Risk Assessment and Decision Support
暂无分享,去创建一个
[1] David Cleden,et al. Managing Project Uncertainty , 2012 .
[2] Anna-Mari Heikkilä,et al. Inherent safety in process plant design : an index-based approach , 1999 .
[3] Darius Migilinskas,et al. Methodology of Risk and Uncertainty Management in Construction’s Technological and Economical Problems , 2008 .
[4] Didier Gourc,et al. The Life Cycle of Technical Projects , 2002 .
[5] Achintya Haldar,et al. Probability, Reliability and Statistical Methods in Engineering Design (Haldar, Mahadevan) , 1999 .
[6] Jan Erik Vinnem,et al. A decision framework for risk management, with application to the offshore oil and gas industry , 2007, Reliab. Eng. Syst. Saf..
[7] J. Gough,et al. Environmental Decision Making and Risk Management for Groundwater Systems , 1997 .
[8] Margaret M. Wiecek,et al. A review of different perspectives on uncertainty and risk and an alternative modeling paradigm , 2009, Reliab. Eng. Syst. Saf..
[9] D. Pons,et al. Design with uncertain qualitative variables under imperfect knowledge , 2004, IEEE Engineering Management Review.
[10] I. Lerche. Geological risk and uncertainty in oil exploration , 1997 .
[11] S. Rahman. Reliability Engineering and System Safety , 2011 .
[12] Glyn A. Holton. Perspectives: Defining Risk , 2004 .
[13] E. Friedman. Life cycle. , 2003, Health Forum journal.
[14] Terje Aven,et al. On how to define, understand and describe risk , 2010, Reliab. Eng. Syst. Saf..
[15] Ulrich Hauptmanns. Semi-quantitative fault tree analysis for process plant safety using frequency and probability ranges , 2004 .
[16] Terje Aven,et al. A new perspective on Renn and Klinke's approach to risk evaluation and management , 2006, Reliab. Eng. Syst. Saf..
[17] Yosef S. Sherif,et al. On risk and risk analysis , 1991 .
[18] D. M. Rasmuson,et al. Uncertainties in Nuclear Probabilistic Risk Analyses , 1984 .
[19] Jan Erik Vinnem,et al. Risk Management: With Applications from the Offshore Petroleum Industry , 2007 .
[20] Y. Ronen. Uncertainty Analysis , 1988 .
[21] Ortwin Renn,et al. The role of risk perception for risk management , 1998 .
[22] M. Elisabeth,et al. Learning from the Piper Alpha Accident: A Postmortem Analysis of Technical and Organizational Factors , 1993 .
[23] M. Paté-Cornell. Learning from the Piper Alpha Accident: A Postmortem Analysis of Technical and Organizational Factors , 1993 .
[24] Trevor Kletz,et al. Learning from Accidents , 2001 .
[25] Robert E. Melchers,et al. On the ALARP approach to risk management , 2001, Reliab. Eng. Syst. Saf..
[26] Financial Analysts Federation. The financial analysts journal , 1960 .
[27] Peter Watermeyer. Handbook for Process Plant Project Engineers , 2002 .
[28] John X. Wang,et al. What Every Engineer Should Know About Risk Engineering and Management , 2000 .
[29] Mimi Haryani Hassim,et al. Technical Analysis of Accident in Chemical Process Industry and Lessons Learnt , 2010 .
[30] Mauro Mancini,et al. A Multi-Dimensional Analysis of Major Risks in Complex Projects , 2007 .
[31] C. Vaught,et al. Judgment and decision making under stress: an overview for emergency managers , 2003 .
[32] N. Reynard,et al. Climate adaptation: Risk, uncertainty and decision-making. UKCIP Technical Report , 2003 .
[33] William M. K. Trochim,et al. Research methods knowledge base , 2001 .
[34] Chris Chapman,et al. Project Risk Management. Process, Techniques and Insights. Second Edition , 2003 .
[35] D. Isenberg. Decision Making: HOW SENIOR MANAGERS THINK , 1988 .
[36] A. Saltelli,et al. Reliability Engineering and System Safety , 2008 .
[37] A. Karimi,et al. Master‟s thesis , 2011 .
[38] K Tattari,et al. Proactive risk management in winter maintenance , 2011 .
[39] J. U. M. Smith,et al. Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..
[40] Timothy A. Wheeler,et al. Guidance on the Treatment of Uncertainties Associated with PRAs in Risk-Informed Decision Making , 2009 .
[41] Monika Filipsson,et al. Uncertainty, variability and environmental risk analysis , 2011 .