 1985 .

[5]  Rommert Dekker,et al.  Production planning and inventory control for remanufacturable durable products , 1996 .

[6]  Marc Salomon,et al.  Strategic Issues in Product Recovery Management , 1995 .

[7]  William L. Maxwell,et al.  Theory of scheduling , 1967 .

[8]  R. Guide,et al.  Rough-cut capacity planning for remanufacturing firms , 1997 .

[9]  Jack S. Goodwin,et al.  Evaluating Scheduling Policies in a Multi-Level Assembly System , 1986 .

[10]  William L. Berry,et al.  Manufacturing Planning and Control Systems , 1984 .

[11]  K. K. Tsang,et al.  Priority dispatching rules in a fabrication/assembly shop , 1990 .

[12]  Braden Allenby,et al.  The greening of industrial ecosystems , 1994 .

[13]  Prem Vrat,et al.  A simulation study of unit exchange spares management of diesel locomotives in the Indian railways , 1994 .

[14]  William L. Maxwell,et al.  Multiple‐factor rules for sequencing with assembly constraints , 1968 .

[15]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[16]  Philip Y. Huang,et al.  A comparative study of priority dispatching rules in a hybrid assembly/job shop , 1984 .

[17]  D. Sculli Priority dispatching rules in an assembly shop , 1987 .

[18]  A. Tamhane,et al.  Multiple Comparison Procedures , 1989 .

[19]  Simme Douwe P. Flapper,et al.  On the logistic aspects of integrating procurement, production and recycling by lean and agile-wise manufacturing companies , 1994 .

[20]  T. Fry,et al.  Sequencing rules, progress milestones and product structure in a multistage job shop , 1989 .

[21]  Jwm Will Bertrand,et al.  Priority assignment procedures in multi-level assembly job shops , 1987 .

[22]  J. Kleijnen Statistical tools for simulation practitioners , 1986 .

[23]  Ezey M. Dar-El,et al.  Job shop scheduling—A systematic approach , 1982 .

[24]  Timothy D. Fry,et al.  The effects of product structure and sequencing rule on assembly shop performance , 1989 .

[25]  Joseph R. Biggs Priority rules for shop floor control in a material requirements planning system under various levels of capacity , 1985 .

[26]  Michael R. Johnson,et al.  Planning product disassembly for material recovery opportunities , 1995 .

[27]  Bernard W. Taylor,et al.  AN EVALUATION OF SEQUENCING RULES FOR AN ASSEMBLY SHOP , 1985 .

[28]  James C. Goodwin,et al.  OPERATING POLICIES FOR SCHEDULING ASSEMBLED PRODUCTS , 1982 .

[29]  D Sculli Priority dispatching rules in job shops with assembly operations and random delays , 1980 .

[30]  Michael P. Hottenstein,et al.  Expediting in Job-Order-Control Systems: A Simulation Study , 1970 .