The development of a confidence interval-based importance-performance analysis by considering variability in analyzing service quality

The traditional importance-performance analysis (IPA) uses the mean ratings of importance and performance to construct a two-dimensional grid by identifying improvement opportunities and guiding strategic planning efforts. The point estimates of importance and performance vary from sample to sample such that the numerical analyses are different based upon different samples. Thus, using point estimates for items might lead the management to make false decisions. This study integrates confidence intervals and IPA to reduce the variability which enables the decision maker much easier to identify the strengths and weaknesses based upon the sample of size used. Moreover, the assumptions of equal and unequal population variances for constructing confidence intervals are discussed.

[1]  Jeffrey L Marion,et al.  Visitor Evaluations of Management Actions at a Highly Impacted Appalachian Trail Camping Area , 2006, Environmental management.

[2]  Ian Richardson,et al.  Diagnosing information systems success: importance-performance maps in the health club industry , 2001, Inf. Manag..

[3]  Lee A. Graf,et al.  Importance-Satisfaction Analysis: A Diagnostic Tool for Organizational Change (Анализ "важность-удовлетворенность": диагностический инструмент для организационного изменения) , 1992 .

[4]  Simha R. Magal,et al.  Using Importance-Performance Analysis to Evaluate E-Business Strategies among Small Businesses , 2005, Proceedings of the 38th Annual Hawaii International Conference on System Sciences.

[5]  Hsin-Hung Wu,et al.  Applying importance-performance analysis to compare the changes of a convenient store , 2009 .

[6]  John A. Martilla,et al.  Importance-Performance Analysis , 1977 .

[7]  Jacob Eskildsen,et al.  Enhancing importance‐performance analysis , 2006 .

[8]  Ying-Feng Kuo,et al.  Revised importance–performance analysis: three-factor theory and benchmarking , 2008 .

[9]  A. C. Rencher Methods of multivariate analysis , 1995 .

[10]  Lisa Gardner,et al.  The indicator performance estimate approach to determining acceptable wilderness conditions , 1994 .

[11]  David M. Levine,et al.  Statistics for Managers Using Microsoft® Excel , 1997 .