Cycle time reduction in assembly line through layout improvement, ergonomics analysis and lean principles
暂无分享,去创建一个
[1] Riyadh Mohammed,et al. Selection of Balancing Method for Manual Assembly Line of Two Stages Gearbox , 2013 .
[2] Kannan Rassiah,et al. Line Balancing Analysis of Tuner Product Manufacturing , 2011 .
[3] Costas S. Iliopoulos,et al. IACSIT International Journal of Engineering and Technology , 2013 .
[4] Naveen Kumar,et al. Assembly Line Balancing: A Review of Developments and Trends in Approach to Industrial Application , 2013 .
[5] Wisitsree Wiyaratn,et al. Improvement Plant Layout Based on Systematic Layout Planning , 2013 .
[6] S M Qutubuddin,et al. Ergonomic Evaluation of Tasks Performed by Workers in Manual Brick Kilns in Karnataka,India , 2013 .
[7] Erik Skov Madsen,et al. 22nd International Conference on Production Research , 2013 .